Skip to content
PlanIndex Get alerts
Menu

Planning application

15 Hall Drive Mottram Tameside SK14 6LH

Granted Tameside 21/00363/FUL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension to replace existing conservatory, internal and external alterations, including partial render.

As published by the council, reference 21/00363/FUL

Application record

Reference
21/00363/FUL
Type
Full Planning Permission
Status
Decided
Decision
Approve
Received
17 Mar 2021
Validated
14 Apr 2021
Decided
10 Jun 2021
Ward
Longdendale
Parish
Longdendale
Decision by
Delegated Decision
Postcode
SK14 6LH

Timeline

Dates from the published record

  1. 17 Mar 2021

    Received by Tameside

  2. 14 Apr 2021

    Validated

    Checked as complete and ready for consideration.

  3. 10 Jun 2021

    Decision issued: Approve

  4. 24 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 11 Hall Drive Mottram Tameside SK14 6LH

    23/00007/TPO Submitted 19 Jan 2023 64m away

    Tree works

    Granted Trees 3 docs
  • 3 Hall Drive Mottram Tameside SK14 6LH

    21/00076/TPO Submitted 13 Jul 2021 64m away

    T1 Oak - Fell. T2 Oak - Fell.

    Granted Trees 2 docs
  • Mottram Old Hall Old Hall Lane Mottram Tameside SK14 6LT

    26/00652/FUL Submitted 11 Aug 2026 117m away

    91% historically approved · decision due ~8 Oct

    Change of use of ancillary residential accommodation (Coach House) to form private dwelling. Erection of a dormer and other external and internal alterations

    Awaiting decision Full applications Loft or dormer 13 docs
    Domestic
  • Mottram Old Hall Old Hall Lane Mottram Tameside SK14 6LT

    26/00653/LBC Submitted 11 Aug 2026 117m away

    91% historically approved · decision due ~8 Oct

    Change of use of ancillary residential accommodation (Coach House) to form private dwelling. Erection of a dormer and other external and internal alterations

    Awaiting decision Heritage and listed buildings Loft or dormer 9 docs
    Domestic
  • Mottram Old Hall Old Hall Lane Mottram Tameside SK14 6LT

    26/00654/FUL Submitted 11 Aug 2026 117m away

    91% historically approved · decision due ~8 Oct

    Demolition of existing garden building and erection of detached dwelling

    Awaiting decision Full applications New dwelling Demolition 19 docs
    Domestic
  • 2 Hall Drive Mottram Tameside SK14 6LH

    19/00932/FUL Submitted 15 Oct 2019 138m away

    Two storey side extension to east elevation, single storey side extension to west elevation, two/single storey rear extension, single storey front extension, garage conversion to habitable room, construction of new driveway to front and external alterations to elevations

    Granted Full applications Extension 10 docs
    Small domestic

In Tameside

  • 26/00695/FUL Awaiting decision

    74 Thompson Road Denton Tameside M34 2PN

    Single storey detached outbuilding

    2 Sep 2026 Full applications
  • 26/00693/FUL Awaiting decision

    La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP

    Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger

    1 Sep 2026 Full applications
  • 26/00692/FUL Awaiting decision

    9 Cook Street Audenshaw Tameside M34 5DB

    Single storey rear and side extension

    28 Aug 2026 Full applications
  • 26/00686/FUL Awaiting decision

    10 Ostlers Gate Droylsden Tameside M43 7EU

    Removal of existing conservatory and construction of new single storey rear extension

    27 Aug 2026 Full applications
  • 26/00684/FUL Awaiting decision

    6 Warwick Grove Audenshaw Tameside M34 5QT

    Proposed double storey side extension

    26 Aug 2026 Full applications