Planning application
Land Off Mottram Old Road Hyde SK14 3BE
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Outline application, with all matters reserved other than access, for the demolition of certain existing building and structures, and the redevelopment of the site for a residential-led, mixed-use development comprising; residential dwellings (Use Classes C3 and C2); local centres including retail, commercial and community uses (Use Classes E(a)-(g)(i); F1; F2 and Sui generis); Education Land/ Facilities and Community Facilities (Use Classes F1, F2(b)-(d); E(d)-(f)); new bridge connection to Hattersley; and associated infrastructure, open space and landscaping
As published by the council, reference 21/01171/OUT
Application record
- Reference
- 21/01171/OUT
- Type
- Outline Planning Permission
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 1 Oct 2021
- Validated
- 30 Nov 2021
- Decided
- 31 Mar 2026
- Ward
- Hyde Godley
- Parish
- Hyde
- Decision by
- Committee (Speakers Panel) Decision
- Postcode
- SK14 3BE
Site history
Applications at this address on the Tameside register
This site has had 5 applications since 2021: 1 approved, 0 refused.
-
26/00883/MATCH Awaiting decision
Land Off Mottram Old Road Hyde SK14 3BE
Non-material amendment to planning application reference 21/01171/OUT. Amendment to the wording of Condition 4 (Approved Plans) to reflect the latest version of the access drawings for the avoidance of doubt to ensure compliance with the development plan.
-
26/00080/PLCOND Awaiting decision
Land Off Mottram Old Road Hyde SK14 3BE
Full discharge of Condition 7 (Site Wide Design Code) of planning reference 21/01171/OUT
-
26/00052/PLCOND Awaiting decision
Land Off Mottram Old Road Hyde SK14 3BE
Full discharge of condition 42 (Stakeholder and Residents Liaison Group) from planning reference 21/01171/OUT
-
26/00038/PLCOND Awaiting decision
Land Off Mottram Old Road Hyde SK14 3BE
Discharge of Condition 20 (Remediation Strategy), Condition 23 (LEMP), Condition 24 (Tree Retention and Protection Plan), Condition 26 (Preliminary Ecological Appraisal) and Condition 40 (Gas Main) of planning reference 21/01171/OUT
Timeline
Dates from the published record
-
1 Oct 2021
Received by Tameside
-
30 Nov 2021
Validated
Checked as complete and ready for consideration.
-
31 Mar 2026
Decision issued: Approve
-
16 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
26/00883/MATCH Awaiting decision
Land Off Mottram Old Road Hyde SK14 3BE
Non-material amendment to planning application reference 21/01171/OUT. Amendment to the wording of Condition 4 (Approved Plans) to reflect the latest version of the access drawings for the avoidance of doubt to ensure compliance with the development plan.
- Buildingcontrol: 26/00809/INIT (Initial notice accepted)
- Buildingcontrol: 26/00833/INIT (Initial notice accepted)
Who's behind it
Company information only, from the register and Companies House
Tameside Metropolitan Borough Council Applicant
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
The council's own list, drawings first
606 documents on file for this application
Drawings (138)
- Proposed catchment plan
- Proposed catchment plan
- Proposed catchment overview plan
- Proposed foul water catchment plan
- Proposed foul water catchment plan
- Proposed foul water phase 1 option
- Illustrative masterplan
- Illustrative masterplan
- Illustrative masterplan
- Amended illustrative framework masterplan
- Masterplan evolution.pdf
- Es chapter landscape and visual
- Parameter plan
- Parameter plan
- Parameter plan
- Parameter plan
- Parameter plan
- Parameter plan
- Parameter plan
- Parameter plan
- Esa figure land use parameter plan
- Esa figure 4.2 building heights parameter plan
- Esa figure movement and access parameter plan
- Mottram old road western village puffin crossing general arrangemen
- Retained & removed buildings
- Infrastructure phasing plan
- Parameter plan
- Western village access junction no 2 general arrangement
- Mottram old road corridor improvements
- Eastern village ghost island junction general arrangement
- Eastern village ghost island junction general arrangement
- Western village ghost island junction general arrangement
- Esa figure eastern village ghost island junction general arrangement
- Esa figure western village access junction general arrangement
- Esa figure western village ghost island junction general arrangement
- Esa figure green infrastructure parameter plan
- Condition reference plan
- Council owned land to be referenced in condition
- Third party owned land to be referenced in condition
- Mottram old road corridor improvements
