Skip to content
PlanIndex Get alerts
Menu

Planning application

124 Three Counties Road Mossley Tameside OL5 9GA

Granted Tameside 21/00007/FUL Full Planning Permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Two Storey Rear Extension

As published by the council, reference 21/00007/FUL

Application record

Reference
21/00007/FUL
Type
Full Planning Permission
Status
Decided
Decision
Approve
Received
5 Jan 2021
Validated
5 Jan 2021
Decided
15 Jun 2021
Ward
Mossley
Parish
Mossley
Decision by
Delegated Decision
Postcode
OL5 9GA

Timeline

Dates from the published record

  1. 5 Jan 2021

    Received by Tameside

  2. 15 Jun 2021

    Decision issued: Approve

  3. 24 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

32 applications on PlanIndex · across 6 councils · 96% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 30 Three Counties Road Mossley Tameside OL5 9GA

    26/00034/TPO Submitted 10 Jun 2026 101m away

    98% historically approved · decision due ~5 Aug

    Tree works

    Awaiting decision Trees 2 docs
  • Britannia New Mill Queen Street Mossley Tameside OL5 9AQ

    24/00925/NDM Submitted 11 Oct 2024 201m away

    Application for prior approval of proposed demolition of Britannia New Mill.

    Granted Other Demolition 13 docs
  • Britannia New Mill Queen Street Mossley Tameside OL5 9AQ

    26/00098/FUL Submitted 3 Feb 2026 205m away

    91% historically approved · decision due ~4 May

    Redevelopment of a brownfield site to provide 17 dwellings and a 32-unit apartment building, with associated access, parking and landscaping.

    Awaiting decision Full applications 104 docs
    Major scheme
  • Flat Above Britannia Inn 217 Manchester Road Mossley Tameside OL5 9AJ

    26/00206/FUL Submitted 10 Mar 2026 264m away

    91% historically approved · decision due ~5 May

    Conversion of upper floors of existing public house into 5no. dwelling apartments with dormer loft conversion to the rear. The existing ground floor is to remain as a public house

    Awaiting decision Full applications New dwelling Loft or dormer 17 docs
    Several homes
  • 56 Hanover Street Mossley Tameside OL5 0HL

    22/01150/FUL Submitted 28 Nov 2022 339m away

    PROPOSED SINGLE STOREY SIDE & REAR EXTENSION

    Granted Full applications Extension 5 docs
    Small domestic
  • Boundary Walls To Woodend Mill Dark Lane Mossley Tameside OL5 9AT

    26/00658/LBC Submitted 12 Aug 2026 365m away

    91% historically approved · decision due ~23 Oct

    Listed Building Consent: Boundary walls located within the curtilage of Woodend Mill, taken down to footings to install / improve pipework below ground. The walls will be rebuilt using the existing stones, damaged stones replaced with reclaimed stone where required so not to alter the appearance of the walls.

    Awaiting decision Heritage and listed buildings 8 docs

In Tameside

  • 26/00695/FUL Awaiting decision

    74 Thompson Road Denton Tameside M34 2PN

    Single storey detached outbuilding

    2 Sep 2026 Full applications
  • 26/00693/FUL Awaiting decision

    La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP

    Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger

    1 Sep 2026 Full applications
  • 26/00692/FUL Awaiting decision

    9 Cook Street Audenshaw Tameside M34 5DB

    Single storey rear and side extension

    28 Aug 2026 Full applications
  • 26/00686/FUL Awaiting decision

    10 Ostlers Gate Droylsden Tameside M43 7EU

    Removal of existing conservatory and construction of new single storey rear extension

    27 Aug 2026 Full applications
  • 26/00684/FUL Awaiting decision

    6 Warwick Grove Audenshaw Tameside M34 5QT

    Proposed double storey side extension

    26 Aug 2026 Full applications