Skip to content
PlanIndex Get alerts
Menu

Planning application

22 Harrison Street Stalybridge Tameside SK15 1DQ

Granted Tameside 21/00307/FUL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed two storey side and rear extension and single storey rear extension

As published by the council, reference 21/00307/FUL

Application record

Reference
21/00307/FUL
Type
Full Planning Permission
Status
Decided
Decision
Approve
Received
5 Mar 2021
Validated
5 Mar 2021
Decided
7 Jun 2021
Ward
Stalybridge North
Parish
Stalybridge
Decision by
Delegated Decision
Postcode
SK15 1DQ

Timeline

Dates from the published record

  1. 5 Mar 2021

    Received by Tameside

  2. 7 Jun 2021

    Decision issued: Approve

  3. 24 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Hyde

21 applications on PlanIndex · across 4 councils · 80% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 37 West Avenue Stalybridge Tameside SK15 1DE

    26/00661/FUL Submitted 13 Aug 2026 147m away

    91% historically approved · decision due ~8 Oct

    Single storey rear extension, rear decking, and front entrance canopy

    Awaiting decision Full applications Extension 4 docs
    Small domestic
  • 10 Hamilton Street Stalybridge Tameside SK15 1LL

    21/00505/FUL Submitted 12 Apr 2021 150m away

    First floor side/rear extension over the existing garage.

    Granted Full applications Extension 7 docs
  • 54 Stamford Street Stalybridge Tameside SK15 1LQ

    24/00055/CLUD Submitted 23 Jan 2024 154m away

    Lawful Development Certificate for Existing Use: for a 9 bed HMO for a use that has existed over 20 years

    Granted Amendments 9 docs
  • 29 Church Walk Stalybridge Tameside SK15 1BX

    24/00724/FUL Submitted 5 Aug 2024 159m away

    Single storey side and rear extension

    Granted Full applications Extension 14 docs
    Small domestic
  • 1 North Avenue Stalybridge Tameside SK15 1BZ

    26/00440/FUL Submitted 27 May 2026 163m away

    91% historically approved · decision due ~31 Aug

    Erection of a two storey 2no. bed dwelling to an existing pair of semi-detached dwellings and associated works

    Awaiting decision Full applications 11 docs
    Domestic
  • 1 North Avenue Stalybridge Tameside SK15 1BZ

    22/01226/FUL Submitted 23 Dec 2022 177m away

    Erection of a two storey 2no. bed dwelling to an existing pair of semi-detached dwellings and associated works

    Granted Full applications 22 docs
    Domestic

In Tameside

  • 26/00695/FUL Awaiting decision

    74 Thompson Road Denton Tameside M34 2PN

    Single storey detached outbuilding

    2 Sep 2026 Full applications
  • 26/00693/FUL Awaiting decision

    La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP

    Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger

    1 Sep 2026 Full applications
  • 26/00692/FUL Awaiting decision

    9 Cook Street Audenshaw Tameside M34 5DB

    Single storey rear and side extension

    28 Aug 2026 Full applications
  • 26/00686/FUL Awaiting decision

    10 Ostlers Gate Droylsden Tameside M43 7EU

    Removal of existing conservatory and construction of new single storey rear extension

    27 Aug 2026 Full applications
  • 26/00684/FUL Awaiting decision

    6 Warwick Grove Audenshaw Tameside M34 5QT

    Proposed double storey side extension

    26 Aug 2026 Full applications