- Mottram old road western village puffin crossing general arrangement
- Mottram old road eastern village pegasus crossing general arrangement
- Eastern village ghost island junction general arrangement
- Eastern village ghost island junction general arrangement
- Western village ghost island junction general arrangement
- Site phasing plan
- Parameter plan
- Parameter plan
- Parameter plan
- Site phasing plan
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Topographical survey
- Amended land safeguarding plan mottram old road
- Amended parameter plan
- Amended buildings retained removed
- Constraints plan
- Leisure complex car park access
- Location plan
- Location plan
- Esa figure site location plan
- Esa appendix lighting monitoring location plan
- Amended site location plan
- Es appendix residential receptor location plan.pdf
- Es appendix light monitoring location plan.pdf
- Existing catchment watercourse network and cumulative flows
- Existing catchment plan
Everything on file (606)
- S106 AGREEMENT
- DECISION NOTICE
- S106 AGREEMENT
- AVISON YOUNG RESPONSE LETTER
- FORMAL PROCEDURAL COMPLAINT TO HEAD OF PLANNING AND TRANSPORTATION
- CONSULTATION RESPONSE - BURY MBC
- CONSULTATION RESPONSE - UU
- CONSULTATION RESPONSE - SALFORD COUNCIL
- PARAMETER PLAN - LAND USE
- EIA STATEMENT OF CONFORMITY
- AMENDED DOCUMENTATION COVER LETTER 121125
- EIA STATEMENT OF CONFORMITY
- PARAMETER PLAN - GREEN INFRASTRUCTURE
- PARAMETER PLAN - LAND USE
- PARAMETER PLAN - BUILDING HEIGHTS
- PARAMETER PLAN - MOVEMENT AND ACCESS
- LOCATION PLAN
- ILLUSTRATIVE MASTERPLAN - LR
- ILLUSTRATIVE MASTERPLAN
- DESIGN & ACCESS STATEMENT ADDENDUM OCTOBER 2025 | C6012 DAS 01 REV A
- OVERARCHING PROJECT DESIGN FOR ARCHAEOLOGICAL TRIAL TRENCHING EVALUATION: GODLEY
- PROJECT DESIGN FOR HISTORIC BUILDING RECORDING
- CONSULTATION RESPONSE - GMAAS
- CONSULTATION RESPONSE - GMEU
- CONSULTATION RESPONSE - STOCKPORT COUNCIL
- CONSULTATION RESPONSE - LHA
- CONSULTATION RESPONSE - PEAK DISTRICT NATIONAL PARK
- CONSULTATION RESPONSE - NHS
- CONSULTATION RESPONSE - SPORT ENGLAND
- CONSULTATION RESPONSE - SPORT ENGLAND SPORTS FACILITIES CALCULATOR
- CONSULTATION RESPONSE - TRANS PENNINE
- CONSULTATION RESPONSE - PEAK PARK
- CONSULTATION RESPONSE - GMAAS
- CONSULTATION RESPONSE - NATIONAL HIGHWAYS
- CONSULTATION RESPONSE - SPORT ENGLAND
- CONSULTATION RESPONSE - ENVIRO AGENCY
- CONSULTATION RESPONSE - FORESTRY COMMISSION (1)
- CONSULTATION RESPONSE - FORESTRY COMMISSION (2)
- CONSULTATION RESPONSE - FORESTRY COMMISSION (3)
- CONSULTATION RESPONSE - MINERALS
- CONSULTATION RESPONSE - NATURAL ENGLAND
- CONSULTATION RESPONSE - CONTAMINATED LAND
- SALFORD COUNCIL CORRESPONDENCE
- CONSULTATION RESPONSE - TREES
- GG AMENDED PHASING STRATEGY
- CONSULTATION RESPONSE - COAL
- CONSULTATION RESPONSE - HIGH PEAK
- CONSULTATION RESPONSE - SALFORD COUNCIL
- CONSULTATION RESPONSE - SALFORD COUNCIL
- CONSULTATION RESPONSE - HISTORIC ENGLAND
- CONSULTATION RESPONSE - SALFORD COUNCIL
- CONSULTATION RESPONSE - ACTIVE TRAVEL
- DESIGN & ACCESS STATEMENT ADDENDUM
- COVERING LETTER
- PLANNING STATEMENT
- ILLUSTRATIVE MASTERPLAN
- PARAMETER PLAN - BUILDING HEIGHTS
- PARAMETER PLAN - LAND USE
- PARAMETER PLAN - MOVEMENT AND ACCESS
- 2025 ENVIRONMENTAL STATEMENT ADDENDUM VOLUME 1: NON-TECHNICAL SUMMARY
- 2025 ESA CHAPTER 1. INTRODUCTION
- 2025 ESA CHAPTER 4. THE PROPOSED DEVELOPMENT
- 2025 ESA FIGURE 4.1 LAND USE PARAMETER PLAN
- 2025 ESA FIGURE 4.2 BUILDING HEIGHTS PARAMETER PLAN
- 2025 ESA FIGURE 4.4 MOVEMENT AND ACCESS PARAMETER PLAN
- ENVIRONMENTAL STATEMENT ADDENDUM VOLUME 2: MAIN TEXT AND FIGURES
- ENVIRONMENTAL STATEMENT ADDENDUM VOLUME 3: APPENDICES
- LETTER FROM AVISON YOUNG
- MOTTRAM OLD ROAD WESTERN VILLAGE PUFFIN CROSSING GENERAL ARRANGEMEN
- STATEMENT OF COMMUNITY INVOLVEMENT
- RETAINED & REMOVED BUILDINGS
- INFRASTRUCTURE PHASING PLAN
- PARAMETER PLAN - GREEN INFRASTRUCTURE
- MINERAL ASSESSMENT REVIEW
- LOCATION PLAN
- OUTDOOR SPORTS FACILITIES NEEDS ASSESSMENT
- SUSTAINABILITY AND ENERGY STATEMENT
- CERTIFICATE C
- CERTIFICATE C - NEWSPAPER NOTICE EVIDENCE
- WESTERN VILLAGE ACCESS JUNCTION NO. 2 GENERAL ARRANGEMENT
- MOTTRAM OLD ROAD CORRIDOR IMPROVEMENTS
- EASTERN VILLAGE GHOST ISLAND JUNCTION 2 GENERAL ARRANGEMENT
- EASTERN VILLAGE GHOST ISLAND JUNCTION 1 GENERAL ARRANGEMENT
- WESTERN VILLAGE GHOST ISLAND JUNCTION GENERAL ARRANGEMENT
- 2025 ESA FIGURE 4.10 RETAINED AND REMOVED BUILDINGS PLAN
- 2025 ESA FIGURE 4.9 MOTTRAM OLD ROAD CORRIDOR IMPROVEMENTS
- 2025 ESA APPENDIX 4.8 EASTERN VILLAGE GHOST ISLAND JUNCTION 2 GENERAL ARRANGEM
- 2025 ESA FIGURE 4.7 EASTERN VILLAGE GHOST ISLAND JUNCTION 1 GENERAL ARRANGEMENT
