Skip to content
PlanIndex Get alerts
Menu

Planning application

Nield Street / Smith Street Mossley Tameside OL5 0PF

Granted Tameside 20/01253/FUL Full Planning Permission

Works: New dwelling Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Residential development comprising of 31No. 1 bedroom retirement living apartments with associated landscaping and external works including demolition of existing warehouse

As published by the council, reference 20/01253/FUL

Application record

Reference
20/01253/FUL
Type
Full Planning Permission
Status
Decided
Decision
Approve
Received
30 Dec 2020
Validated
4 Feb 2021
Decided
3 Sep 2021
Ward
Mossley
Parish
Mossley
Decision by
Committee (Speakers Panel) Decision
Postcode
OL5 0PF

Timeline

Dates from the published record

  1. 30 Dec 2020

    Received by Tameside

  2. 4 Feb 2021

    Validated

    Checked as complete and ready for consideration.

  3. 3 Sep 2021

    Decision issued: Approve

  4. 6 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Ashton-Under-Lyne

23 applications on PlanIndex · across 5 councils · 88% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

32 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Marsden Close Dean Street Mossley Tameside OL5 0PE

    20/00066/PLCOND Submitted 15 Jun 2020 67m away

    Discharge of condtion no. 9 (Highway access works) of approved application 18/00811/FUL

    Granted Conditions 14 docs
  • Marton House Shire Croft Mossley Tameside OL5 0AR

    26/00026/TPO Submitted 18 May 2026 110m away

    T1 Sycamore - Pruning as per submitted diagram T2 Ash - Pruning as per submitted diagram

    Granted Trees 5 docs
  • Co-Op 23 Arundel Street Mossley Tameside OL5 0LS

    22/01213/P3N Submitted 14 Dec 2022 121m away

    Application to determine if prior approval is required for a proposed: Collection Facility within the Curtilage of a Shop: Installation of InPost Parcel Locker

    Granted Full applications 9 docs
  • Chellow Dene House Waterton Lane Mossley Tameside OL5 0LU

    23/00005/TPO Submitted 18 Jan 2023 121m away

    G2 Sycamores x2 as per plan - Fell

    Granted Trees 2 docs
  • Car Park At Cross Street Mossley

    21/00049/PLCOND Submitted 18 Apr 2021 134m away

    Discharge of condition no. 7 of 18/00756/FUL (Ground Contamination) of approved application 18/00756/FUL Groundsure Enviro All-in-One Report - MR-51002126299001-1558527728645

    Granted Conditions 4 docs
  • 25 Stamford Street Mossley Tameside OL5 0LL

    26/00559/FUL Submitted 8 Jul 2026 146m away

    91% historically approved · decision due ~8 Sep

    Subdivision of the property into retail unit at ground floor and basement level (Use Class E) and two-bed apartment at first floor (Use Class C3). Other external alterations including new first floor window to front elevation and external rear staircase to accommodation to the first floor

    Awaiting decision Full applications Windows or glazing 16 docs

In Tameside

  • 26/00695/FUL Awaiting decision

    74 Thompson Road Denton Tameside M34 2PN

    Single storey detached outbuilding

    2 Sep 2026 Full applications
  • 26/00693/FUL Awaiting decision

    La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP

    Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger

    1 Sep 2026 Full applications
  • 26/00692/FUL Awaiting decision

    9 Cook Street Audenshaw Tameside M34 5DB

    Single storey rear and side extension

    28 Aug 2026 Full applications
  • 26/00686/FUL Awaiting decision

    10 Ostlers Gate Droylsden Tameside M43 7EU

    Removal of existing conservatory and construction of new single storey rear extension

    27 Aug 2026 Full applications
  • 26/00684/FUL Awaiting decision

    6 Warwick Grove Audenshaw Tameside M34 5QT

    Proposed double storey side extension

    26 Aug 2026 Full applications