Skip to content
PlanIndex Get alerts
Menu

Planning application

44 Stamford Street Mossley Tameside OL5 0HT

Granted Tameside 21/00769/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use from office at 44 Stamford Street, Mossley to dwelling house, whilst separating the property from 1 Anthony Street

As published by the council, reference 21/00769/FUL

Application record

Reference
21/00769/FUL
Type
Full Planning Permission
Status
Decided
Decision
Approve
Received
18 Jun 2021
Validated
18 Jun 2021
Decided
13 Aug 2021
Ward
Mossley
Parish
Ashton-under-Lyne
Decision by
Delegated Decision
Postcode
OL5 0HT

Timeline

Dates from the published record

  1. 18 Jun 2021

    Received by Tameside

  2. 13 Aug 2021

    Decision issued: Approve

  3. 7 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Oldham

214 applications on PlanIndex · across 11 councils · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 45 Stamford Street Mossley Tameside OL5 0LN

    26/00566/CPUD Submitted 9 Jul 2026 93m away

    91% historically approved · decision due ~3 Sep

    Certificate of proposed lawful development for a rear elevation dormer and 1no. skylight to front elevation.

    Awaiting decision Loft or dormer 8 docs
  • Sovereign Hall Farm Stamford Street Mossley Tameside OL5 0JZ

    21/00493/FUL Submitted 9 Apr 2021 104m away

    Conversion of barn / storage building into a single dwelling house including associated external alterations

    Withdrawn Full applications 7 docs
    Domestic
  • Chellow Dene House Waterton Lane Mossley Tameside OL5 0LU

    23/00005/TPO Submitted 18 Jan 2023 110m away

    G2 Sycamores x2 as per plan - Fell

    Granted Trees 2 docs
  • Co-Op 23 Arundel Street Mossley Tameside OL5 0LS

    22/01213/P3N Submitted 14 Dec 2022 122m away

    Application to determine if prior approval is required for a proposed: Collection Facility within the Curtilage of a Shop: Installation of InPost Parcel Locker

    Granted Full applications 9 docs
  • Wellswood The Elms Mossley Tameside OL5 0EJ

    23/00041/FUL Submitted 16 Jan 2023 141m away

    Single storey side extension, first floor rear extension, retaining wall to front of property and loft conversion.

    Granted Full applications Extension Loft or dormer 7 docs
    Small domestic
  • 25 Stamford Street Mossley Tameside OL5 0LL

    26/00559/FUL Submitted 8 Jul 2026 181m away

    91% historically approved · decision due ~8 Sep

    Subdivision of the property into retail unit at ground floor and basement level (Use Class E) and two-bed apartment at first floor (Use Class C3). Other external alterations including new first floor window to front elevation and external rear staircase to accommodation to the first floor

    Awaiting decision Full applications Windows or glazing 16 docs

In Tameside

  • 26/00695/FUL Awaiting decision

    74 Thompson Road Denton Tameside M34 2PN

    Single storey detached outbuilding

    2 Sep 2026 Full applications
  • 26/00693/FUL Awaiting decision

    La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP

    Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger

    1 Sep 2026 Full applications
  • 26/00692/FUL Awaiting decision

    9 Cook Street Audenshaw Tameside M34 5DB

    Single storey rear and side extension

    28 Aug 2026 Full applications
  • 26/00686/FUL Awaiting decision

    10 Ostlers Gate Droylsden Tameside M43 7EU

    Removal of existing conservatory and construction of new single storey rear extension

    27 Aug 2026 Full applications
  • 26/00684/FUL Awaiting decision

    6 Warwick Grove Audenshaw Tameside M34 5QT

    Proposed double storey side extension

    26 Aug 2026 Full applications