- 2025 ESA FIGURE 4.6 WESTERN VILLAGE ACCESS JUNCTION 2 GENERAL ARRANGEMENT
- 2025 ESA FIGURE 4.5 WESTERN VILLAGE GHOST ISLAND JUNCTION GENERAL ARRANGEMENT
- 2025 ESA FIGURE 4.3 GREEN INFRASTRUCTURE PARAMETER PLAN
- 2025 ESA FIGURE 1.1 SITE LOCATION PLAN
- 2025 ENVIRONMENTAL STATEMENT ADDENDUM EIA SIGNPOSTING DOCUMENT
- 2025 ESA CHAPTER 20. SUMMARY AND CONCLUSIONS
- 2025 ESA CHAPTER 19. CUMULATIVE EFFECTS
- 2025 ESA CHAPTER 18. WASTE
- 2025 ESA CHAPTER 17. HUMAN HEALTH
- 2025 ESA CHAPTER 16. SOCIO-ECONOMICS
- 2025 ESA CHAPTER 15. LIGHTING
- 2025 ESA CHAPTER 14. NOISE
- 2025 ESA CHAPTER 13. AIR QUALITY
- 2025 ESA CHAPTER 12. TRANSPORT AND ACCESS
- 2025 ESA CHAPTER 10. GROUND CONDITIONS
- 2025 ESA CHAPTER 9. HISTORIC ENVIRONMENT
- 2025 ESA CHAPTER 8. ECOLOGY
- 2025 ESA CHAPTER 7. LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- 2025 ESA CHAPTER 6. PLANNING POLICY
- 2025 ESA CHAPTER 5. ALTERNATIVES
- 2025 ESA CHAPTER 3. SITE DESCRIPTION
- 2025 ESA CHAPTER 2. APPROACH
- 2025 ESA APPENDIX 15.8 LIGHTING MANAGEMENT PLAN (WORKS PHASE)
- 2025 ESA APPENDIX 15.2 LIGHTING MONITORING LOCATION PLAN
- 2025 ESA APPENDIX 15.1 SKY-BRIGHTNESS MAPPING
- 2025 ESA APPENDIX 13.3 AIR QUALITY ASSESSMENT INPUT DATA
- 2025 ESA APPENDIX 13.2 AIR QUALITY FIGURES
- 2025 ESA APPENDIX 11.3 DRAINAGE AND FLOOD RISK TECHNICAL NOTE
- 2025 ESA APPENDIX 10.10 2025 WFD SCREENING ASSESSMENT REPORT
- 2025 ESA APPENDIX 10.9 2025 CORRESPONDENCE WITH THE TMBC ENVIRONMENTAL HEALTH
- 2025 ESA APPENDIX 9.4 2025 GEOPHYSICAL SURVEY
- 2025 ESA APPENDIX 8.29 WATER VOLE AND OTTER SURVEY TECHNICAL REPORT
- 2025 ESA APPENDIX 8.28 WINTER BIRD HABITAT WALKOVER ASSESSMENT TECHNICAL NOTE
- 2025 ESA APPENDIX 8.27 BREEDING BIRD SURVEY TECHNICAL REPORT
- 2025 ESA APPENDIX 8.25 BAT SURVEY TECHNICAL REPORT
- 2025 ESA APPENDIX 8.24 AMPHIBIAN SURVEY TECHNICAL REPORT
- 2025 ESA APPENDIX 8.23 ANNEX A - BIODIVERSITY METRIC 3.1 CALCULATION TOOL
- 2025 ESA APPENDIX 8.23 BIODIVERSITY NET GAIN DESIGN STAGE ASSESSMENT
- 2025 ESA APPENDIX 8.22 ARBORICULTURAL IMPACT ASSESSMENT ADDENDUM REPORT
- 2025 ESA APPENDIX 8.22 - AIA ADDENDUM REPORT (DRAWING SET 3)
- 2025 ESA APPENDIX 8.22 - AIA ADDENDUM REPORT (DRAWING SET 2)
- 2025 ESA APPENDIX 8.22 - AIA ADDENDUM REPORT (DRAWING SET 1)
- 2025 ESA APPENDIX 8.21 HEDGEROW REGULATIONS ASSESSMENT TECHNICAL REPORT
- 2025 ESA APPENDIX 8.20 WOODLAND NVC SURVEY TECHNICAL REPORT
- 2025 ESA APPENDIX 8.19 UKHABITAT CLASSIFICATION SURVEY TECHNICAL REPORT
- 2025 ESA APPENDIX 8.18 ECOLOGICAL DESK STUDY
- 2025 ESA APPENDIX 8.17 2025 CORRESPONDENCE BETWEEN TEP AND GMEU
- 2023 ENVIRONMENTAL STATEMENT ADDENDUM VOLUMES 1AND 2
- 2023 ESA APPENDIX 12.3: TRANSPORT ASSESSMENT ADDENDUM
- 2023 ESA APPENDIX 10.8: GROUND GAS ADDENDUM REPORT ? WESTERN & CENTRAL SECTORS
- 2023 ESA APPENDIX 10.7: GROUND GAS ADDENDUM REPORT ? EASTERN SECTOR
- 2022 ENVIRONMENTAL STATEMENT ADDENDUM VOLUMES 1 AND 2
- 2022 ESA APPENDIX 12.3: TRANSPORT ASSESSMENT ADDENDUM
- 2022 ESA APPENDIX 10.6: WATER FRAMEWORK DIRECTIVE SCREENING ASSESSMENT
- 2022 ESA APPENDIX 10.5: PHASE II GEOENVIRONMENTAL SITE ASSESSMENT
- 2022 ESA APPENDIX 9.3: GEOPHYSICAL SURVEY REPORT
- 2022 ESA APPENDIX 8.14: WINTER BIRD SURVEY
- 2022 ESA APPENDIX 8.13: HATTERSLEY FOOTBRIDGE ARBORICULTURE IMPACT ASSESSMENT
- 2022 ESA APPENDIX 8.12: ARBORICULTURE IMPACT ASSESSMENT ADDENDUM
- 2022 ESA APPENDIX 8.8: BAT SURVEY (REPLACEMENT)
- 2022 ESA APPENDIX 8.6: AMPHIBIAN SURVEY (REPLACEMENT)
- 2022 ESA APPENDIX 8.4: ARBORICULTURE IMPACT ASSESSMENT (REPLACEMENT)
- 2022 ESA APPENDIX 8.5: HEDGEROW SURVEY (REPLACEMENT)
- 2022 ESA APPENDIX 8.2: PHASE 1 HABITAT SURVEY (REPLACEMENT)
- 2021 ES CHAPTER 18 WASTE
- 2021 ES CHAPTER 17 HUMAN HEALTH
- 2021 ES CHAPTER 16 SOCIOECONOMIC IMPACTS
- 2021 ES CHAPTER 15 LIGHTING
- 2021 ES CHAPTER 14 NOISE
- 2021 ES CHAPTER 12 TRANSPORT AND ACCESS
- 2021 ES CHAPTER 11 DRAINAGE AND FLOOD RISK
- 2021 ES CHAPTER 10 GROUND CONDITIONS
- 2021 ES CHAPTER 9 HISTORIC ENVIRONMENT
- 2021 ES CHAPTER 8 ECOLOGY
- 2021 ES CHAPTER 7 LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- 2021 ES CHAPTER 6 PLANNING POLICY CONTEXT
- 2021 ES CHAPTER 5 ALTERNATIVES
- 2021 ES CHAPTER 4 THE PROPOSED DEVELOPMENT
- 2021 ES CHAPTER 4 THE PROPOSED DEVELOPMENT
- 2021 ES CHAPTER 3 SITE DESCRIPTION
- 2021 ES CHAPTER 2 APPROACH
- 2021 ES APPENDIX 14.1: MEASURED BACKGROUND SOUND LEVELS
- 2021 ES APPENDIX 11.1: FLOOD RISK ASSESSMENT
- 2021 ES APPENDIX 10.4: MINERAL ASSESSMENT
- 2021 ES APPENDIX 10.3: ENVIRONMENT AGENCY CORRESPONDENCE
- 2021 ES APPENDIX 10.2 PHASE 2 ENVIRONMENTAL SITE ASSESSMENT (PART 7)
- 2021 ES APPENDIX 10.2 PHASE 2 ENVIRONMENTAL SITE ASSESSMENT (PART 6)
- 2021 ES APPENDIX 10.2 PHASE 2 ENVIRONMENTAL SITE ASSESSMENT (PART 5)
