Planning application
299 Wakefield Road Stalybridge Tameside SK15 3BY
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Part two storey/single storey rear extension (with raised terraces/roof garden), single storey extension to existing annex to side. Alterations to existing boundary treatments/walls, with associated landscaping works.
As published by the council, reference 21/00087/FUL
Application record
- Reference
- 21/00087/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approve
- Received
- 26 Jan 2021
- Validated
- 26 Feb 2021
- Decided
- 27 May 2021
- Ward
- Stalybridge North
- Parish
- Stalybridge
- Decision by
- Delegated Decision
- Postcode
- SK15 3BY
Timeline
Dates from the published record
-
26 Jan 2021
Received by Tameside
-
26 Feb 2021
Validated
Checked as complete and ready for consideration.
-
27 May 2021
Decision issued: Approve
-
24 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
68 applications on PlanIndex · across 11 councils · 83% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
21 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
299 Wakefield Road Stalybridge Tameside SK15 3BY
Discharge of conditions 3 (materials) and 4 (Arboricultural Impact Assessment and Method Statement) of planning application 21/00087/FUL
Granted Conditions 14 docs -
1 Beechwood Lane Stalybridge Tameside SK15 3BU
Proposed first floor side extension over existing kitchen extension. Removal of existing car port and construction of single storey side extension and conversion of existing garage with roof terrace above
Granted Full applications Extension 7 docsSmall domestic -
Woodfield House Wakefield Road Stalybridge Tameside SK15 3BY
98% historically approved · decision due ~16 Oct
T1 Chestnut - Remove damaged limb - Approved. T2 Ash - Monolith at 4m height - Approved.
Decided Trees 3 docs -
Land And Buildings On The South East Side Of Printworks Road Stalybridge Tameside
Variation of Conditions 2, 3, 6, 7, 8, 10, 11, 13, 14, 17, 18, 19 and addition of Condition 20 for scheme phasing and layout flexibility; of planning permission 23/00770/FUL for the Development of a Battery Storage Facility, associated infrastructure, earthworks, and means of access
Granted Full applications 20 docs -
The Shippon John Street Stalybridge Tameside SK15 3BS
Full discharge of Condition 7 (Contaminated Land) of planning reference 21/00006/FUL
Granted Conditions 8 docs -
Lynford Cottage John Street Stalybridge Tameside SK15 3BS
Proposed two storey side extension to existing detached dwelling
Withdrawn Full applications New dwelling Extension 12 docsDomestic
Other full applications applications
In Tameside
-
26/00695/FUL Awaiting decision
74 Thompson Road Denton Tameside M34 2PN
Single storey detached outbuilding
-
26/00693/FUL Awaiting decision
La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP
Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger
-
26/00692/FUL Awaiting decision
9 Cook Street Audenshaw Tameside M34 5DB
Single storey rear and side extension
-
26/00686/FUL Awaiting decision
10 Ostlers Gate Droylsden Tameside M43 7EU
Removal of existing conservatory and construction of new single storey rear extension
-
26/00684/FUL Awaiting decision
6 Warwick Grove Audenshaw Tameside M34 5QT
Proposed double storey side extension