Planning application
29 Tree House Avenue Ashton-Under-Lyne Tameside OL7 9PA
Works: Extension Loft or dormer Demolition Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
To vary condition 2 (specifying approved plans), to allow for minor material amendments (introduction of double dormer and minor changes to openings in side elevation), of planning permission ref. 20/00225/FUL - Demolition of existing side and rear extensions and chimney stack and construction of new single storey side extension and rear extensions. New external steps to front and side of property and new retaining wall to west facing boundary. External alterations including render to all elevations, addition/alteration of windows to front and side elevations, roof light to side elevation and formation of driveway to front/side of property (Resubmission of 19/00642/FUL)
As published by the council, reference 21/00495/FUL
Application record
- Reference
- 21/00495/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approve
- Received
- 9 Apr 2021
- Validated
- 9 Apr 2021
- Decided
- 4 Jun 2021
- Ward
- Ashton-Under-Lyne Waterloo
- Parish
- Ashton-under-Lyne
- Decision by
- Delegated Decision
- Postcode
- OL7 9PA
Timeline
Dates from the published record
-
9 Apr 2021
Received by Tameside
-
4 Jun 2021
Decision issued: Approve
-
24 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Altrincham
6 applications on PlanIndex · across 2 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
4 Harmol Grove Ashton-Under-Lyne Tameside OL7 9NW
PROPOSED SINGLE STOREY SIDE & REAR EXTENSION
Granted Full applications Extension 4 docsSmall domestic -
30 Harmol Grove Ashton-under-lyne Tameside OL7 9NW
91% historically approved · decision due ~17 Aug
Conversion of existing side garage and the construction of a first floor side extension above existing ground floor.
Awaiting decision Full applications Extension 9 docs -
58 Ney Street Ashton-under-lyne Tameside OL7 9NL
98% historically approved · decision due ~22 Oct
Tree Works
Awaiting decision Trees 4 docs -
28 Anglesey Road Ashton-Under-Lyne Tameside OL7 9NH
Single storey rear extension. The length of the extension from the rear of the original house 3.85m. Maximum height of the extension 3.26m. Maximum height of eaves 2.69m
Granted Prior approval Extension 4 docsSmall domestic -
Waterloo Tavern 490 - 492 Oldham Road Ashton-under-lyne Tameside OL7 9QH
91% historically approved · decision due ~28 Aug
1 no. Internally illuminated digital billboard signage
Awaiting decision Advertising 6 docs -
345 Oldham Road Ashton-under-lyne Tameside OL7 9NE
91% historically approved · decision due ~29 Oct
Full discharge of Condition 3 (Storage and Collection of Refuse) of planning reference 26/00088/FUL
Awaiting decision 2 docs
Other full applications applications
In Tameside
-
26/00695/FUL Awaiting decision
74 Thompson Road Denton Tameside M34 2PN
Single storey detached outbuilding
-
26/00693/FUL Awaiting decision
La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP
Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger
-
26/00692/FUL Awaiting decision
9 Cook Street Audenshaw Tameside M34 5DB
Single storey rear and side extension
-
26/00686/FUL Awaiting decision
10 Ostlers Gate Droylsden Tameside M43 7EU
Removal of existing conservatory and construction of new single storey rear extension
-
26/00684/FUL Awaiting decision
6 Warwick Grove Audenshaw Tameside M34 5QT
Proposed double storey side extension