- 2021 ES APPENDIX 10.2 PHASE 2 ENVIRONMENTAL SITE ASSESSMENT (PART 4)
- 2021 ES APPENDIX 10.2 PHASE 2 ENVIRONMENTAL SITE ASSESSMENT (PART 3)
- 2021 ES APPENDIX 10.2 PHASE 2 ENVIRONMENTAL SITE ASSESSMENT (PART 2)
- 2021 ES APPENDIX 10.2 PHASE 2 ENVIRONMENTAL SITE ASSESSMENT (PART 1)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 39)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 38)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 37)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 36)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 35)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 34)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 33)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 32)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 31)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 30)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 29)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 28)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 27)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 26)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 25)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 24)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 23)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 22)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 21)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 20)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 19)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 18)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 17)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 16)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 15)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 14)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 13)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 12)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 11)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 10)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 9)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 8)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 8.1)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 7)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 6)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 5)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 4)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 3)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 2)
- 2021 ES APPENDIX 10.1 PHASE 1 DESK STUDY (PART 1)
- 2021 ES APPENDIX 9.2 HISTORIC ENVIRONMENT ASSESSMENT (PART 2)
- 2021 ES APPENDIX 9.2 HISTORIC ENVIRONMENT ASSESSMENT (PART 1)
- 2021 ES APPENDIX 9.1: ARCHAEOLOGICAL DESK BASED ASSESSMENT (PART 2)
- 2021 ES APPENDIX 9.1: ARCHAEOLOGICAL DESK BASED ASSESSMENT (PART 1)
- 2021 ES APPENDIX 8.10: WATER VOLE AND OTTER SURVEY
- 2021 ES APPENDIX 8.9: BREEDING BIRD SURVEY
- 2021 ES APPENDIX 8.3: WOODLAND NVC SURVEY
- 2021 ES APPENDIX 8.1: ECOLOGY DESK STUDY
- 2021 ES APPENDIX 7.3 LVIA FIGURES
- 2021 ES APPENDIX 2.2: EIA SCOPING OPINION
- 2021 ES APPENDIX 2.1: EIA SCOPING REPORT
- CONDITION 64 REFERENCE PLAN
- REFERRAL DEPT LEVELLING UP HOMES AND COMMUNITIES
- RESPONSE FROM DEPT LEVELLING UP HOMES AND COMMUNITIES
- APPLICANT RESPONSE TO SMBC HIGHWAYS POSITION
- COUNCIL OWNED LAND TO BE REFERENCED IN CONDITION NO.63
- THIRD PARTY OWNED LAND TO BE REFERENCED IN CONDITION NO.64
- CONSULTATION RESPONSE - EMPLOYMENT & SKILLS
- CONSULTEE COMMENT - CADENT GAS
- CONSULTATION RESPONSE - STOCKPORT COUNCIL
- CONSULTEE COMMENT - UNITED UTILITIES
- CONSULTATION RESPONSE - UU
- CONSULTATION RESPONSE - LHA
- LLFA
- TFGM COMMENTS
- GREATER MANCHESTER ECOLOGY UNIT
- CONSULTATION RESPONSE - ENVIRO AGENCY
- CONSULTATION RESPONSE - PUBLIC HEALTH
- CONSULTEE COMMENT - NATIONAL HIGHWAYS
- CONSULTEE COMMENT - MINERALS AND WASTE PLANNING UNIT
- CONSULTEE COMMENT - PEAK PARK
- CONSULTEE COMMENT - SALFORD CITY COUNCIL
- CONSULTATION RESPONSE - NATURAL ENGLAND
- CONSULTATION RESPONSE - TRAFFORD COUNCIL
- CONSULTATION RESPONSE - GMAAS
- CONSULTEE COMMENT - ENVIRONMENTAL HEALTH
- CONSULTEE COMMENT - WASTE SERVICES
- CONSULTEE COMMENT - TRANS PENNINE TRAIL
- CONSULTEE COMMENT - COAL AUTHORITY
- CONSULTEE COMMENT - HOUSING STRATEGY
- CONSULTEE COMMENT - AFFORDABLE HOUSING
- CONSULTATION RESPONSE - CONTAMINATED LAND
- CONSULTATION RESPONSE - TREES
- CONSULTEE COMMENT - HISTORIC ENGLAND
- CONSULTEE COMMENT - ACTIVE TRAVEL ENGLAND
- CONSULTATION RESPONSE - RAIL
- CONSULTATION RESPONSE - RAIL
- MOTTRAM OLD ROAD CORRIDOR IMPROVEMENTS
- MOTTRAM OLD ROAD WESTERN VILLAGE PUFFIN CROSSING GENERAL ARRANGEMENT.
