Planning application
Stayley Hall(Remains) Howard Street Stalybridge Tameside SK15 3ER
Works: New dwelling Several homes
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Change of use of Stayley Hall barns and outbuildings into 8 No. 4 bedroomed dwellinghouses, 4no. duplex residences, 4no. apartments, together wth ancillary garages and parking areas, access road and hard and soft landscaping
As published by the council, reference 02/01446/FUL
Application record
- Reference
- 02/01446/FUL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Approve
- Received
- 20 Nov 2002
- Validated
- 20 Nov 2002
- Decided
- 6 Oct 2004
- Ward
- Stalybridge South
- Parish
- Stalybridge
- Decision by
- Committee (Speakers Panel) Decision
- Postcode
- SK15 3ER
Timeline
Dates from the published record
-
20 Nov 2002
Received by Tameside
-
6 Oct 2004
Decision issued: Approve
-
7 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
43 Cypress Oaks Stalybridge Tameside SK15 3GA
LOFT CONVERSION WITH ROOF WINDOWS TO FRONT AND REAR
Granted Full applications Loft or dormer Windows or glazing 4 docs -
22 Copper Beech Drive Stalybridge Tameside SK15 3GN
First floor side extension over utility room
Granted Full applications Extension 9 docs -
309 Huddersfield Road Stalybridge Tameside SK15 3DY
Single storey rear extension with flat roof and a single story garage to side with pitched roof.
Granted Full applications Extension 7 docsSmall domestic -
Site At Grafton Street Stalybridge Tameside SK15 3EW
Full discharge of Condition 13 (Contaminated Land) of planning reference 24/00582/FUL
Withdrawn Conditions 5 docs -
Land And Buildings On The South East Side Of Printworks Road Stalybridge Tameside
Variation of Conditions 2, 3, 6, 7, 8, 10, 11, 13, 14, 17, 18, 19 and addition of Condition 20 for scheme phasing and layout flexibility; of planning permission 23/00770/FUL for the Development of a Battery Storage Facility, associated infrastructure, earthworks, and means of access
Granted Full applications 20 docs -
Site At Grafton Street Stalybridge Tameside SK15 3EW
Variation of Condition 2 (Approved Drawings) of planning permission 24/00582/FUL (Variation of condition 3 (approved plans) of planning permission 21/00260/OUT erection of 3 no. 3 bed terraced houses)
Granted Full applications 15 docs
Other full applications applications
In Tameside
-
26/00695/FUL Awaiting decision
74 Thompson Road Denton Tameside M34 2PN
Single storey detached outbuilding
-
26/00693/FUL Awaiting decision
La Lupa 17 Stamford Street Stalybridge Tameside SK15 1JP
Variation of Condition 2 (Approved Plans) on planning permission 25/00553/FUL, to include the application of render to the rear elevation outrigger, and the removal of 6 no. side windows and 4 no. rooflights from the outrigger
-
26/00692/FUL Awaiting decision
9 Cook Street Audenshaw Tameside M34 5DB
Single storey rear and side extension
-
26/00686/FUL Awaiting decision
10 Ostlers Gate Droylsden Tameside M43 7EU
Removal of existing conservatory and construction of new single storey rear extension
-
26/00684/FUL Awaiting decision
6 Warwick Grove Audenshaw Tameside M34 5QT
Proposed double storey side extension