Skip to content
PlanIndex Get alerts
Menu

Planning application

Mottram Church Of England Primary School Warhill Mottram Tameside SK14 6JL

Granted Tameside 21/00413/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replace the existing deteriorating stone slate tiling and fixing to roof, as well as the battens, felt and insulation, with new, including new lighter weight reproduction stone slates to match, to help stop the current roof spread and subsequent cracking to the walls due to the weight of the existing slates.

As published by the council, reference 21/00413/FUL

Application record

Reference
21/00413/FUL
Type
Full Planning Permission
Status
Decided
Decision
Approve
Received
25 Mar 2021
Validated
25 Mar 2021
Decided
9 Jul 2021
Ward
Longdendale
Parish
Longdendale
Decision by
Delegated Decision
Postcode
SK14 6JL

Timeline

Dates from the published record

  1. 25 Mar 2021

    Received by Tameside

  2. 9 Jul 2021

    Decision issued: Approve

  3. 24 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

8 applications on PlanIndex · across 6 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Warhill Farm Warhill Mottram Tameside SK14 6JL

    21/00335/FUL Submitted 11 Mar 2021 96m away

    Partial demolition and remodelling of disused fromer agricultural buildings/shippons and change of use to 1 dwelling (C3)

    Withdrawn Full applications Demolition 3 docs
    Domestic
  • 18 Church Brow Mottram Tameside SK14 6JJ

    26/00290/FUL Submitted 7 Apr 2026 135m away

    Replacement front door

    Granted Full applications 10 docs
  • Apartment 1 Parkview Broadbottom Road Mottram Tameside SK14 6JB

    26/00059/TPO Submitted 7 Aug 2026 210m away

    98% historically approved · decision due ~2 Oct

    Horse Chestnut - Crown reduce by 2-3m Approved.

    Decided Trees 3 docs
  • 4 Broadbottom Road Mottram Tameside SK14 6JB

    23/00047/FUL Submitted 17 Jan 2023 222m away

    Installation of 3no. rooflights, replacement of 1no. window and removal of 1no. window with enlarged structural opening to accommodate installation of sliding folding doors to rear elevation.

    Granted Full applications Loft or dormer Windows or glazing 11 docs
  • 2 Mottram Fold Mottram Tameside SK14 6PU

    16/00003/TCA Submitted 14 Dec 2016 242m away

    G1 Leylandii - Reduce height by 3m, T1 Birch - Reduce crown by 3m, T2 - Remove branch over neighbouring property.

    Granted Trees 2 docs
  • White Hart Inn 91 Market Street Mottram Tameside SK14 6JQ

    25/00759/MATCH Submitted 12 Sep 2025 251m away

    91% historically approved · decision due ~7 Nov

    Non-material amendment to planning application 23/00774/FUL. Amendment to the design of the dormer windows located on the rear main roof

    Awaiting decision Amendments Loft or dormer Windows or glazing 2 docs

In Tameside

  • 26/00695/FUL Awaiting decision

    74 Thompson Road Denton Tameside M34 2PN

    Single storey detached outbuilding

    2 Sep 2026 Full applications
  • 26/00693/FUL Awaiting decision

    La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP

    Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger

    1 Sep 2026 Full applications
  • 26/00692/FUL Awaiting decision

    9 Cook Street Audenshaw Tameside M34 5DB

    Single storey rear and side extension

    28 Aug 2026 Full applications
  • 26/00686/FUL Awaiting decision

    10 Ostlers Gate Droylsden Tameside M43 7EU

    Removal of existing conservatory and construction of new single storey rear extension

    27 Aug 2026 Full applications
  • 26/00684/FUL Awaiting decision

    6 Warwick Grove Audenshaw Tameside M34 5QT

    Proposed double storey side extension

    26 Aug 2026 Full applications