- MOTTRAM OLD ROAD EASTERN VILLAGE PEGASUS CROSSING GENERAL ARRANGEMENT
- WESTERN VILLAGE EMERGENCY ACCESS JUNCTION GENERAL ARRANGEMENT
- EASTERN VILLAGE GHOST ISLAND JUNCTION 2 GENERAL ARRANGEMENT
- EASTERN VILLAGE GHOST ISLAND JUNCTION 1 GENERAL ARRANGEMENT
- WESTERN VILLAGE GHOST ISLAND JUNCTION GENERAL ARRANGEMENT
- SITE PHASING PLAN
- PARAMETER PLAN - DENSITY & HEIGHT
- PARAMETER PLAN - LAND USE
- ENVIRONMENTAL STATEMENT ADDENDUM
- ENVIRONMENTAL STATEMENT ADDENDUM - APPENDIX 11.1: FLOOD RISK ASSESSMENT AND DRAI
- ENVIRONMENTAL STATEMENT ADDENDUM - APPENDIX 11.1: FLOOD RISK ASSESSMENT AND DRAI
- ENVIRONMENTAL STATEMENT ADDENDUM - APPENDIX 11.1: FLOOD RISK ASSESSMENT AND DRAI
- ENVIRONMENTAL STATEMENT ADDENDUM - APPENDIX 11.1: FLOOD RISK ASSESSMENT AND DRAI
- ENVIRONMENTAL STATEMENT ADDENDUM - APPENDIX 11.1: FLOOD RISK ASSESSMENT AND DRAI
- ENVIRONMENTAL STATEMENT ADDENDUM - APPENDIX 11.1: FLOOD RISK ASSESSMENT AND DRAI
- ENVIRONMENTAL STATEMENT ADDENDUM - APPENDIX 8.16: BIODIVERSITY NET GAIN FEASIBIL
- ENVIRONMENTAL STATEMENT ADDENDUM - APPENDIX 10.7: GROUND GAS ADDENDUM REPORT ? E
- ENVIRONMENTAL STATEMENT ADDENDUM - APPENDIX 10.8: GROUND GAS ADDENDUM REPORT ? W
- ENVIRONMENTAL STATEMENT ADDENDUM - APPENDIX 12.3 TRANSPORT ASSESSMENT ADDENDUM
- COVERING LETTER
- DESIGN & ACCESS STATEMENT APPENDICES
- DESIGN & ACCESS STATEMENT
- PLANNING STATEMENT
- INDICATIVE PHASING STRATEGY
- CONSULTATION RESPONSE - CONTAMINATED LAND
- CONSULTATION RESPONSE - NATIONAL HIGHWAYS
- CONSULTEE COMMENT - NATIONAL HIGHWAYS
- CONSULTEE COMMENT - NATIONAL HIGHWAYS
- ECOLOGICAL TECHNICAL NOTE
- CONSULTEE COMMENT - MINERALS AND WASTE PLANNING UNIT
- CONSULTATION RESPONSE - NATIONAL HIGHWAYS
- CONSULTEE COMMENT - CADENT GAS
- CONSULTATION RESPONSE - CHESHIRE WILDLIFE TRUST
- CONSULTEE COMMENT - SALFORD CITY COUNCIL
- CONSULTEE COMMENT - EDUCATION
- CONSULTATION RESPONSE - STOCKPORT MBC
- CONSULTATION RESPONSE - GMEU
- CONSULTATION RESPONSE - GREENSPACE
- CONSULTATION RESPONSE - NATIONAL HIGHWAYS
- CONSULTATION RESPONSE - TRANS PENNINE TRAIL PARTNERSHIP
- CONSULTEE COMMENT - UNITED UTILITIES
- CONSULTEE COMMENT - NETWORK RAIL
- AMENDED - PARAMETER PLAN - MOVEMENT AND ACCESS
- AMENDED - SITE PHASING PLAN - PLANNING
- CONSULTATION RESPONSE - WIGAN COUNCIL
- CONSULTATION RESPONSE - NATURAL ENGLAND
- CONSULTATION RESPONSE - NATURAL ENGLAND ANNEX A
- CONSULTATION RESPONSE - GMAAS
- CONSULTATION RESPONSE - CONTAMINATED LAND
- CONSULTATION RESPONSE - FORESTRY COMMISSION STANDING ADVICE
- CONSULTATION RESPONSE - FORESTRY COMMISSION FURTHER COMMENTS
- CONSULTATION RESPONSE - TRANS PENNINE TRAIL PARTNERSHIP
- TOPOGRAPHICAL SURVEY 55416-1
- TOPOGRAPHICAL SURVEY 55416-2
- TOPOGRAPHICAL SURVEY 55416-3
- TOPOGRAPHICAL SURVEY 55416-4
- TOPOGRAPHICAL SURVEY 55416-5
- TOPOGRAPHICAL SURVEY 55416-6
- TOPOGRAPHICAL SURVEY 55416-7
- TOPOGRAPHICAL SURVEY 55416-8
- TOPOGRAPHICAL SURVEY 55416-9
- TOPOGRAPHICAL SURVEY 55416-10
- TOPOGRAPHICAL SURVEY 55416-11
- TOPOGRAPHICAL SURVEY 55416-12
- TOPOGRAPHICAL SURVEY 55416-13
- TOPOGRAPHICAL SURVEY 55416-14
- TOPOGRAPHICAL SURVEY 55416-15
- TOPOGRAPHICAL SURVEY 55416-16
- TOPOGRAPHICAL SURVEY 55416-17
- TOPOGRAPHICAL SURVEY 55416-18
- TOPOGRAPHICAL SURVEY 55416-19
- TOPOGRAPHICAL SURVEY 55416-20
- TOPOGRAPHICAL SURVEY 55416-21
- TOPOGRAPHICAL SURVEY 55416-22
- TOPOGRAPHICAL SURVEY 55416-23
