Planning application

Godley Hall Inn Godley Hill Hyde Tameside SK14 3BL

Granted Tameside 21/00624/LBC Listed Building Consent

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

The replacement of the existing rafters and ridge beams to the main roof and replacement of existing stone slates; general repair and replacement of gutters and rainwater pipes in a like for like manner; removal of all first floor ceilings to expose original roof timbers; the dismantling of the damaged front wall to the porch and its reconstruction in a like for like manner with the introduction of a lintel over the main entrance; and the removal of satellite dishes, signage and a retractable canopy

As published by the council, reference 21/00624/LBC

Application record

Reference
21/00624/LBC
Type
Listed Building Consent
Status
Decided
Decision
Approve
Received
7 May 2021
Validated
7 May 2021
Decided
2 Jul 2021
Ward
Hyde Godley
Parish
Hyde
Decision by
Delegated Decision
Postcode
SK14 3BL

Timeline

Dates from the published record

  1. 7 May 2021

    Received by Tameside

  2. 2 Jul 2021

    Decision issued: Approve

  3. 24 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Stockport

25 applications on PlanIndex · across 8 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Tameside granted permission on 2 July 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Tameside

  • 26/00658/LBC Awaiting decision

    Boundary Walls To Woodend Mill Dark Lane Mossley Tameside OL5 9AT

    Listed Building Consent: Boundary walls located within the curtilage of Woodend Mill, taken down to footings to install / improve pipework below ground. The walls will be rebuilt using the existing stones, damaged stones replaced with reclaimed stone where required so not to alter the appearance of the walls.

    12 Aug 2026 Heritage and listed buildings
  • 26/00651/LBC Awaiting decision

    Cavendish Mill Cavendish Street Ashton-under-lyne Tameside OL6 7DN

    Installation of fibre optic ethernet connection to the Basement level Cabinet Room

    11 Aug 2026 Heritage and listed buildings
  • 26/00653/LBC Awaiting decision

    Mottram Old Hall Old Hall Lane Mottram Tameside SK14 6LT

    Change of use of ancillary residential accommodation (Coach House) to form private dwelling. Erection of a dormer and other external and internal alterations

    11 Aug 2026 Heritage and listed buildings
  • 26/00587/LBC Awaiting decision

    Gibson Terrace Oxford Street East Ashton-under-lyne Tameside OL7 0ND

    Proposed repairs to roof, roof lights and chimney stack of Listed Building - Retrospective

    15 Jul 2026 Heritage and listed buildings
  • 26/00577/LBC Awaiting decision

    Astley Cheetham Art Gallery 3 Trinity Street Stalybridge Tameside SK15 2BN

    Relocate an Accessible WC to install a new platform lift from Basement level to First Floor, stopping at Ground Floor in addition. Redecoration and refurbishment of library and art gallery areas, new wall, floor and ceiling finishes. Additional rooms created within the basement with new servicing and ventilation. Refurbishment of existing external windows.

    13 Jul 2026 Heritage and listed buildings