Planning application
Nield Street / Smith Street Mossley Tameside OL5 0PF
Works: New dwelling Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Residential development comprising of 31No. 1 bedroom retirement living apartments with associated landscaping and external works including demolition of existing warehouse
As published by the council, reference 20/01253/FUL
Application record
- Reference
- 20/01253/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approve
- Received
- 30 Dec 2020
- Validated
- 4 Feb 2021
- Decided
- 3 Sep 2021
- Ward
- Mossley
- Parish
- Mossley
- Decision by
- Committee (Speakers Panel) Decision
- Postcode
- OL5 0PF
Timeline
Dates from the published record
-
30 Dec 2020
Received by Tameside
-
4 Feb 2021
Validated
Checked as complete and ready for consideration.
-
3 Sep 2021
Decision issued: Approve
-
6 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Ashton-Under-Lyne
23 applications on PlanIndex · across 5 councils · 88% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
32 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Marsden Close Dean Street Mossley Tameside OL5 0PE
Discharge of condtion no. 9 (Highway access works) of approved application 18/00811/FUL
Granted Conditions 14 docs -
Marton House Shire Croft Mossley Tameside OL5 0AR
T1 Sycamore - Pruning as per submitted diagram T2 Ash - Pruning as per submitted diagram
Granted Trees 5 docs -
Co-Op 23 Arundel Street Mossley Tameside OL5 0LS
Application to determine if prior approval is required for a proposed: Collection Facility within the Curtilage of a Shop: Installation of InPost Parcel Locker
Granted Full applications 9 docs -
Chellow Dene House Waterton Lane Mossley Tameside OL5 0LU
G2 Sycamores x2 as per plan - Fell
Granted Trees 2 docs -
Car Park At Cross Street Mossley
Discharge of condition no. 7 of 18/00756/FUL (Ground Contamination) of approved application 18/00756/FUL Groundsure Enviro All-in-One Report - MR-51002126299001-1558527728645
Granted Conditions 4 docs -
25 Stamford Street Mossley Tameside OL5 0LL
91% historically approved · decision due ~8 Sep
Subdivision of the property into retail unit at ground floor and basement level (Use Class E) and two-bed apartment at first floor (Use Class C3). Other external alterations including new first floor window to front elevation and external rear staircase to accommodation to the first floor
Awaiting decision Full applications Windows or glazing 16 docs
Other full applications applications
In Tameside
-
26/00695/FUL Awaiting decision
74 Thompson Road Denton Tameside M34 2PN
Single storey detached outbuilding
-
26/00693/FUL Awaiting decision
La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP
Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger
-
26/00692/FUL Awaiting decision
9 Cook Street Audenshaw Tameside M34 5DB
Single storey rear and side extension
-
26/00686/FUL Awaiting decision
10 Ostlers Gate Droylsden Tameside M43 7EU
Removal of existing conservatory and construction of new single storey rear extension
-
26/00684/FUL Awaiting decision
6 Warwick Grove Audenshaw Tameside M34 5QT
Proposed double storey side extension