- TOPOGRAPHICAL SURVEY 55416-24
- TOPOGRAPHICAL SURVEY 55416-25
- TOPOGRAPHICAL SURVEY 55416-26
- TOPOGRAPHICAL SURVEY 55416-27
- TOPOGRAPHICAL SURVEY 55416-28
- TOPOGRAPHICAL SURVEY 55416-29
- TOPOGRAPHICAL SURVEY 55416-30
- TOPOGRAPHICAL SURVEY 55416-31
- TOPOGRAPHICAL SURVEY 55416-32
- TOPOGRAPHICAL SURVEY 55416-33
- TOPOGRAPHICAL SURVEY 55416-34
- TOPOGRAPHICAL SURVEY 55416-35
- TOPOGRAPHICAL SURVEY 55416-36
- TOPOGRAPHICAL SURVEY 55416-37
- TOPOGRAPHICAL SURVEY 55416-38
- TOPOGRAPHICAL SURVEY 55416-39
- TOPOGRAPHICAL SURVEY 55416-40
- TOPOGRAPHICAL SURVEY 55416-41
- TOPOGRAPHICAL SURVEY 55416-42
- TOPOGRAPHICAL SURVEY 55416-43
- TOPOGRAPHICAL SURVEY 55416-44
- TOPOGRAPHICAL SURVEY 55416-45
- TOPOGRAPHICAL SURVEY 55416-46
- TOPOGRAPHICAL SURVEY 55416-47
- TOPOGRAPHICAL SURVEY 55416-48
- TOPOGRAPHICAL SURVEY 55416-49
- TOPOGRAPHICAL SURVEY 55416-50
- TOPOGRAPHICAL SURVEY 55416-51
- TOPOGRAPHICAL SURVEY 55416-52
- TOPOGRAPHICAL SURVEY 55416-53
- TOPOGRAPHICAL SURVEY 55416-54
- TOPOGRAPHICAL SURVEY 55416-55
- TOPOGRAPHICAL SURVEY 55416-56
- TOPOGRAPHICAL SURVEY 55416-57
- TOPOGRAPHICAL SURVEY 55416-58
- TOPOGRAPHICAL SURVEY 55416-59
- TOPOGRAPHICAL SURVEY 55416-60
- TOPOGRAPHICAL SURVEY 55416-61
- TOPOGRAPHICAL SURVEY 55416-62
- TOPOGRAPHICAL SURVEY 55416-63
- TOPOGRAPHICAL SURVEY 55416-64
- TOPOGRAPHICAL SURVEY 55416-65
- TOPOGRAPHICAL SURVEY 55416-66
- TOPOGRAPHICAL SURVEY 55416-67
- TOPOGRAPHICAL SURVEY 55416-68
- TOPOGRAPHICAL SURVEY 55416-69
- TOPOGRAPHICAL SURVEY 55416-70
- TOPOGRAPHICAL SURVEY 55416-71
- TOPOGRAPHICAL SURVEY 55416-72
- TOPOGRAPHICAL SURVEY 55416-73
- TOPOGRAPHICAL SURVEY 55416-74
- CONSULTATION RESPONSE - SUSTRANS
- CONSULTATION RESPONSE - GMP
- CONSULTATION RESPONSE - PUBLIC HEALTH
- CONSULTATION RESPONSE - ENVIRO AGENCY
- CONSULTATION RESPONSE - ROCHDALE COUNCIL
- CONSULTATION RESPONSE - TREES
- CONSULTEE COMMENT - COAL AUTHORITY
- CONSULTEE COMMENT - HISTORIC ENGLAND
- CONSULTATION RESPONSE - HOUSING GROWTH
- CONSULTATION RESPONSE - HOUSING STRATEGY
- CONSULTEE COMMENT - TRAFFORD COUNCIL
- CONSULTEE COMMENT - HIGH PEAK
- AMENDED LAND SAFEGUARDING PLAN MOTTRAM OLD ROAD
- AMENDED SITE LOCATION PLAN
- AMENDED PARAMETER PLAN - GREEN INFRASTRUCTURE
- AMENDED BUILDINGS RETAINED/ REMOVED
- AMENDED ILLUSTRATIVE FRAMEWORK MASTERPLAN
- ENVIRONMENTAL STATEMENT VOLUME 1 & 2 ADDENDUM TO ORIGINAL CHAPTERS
- AMENDED S APPENDIX 7.5 TVIA TECHNICAL NOTE
- AMENDED ES APPENDIX 8.2 PHASE 1 HABITAT SURVEY
- AMENDED ES APPENDIX 8.4 ARBORICULTURE IMPACT ASSESSMENT
- AMENDED ES APPENDIX 8.5 HEDGEROW SURVEY
- AMENDED ES APPENDIX 8.6 AMPHIBIAN SURVEY
- AMENDED ES APPENDIX 8.13 HATTERSLEY FOOTBRIDGE ARBORICULTURE IMPACT ASSESSMENT
- AMENDED ES APPENDIX 8.12 ARBORICULTURE IMPACT ASSESSMENT ADDENDUM
- AMENDED S APPENDIX 8.11 PHASE 1 HABITAT SURVEY - LAND SOUTH OF MOTTRAM OLD ROAD
- AMENDED ES APPENDIX 8.8 BAT SURVEY
- AMENDED ES APPENDIX 8.14 WINTER BIRD SURVEY
- AMENDED ES APPENDIX 9.3 GEOPHYSICAL SURVEY
- AMENDED ES APPENDIX 8.16A BIODIVERSITY METRIC
- AMENDED ES APPENDIX 8.16 BIODIVERSITY NET GAIN FEASIBILITY REPORT
- AMENDED ES APPENDIX 8.15 BREEDING BIRD SURVEY - LAND SOUTH OF MOTTRAM OLD ROAD
- AMENDED ES APPENDIX 12.3 TRANSPORT ASSESSMENT
- AMENDED ES APPENDIX 10.6 WFD SCREENING ASSESSMENT
- AMENDED ES APPENDIX 10.5 PHASE II GEOENVIRONMENTAL ASSESSMENT.
