Planning application
61 Stockport Road Ashton-Under-Lyne Tameside OL7 0LF
Works: New dwelling Extension Demolition Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of building from storage and distribution (Use Class B8) to 43no. apartments (Use Class C3), including infill roof extension, external alterations, and car parking, following partial demolition
As published by the council, reference 21/01143/FUL
Application record
- Reference
- 21/01143/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approve
- Received
- 23 Sep 2021
- Validated
- 16 Dec 2021
- Decided
- 27 Jan 2023
- Ward
- Ashton-under-Lyne St Peters
- Parish
- Ashton-under-Lyne
- Decision by
- Committee (Speakers Panel) Decision
- Postcode
- OL7 0LF
Timeline
Dates from the published record
-
23 Sep 2021
Received by Tameside
-
16 Dec 2021
Validated
Checked as complete and ready for consideration.
-
27 Jan 2023
Decision issued: Approve
-
24 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
39 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
63 Stockport Road Ashton-under-lyne Tameside OL7 0LF
Discharge of conditions 3 (materials), 4 (window details), 14 (air quality), 16 (affordable housing) of planning application 25/00156/FUL.
Granted Conditions Windows or glazing 10 docs -
Stores 63 Stockport Road Ashton-under-lyne Tameside OL7 0LF
Discharge of condition 3 (materials), 4 (window details) and 14 (air quality) of planning permission 21/01143/FUL.
Granted Conditions Windows or glazing 8 docs -
Cambridge Inn 74 Cambridge Street Ashton-Under-Lyne Tameside OL7 0EZ
Change of use from Public House into 4no. self contained flats, including construction of new windows and doors.
Granted Full applications New dwelling Windows or glazing 7 docs -
Cambridge Inn 74 Cambridge Street Ashton-Under-Lyne Tameside OL7 0EZ
Rear external stairs leading to first floor flats and other external alterations
Granted Full applications New dwelling 5 docs -
Cadent Gas Operational Compound Located Off Hertford Street Ashton-under-lyne Tameside
Application for prior approval of proposed demolition of three existing structures located on Cadent's operational site which are greater than 50m3 and all flat roof construction: 1. Transmission Governor House - 168m3 - constructed brick and breeze block with a concrete floor, previously used to house pipework which is now redundant. 2. District Governor House - 285m3 - constructed brick and breeze block with a concrete floor, previously used to house pipework which is now redundant. 3. Boiler House - 65m3 - walls and roof constructed of aluminum cladding with steel base frame and concrete below. Also used to house pipework which is now redundant.
Granted Other Demolition 9 docs -
Former Gasworks Grosvenor Street Ashton-Under-Lyne Greater Manchester Tameside OL7 0RE
Application for prior approval of proposed demolition of two former gasholders and associated infrastructure within the site; a small toilet block, a telemetry kiosk and a mast (circa 5m in height). Please refer to the Supporting Statement for further details.
Granted Other Demolition 5 docs
Other full applications applications
In Tameside
-
26/00695/FUL Awaiting decision
74 Thompson Road Denton Tameside M34 2PN
Single storey detached outbuilding
-
26/00693/FUL Awaiting decision
La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP
Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger
-
26/00692/FUL Awaiting decision
9 Cook Street Audenshaw Tameside M34 5DB
Single storey rear and side extension
-
26/00686/FUL Awaiting decision
10 Ostlers Gate Droylsden Tameside M43 7EU
Removal of existing conservatory and construction of new single storey rear extension
-
26/00684/FUL Awaiting decision
6 Warwick Grove Audenshaw Tameside M34 5QT
Proposed double storey side extension