- LONG-TERM STEWARDSHIP TECHNICAL BRIEFING NOTE
- DESIGN & ACCESS STATEMENT APPENDICES
- DESIGN & ACCESS STATEMENT APPENDICES
- DESIGN & ACCESS STATEMENT
- PLANNING STATEMENT
- COVERING LETTER
- GGGV INDICATIVE PHASING STRATEGY
- TRANS PENNINE TRAIL - BRIEFING NOTE
- AMENDED ES APPENDIX 11.2 DRAINAGE STRATEGY ADDENDUM
- CONSULTEE COMMENT - NATIONAL HIGHWAYS
- CONSULTEE COMMENT - NATIONAL HIGHWAYS
- FRA ? APPENDIX A
- FRA ? APPENDIX A
- FRA ? APPENDIX B
- FRA ? APPENDIX C
- FRA ? APPENDIX C
- FRA ? APPENDIX C
- FRA ? APPENDIX D
- FRA ? APPENDIX D
- FRA ? APPENDIX D
- FRA ? APPENDIX E
- FRA ? APPENDIX E
- CONSULTEE COMMENT - NATIONAL HIGHWAYS
- CONSULTEE COMMENT - FORESTRY COMMISSION ENGLAND
- CONSULTATION RESPONSE - FORESTRY COMMISSION
- CONSULTATION RESPONSE -NATIONAL HIGHWAYS
- CONSTRAINTS PLAN
- CONSULTEE COMMENT - SPORTS ENGLAND
- EXISTING CATCHMENT WATERCOURSE NETWORK AND CUMULATIVE FLOWS
- EXISTING CATCHMENT PLAN
- GREENFIELD RUNOFF ESTIMATE
- PROPOSED CATCHMENT PLAN 1 OF 2
- PROPOSED CATCHMENT PLAN 2 OF 2
- PROPOSED CATCHMENT 019 OVERVIEW PLAN
- PROPOSED FOUL WATER CATCHMENT PLAN 1 OF 2
- PROPOSED FOUL WATER CATCHMENT PLAN 2 OF 2
- PROPOSED FOUL WATER PHASE 1 OPTION
- SEWER RECORD SHEET
- SAFEDIG EXTRACT
- NEIGHBOUR NOTIFICATION AREAS
- GODLEY GREEN - ENVIRONMENTAL STATEMENT LETTER
- REGULATION 3 FORM
- LETTER - UPDATED DRAWING PACK
- COVER LETTER UPDATED DRAWINGS
- PLANS COVER LETTER
- LEISURE COMPLEX CAR PARK ACCESS
- COVER LETTER
- GREEN MINERAL ASSESSMENT
- ES APPENDIX 8.9 BREEDING BIRD SURVEY.PDF
- ES APPENDIX 8.4 ARBORICULTURAL IMPACT ASSESSMENT_PART2.PDF
- ES APPENDIX 8.4 ARBORICULTURAL IMPACT ASSESSMENT_PART1.PDF
- ES APPENDIX 8.3 WOODLAND NVC SURVEY.PDF
- ES APPENDIX 8.10 WATER VOLE AND OTTER SURVEY REPORT (1).PDF
- ECOLOGY DESK STUDY.PDF
- ES APPENDIX 7.4 LVIA VIEWS AND PHOTOMONTAGES_PART2.PDF
- ES APPENDIX 7.4 LVIA VIEWS AND PHOTOMONTAGES_PART1.PDF
- ES APPENDIX 7.3 LVIA FIGURES.PDF
- ES APPENDIX 7.2 VISUAL ASSESSMENT TABLES.PDF
- ES APPENDIX 7.1 LANDSCAPE ASSESSMENT TABLES.PDF
- EIA SCOPING REPORT.PDF
- ES APPENDIX 2.2 EIA SCOPING OPINION.PDF
- ENVIRONMENTAL STATEMENT CONTENTS
- APPLICATION FORM - WITHOUT PERSONAL DATA
- ES APPENDIX 9.2 HISTORIC ENVIRONMENT ASSESSMENT_PART2.PDF
- ES APPENDIX 9.2 HISTORIC ENVIRONMENT ASSESSMENT_PART1.PDF
- ES APPENDIX 9.1 ARCHAEOLOGICAL DBA_PART2.PDF
- ES APPENDIX 9.1 ARCHAEOLOGICAL DBA_PART1.PDF
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED_PART9.PDF
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED_PART8.PDF
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED_PART8(1).PDF
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED_PART7.PDF
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED_PART6.PDF
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED_PART5.PDF
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED_PART4.PDF
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED_PART39.PDF
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED_PART38.PDF
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED_PART37.PDF
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED_PART36.PDF
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED_PART35.PDF
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 34
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 33
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 32
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 31
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 30
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 3
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 29
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 28
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 27
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 26
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 25(1)
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 24
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 23
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 22
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 21
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 20
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 2
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 19
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 18
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 17
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 16
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 15
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 14
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 13
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 12
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 11
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 10
- ES APPENDIX 10.1 PHASE I DESK STUDY REDUCED PART 1
- ES APPENDIX 12.1 TRANSPORT ASSESSMENT REDUCED_PART2.PDF
- ES APPENDIX 12.1 TRANSPORT ASSESSMENT REDUCED_PART1.PDF
- ES APPENDIX 12.1 TRANSPORT ASSESSMENT (APPENDICES)_PART3.PDF
- ES APPENDIX 12.1 TRANSPORT ASSESSMENT (APPENDICES)_PART2.PDF
- ES APPENDIX 12.1 TRANSPORT ASSESSMENT (APPENDICES)_PART1.PDF
- ES APPENDIX 11.1 FLOOD RISK ASSESSMENT (1).PDF
- ES APPENDIX 10.4 MINERAL ASSESSMENT (1).PDF
- ES APPENDIX 10.3 ENVIRONMENT AGENCY CORRESPONDENCE (1).PDF
- ES APPENDIX 10.2 PHASE II GSA REDUCED_PART7.PDF
- ES APPENDIX 10.2 PHASE II GSA REDUCED_PART6.PDF
- ES APPENDIX 10.2 PHASE IIGSA REDUCED_PART5.PDF
- ES APPENDIX 10.2 PHASE II GSA REDUCED_PART4.PDF
- ES APPENDIX 10.2 PHASE IIGSA REDUCED_PART3.PDF
- ES APPENDIX 10.2 PHASE II GSA REDUCED_PART2.PDF
- ES APPENDIX 10.2 PHASE II GSA REDUCED_PART1.PDF
- ES APPENDIX 17.1 GREENKEEPER ASESSMENT.PDF
- ES APPENDIX 15.8 LIGHTING MANAGEMENT PLAN.PDF
- ES APPENDIX 15.7 LIGHTING MODEL IMAGERY.PDF
- ES APPENDIX 15.6 LIGHT SPILL.PDF
- ES APPENDIX 15.5 ASSESSED SCHEME OF LIGHTING.PDF
- ES APPENDIX 15.4 ECOLOGICAL RECEPTOR LOCATION PLAN.PDF
- ES APPENDIX 15.3 RESIDENTIAL RECEPTOR LOCATION PLAN.PDF
- ES APPENDIX 15.2 LIGHT MONITORING LOCATION PLAN.PDF
- ES APPENDIX 15.1 SKY-BRIGHTNESS MAPPING.PDF
- ES APPENDIX 14.1 MEASURED BACKGROUND SOUND LEVELS.PDF
- ES APPENDIX 13.1 AIR QUALITY ASSESSMENT INPUT DATA.PDF
- ES APPENDIX 12.2 TRAVEL PLAN.PDF
- ES CHAPTER 9 HISTORIC ENVIRONMENT
- ES CHAPTER 8 ECOLOGY
- ES CHAPTER 7 LANDSCAPE AND VISUAL
- ES CHAPTER 6 PLANNING POLICY
- ES CHAPTER 5 ALTERNATIVES
- ES CHAPTER 4 THE PROPOSED DEVELOPMENT
- ES CHAPTER 3 SITE DESCRIPTION
- ES CHAPTER 20 SUMMARY AND CONCLUSIONS
- ES CHAPTER 2 APPROACH
- ES CHAPTER 19 CUMULATIVE EFFECTS
- ES CHAPTER 18 WASTE
- ES CHAPTER 17 HEALTH
- ES CHAPTER 16 SOCIOECONOMICS
- ES CHAPTER 15 LIGHTING
- ES CHAPTER 14 NOISE
- ES CHAPTER 13 AIR QUALITY
- ES CHAPTER 12 TRANSPORT
- ES CHAPTER 11 DRAINAGE AND FLOOD RISK
- ES CHAPTER 10 GROUND CONDITIONS
- ES CHAPTER 1 INTRODUCTION
- GODLEY GREEN ENERGY STATEMENT
- SUSTAINABILITY STATEMENT
- SEQUENTIAL ASSESSMENT
- STATEMENT OF COMMUNITY FINAL FINAL
- GODLEY GREEN SCHEDULE OF OWNERS & OCCUPIERS
- SPORTS FACILITIES GUIDANCE REPORT FINAL
- ES VOLUME 1 NON-TECHNICAL SUMMARY.PDF
- NEWSPAPER ARTICLE
- TMBC SUPPORTING STATEMENT
- GODLEY-GREEN-DAS-APPENDICES - APP 3 - PROTECTING RESIDENTS AMENITY - COMP.PDF
- GODLEY-GREEN-DAS-APPENDICES - APP 2 - GARDEN VILLAGE STUDIES.PDF
- GODLEY-GREEN-DAS-APPENDICES - APP 1 - LOCAL TOWNSCAPE STUDIES.PDF
- GODLEY-GREEN-DAS - CHAPTER 9 - A SUSTAINABLE VILLAGE.PDF
- GODLEY-GREEN-DAS - CHAPTER 8 - NEIGHBOURHOOD DESIGN CODE.PDF
- GODLEY-GREEN-DAS - CHAPTER 7 - STRATEGIC DESIGN CODE - PART 2.PDF
- GODLEY-GREEN-DAS - CHAPTER 7 - STRATEGIC DESIGN CODE - PART 1.PDF
- GODLEY-GREEN-DAS - CHAPTER 6 - MASTERPLAN EVOLUTION.PDF
- GODLEY-GREEN-DAS - CHAPTER 4-5 - GARDEN VILLAGE VISION AND INFLUENCES.PDF
- GODLEY-GREEN-DAS - CHAPTER 3 - SITE CONSIDERATIONS.PDF
- GODLEY-GREEN-DAS - CHAPTER 10 - SUMMARY.PDF
- GODLEY-GREEN-DAS - CHAPTER 1-2 - INTRO AND CONTEXT.PDF
- COVER LETTER
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What this grant of permission means
Tameside granted permission on 31 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Greenfield Green Lane Hyde Tameside SK14 3BD
Single storey rear extension, dormer roof extension, outdoor swimming pool and outbuilding, erection of a car port, and first floor balcony to the rear and south elevation of property.
Small domestic -
Land Off Mottram Old Road Hyde SK14 3BE
87% historically approved · decision due ~25 Sep
Consultation from Tameside BC in relation to - Outline application with all matters reserved other than access for the erection of a new residential-led, mixed-use development comprising residential dwellings (up to 2,150), local centres (including up to 1,300 sqm of retail, 1,600 sqm of commercial uses and 1,000 sqm of local community uses), secondary school accommodation, sports facilities, new vehicle, cycle and pedestrian connections, new bridge connection to Hattersley, construction of new site accesses from Mottram Old Road, landscaping, demolition of farm/agricultural buildings and stables, and associated works
Awaiting decision Outline Demolition 2 docs -
Land Off Mottram Old Road Hyde SK14 3BE
Outline application with all matters reserved other than access for the erection of a new residential-led, mixed-use development comprising residential dwellings (up to 2,150), local centres (including up to 1,300 sqm of retail, 1,600 sqm of commercial uses and 1,000 sqm of local community uses), a primary school, sports facilities, new vehicle, cycle and pedestrian connections, new bridge connection to Hattersley, construction of new site accesses from Mottram Old Road, landscaping and associated works and demolition of farm/agricultural buildings and stables
Granted Outline Demolition 11 docs -
Land Off Mottram Old Road Hyde SK14 3BE
100% historically approved · decision due ~25 Jun
Discharge of Condition 20 (Remediation Strategy), Condition 23 (LEMP), Condition 24 (Tree Retention and Protection Plan), Condition 26 (Preliminary Ecological Appraisal) and Condition 40 (Gas Main) of planning reference 21/01171/OUT
Awaiting decision Conditions Trees 23 docs -
Land Off Mottram Old Road Hyde SK14 3BE
100% historically approved · decision due ~7 Oct
Full discharge of Condition 7 (Site Wide Design Code) of planning reference 21/01171/OUT
-
Land Off Mottram Old Road Hyde SK14 3BE
Outline application with all matters reserved other than access for the erection of a new residential-led, mixed-use development comprising residential dwellings (up to 2,150), local centres (including up to 1,300 sqm of retail, 1,600 sqm of commercial uses and 1,000 sqm of local community uses), secondary school accommodation, sports facilities, new vehicle, cycle and pedestrian connections, new bridge connection to Hattersley, construction of new site accesses from Mottram Old Road, landscaping, demolition of arm/agricultural buildings and stables, and associated works.
Decided Demolition
Other outline applications
In Tameside
-
26/00786/CPUD Awaiting decision
Laurus Ryecroft High School Lumb Lane Droylsden Tameside M43 7LJ
Single storey classroom building
-
26/00770/CPUD Awaiting decision
63 Holly Street Droylsden Tameside M43 6WL
Change of use from dwellinghouse (Use Class C3) to a children's home for one young person aged 7-17, with two carers providing 24-hour care on a rota basis (Use Class C2)
-
26/00760/CPUD Awaiting decision
22 Cook Street Audenshaw Tameside M34 5DB
Lawful Development Certificate for proposed use: Garage to living space conversion, window to replace garage door with new rooflight
-
26/00700/CPUD Granted
25 Blue Bell Close Hyde Tameside SK14 4HU
Proposed Single Storey Rear Extension and Rear Dormer Loft Conversion
-
26/00401/CPUD Refused
63 Holly Street Droylsden Tameside M43 6WL
Application for a Lawful Development Certificate for a change of use of a 4-bedroom dwelling house (Class C3) to a children's home for up to two children in a home-like environment, with up to two carers during the day and during the night working on a rota basis (Use Class C2).