Skip to content
PlanIndex Get alerts
Menu

Planning application

Land At Parcels R3-R5 Land North Of A420 New Eastern Villages South Marston Swindon

Granted Swindon S/RES/25/0437 Reserved Matters

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

A reserved matters application (access, appearance, layout, scale and landscaping) for 107 dwellings and associated infrastructure - Reserved Matters from previous outline permission S/OUT/13/1555.

As published by the council, reference S/RES/25/0437

Application record

Reference
S/RES/25/0437
Type
Reserved Matters
Status
Application Permitted
Decision
Granted As published: Reserved Matters Approved
Received
31 Mar 2025
Validated
31 Mar 2025
Decided
19 Dec 2025
Ward
St Margaret And South Marston
Parish
South Marston
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 31 Mar 2025

    Received by Swindon

  2. 19 Dec 2025

    Decision issued: Reserved Matters Approved

  3. 16 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: S/OUT/13/1555 (Application Granted)

Documents

Plans, drawings, consultee responses and the officer's report

203 documents on file for this application

  • 000010039-DISCHARGE_0.00 CIL · 17 Jun 2026
  • LIABILITY_NOTICE_REDACTED CIL · 05 Jun 2026
  • ACKNOWLEDGEMENT_-_COMMENCEMENT_NOTICE_REDACTED CIL · 05 Jun 2026
  • HIGHWAYS COMMENTS Consultee Comment · 25 Nov 2025
  • PARKING STRATEGY PLAN Revised Drawing · 11 Nov 2025
  • EXTERNAL ENCLOSURES PLAN Revised Drawing · 11 Nov 2025
  • STREET SCENES Revised Drawing · 11 Nov 2025
  • MATERIALS PLAN Revised Drawing · 11 Nov 2025
  • HOUSING MIX PLAN Revised Drawing · 11 Nov 2025
  • LANDSCAPE PROPOSALS SHEET 5 OF 9 Revised Drawing · 11 Nov 2025
  • LANDSCAPE PROPOSALS SHEET 6 OF 9 Revised Drawing · 11 Nov 2025
  • PRIVATE STREET LIGHTS Revised Drawing · 11 Nov 2025
  • PLANNING STATEMENT Supporting Documents · 11 Nov 2025
  • LAND USE PLAN Revised Drawing · 11 Nov 2025
  • GENERAL ARRANGEMENT Revised Drawing · 11 Nov 2025
  • PLANTING SCHEDULE Revised Drawing · 11 Nov 2025
  • LANDSCAPE PROPOSALS SHEET 1 OF 9 Revised Drawing · 11 Nov 2025
  • LANDSCAPE PROPOSALS SHEET 2 OF 9 Revised Drawing · 11 Nov 2025
  • LANDSCAPE PROPOSALS SHEET 3 OF 9 Revised Drawing · 11 Nov 2025
  • LANDSCAPE PROPOSALS SHEET 4 OF 9 Revised Drawing · 11 Nov 2025
  • LANDSCAPE PROPOSALS SHEET 7 OF 9 Revised Drawing · 11 Nov 2025
  • LANDSCAPE PROPOSALS SHEET 8 OF 9 Revised Drawing · 11 Nov 2025
  • LANDSCAPE PROPOSALS SHEET 9 OF 9 Revised Drawing · 11 Nov 2025
  • PLANNING-LEVELS Revised Drawing · 11 Nov 2025
  • SURFACE FINISHES Revised Drawing · 11 Nov 2025
  • SECTION38 Revised Drawing · 11 Nov 2025
  • ARBORICULTURAL METHOD STATEMENT Supporting Documents · 11 Nov 2025
  • COMBINED SERVICES Revised Drawing · 11 Nov 2025
  • HOUSETYPE BOOKLET ISSUE 4 - FAIRTHORNE & THORNHILL Supporting Documents · 11 Nov 2025
  • CHARACTER AREAS PLAN Revised Drawing · 11 Nov 2025
  • LANDSCAPE, ECOLOGY AND ARBORICULTURAL MANAGEMENT PLAN Supporting Documents · 11 Nov 2025
  • PLANNING LAYOUT Revised Drawing · 11 Nov 2025
  • KERB PLAN Revised Drawing · 11 Nov 2025
  • ROAD GEOMETRY Revised Drawing · 11 Nov 2025
  • HOUSETYPE BOOKLET ISSUE 4 - MARSTON GATE & NIGHTINGALE CORNER Supporting Documents · 11 Nov 2025
  • BUILDING HEIGHTS PLAN Revised Drawing · 11 Nov 2025
  • HIGHWAYS COMMENTS Consultee Comment · 16 Oct 2025
  • RESPONSE TO HIGHWAYS Correspondence · 07 Oct 2025
  • ROAD GEOMETRY Revised Drawing · 07 Oct 2025
  • PARKING STRATEGY PLAN Revised Drawing · 07 Oct 2025
  • DESIGNER?S RESPONSE STATEMENT Correspondence · 07 Oct 2025
  • KERB PLAN Revised Drawing · 02 Oct 2025
  • SURFACE FINISHES Revised Drawing · 02 Oct 2025
  • ROAD GEOMETRY Revised Drawing · 02 Oct 2025
  • SECTION 38 Revised Drawing · 02 Oct 2025
  • REFUSE DISTANCES Revised Drawing · 02 Oct 2025
  • PLANNING LEVELS Revised Drawing · 02 Oct 2025
  • REFUSE TRACK PLOT Revised Drawing · 02 Oct 2025
  • DRAINAGE STRATEGY Revised Drawing · 02 Oct 2025
  • PLANTING SCHEDULE Supporting Documents · 02 Oct 2025
  • LANDSCAPE PROPOSALS SHEET 1 Revised Drawing · 02 Oct 2025
  • LANDSCAPE PROPOSALS SHEET 2 Revised Drawing · 02 Oct 2025
  • LANDSCAPE PROPOSALS SHEET 3 Revised Drawing · 02 Oct 2025
  • LANDSCAPE PROPOSALS SHEET 4 Revised Drawing · 02 Oct 2025
  • LANDSCAPE PROPOSALS SHEET 5 Revised Drawing · 02 Oct 2025
  • LANDSCAPE PROPOSALS SHEET 6 Revised Drawing · 02 Oct 2025
  • LANDSCAPE PROPOSALS SHEET 8 Revised Drawing · 02 Oct 2025
  • LANDSCAPE PROPOSALS SHEET 9 Revised Drawing · 02 Oct 2025
  • GENERAL ARRANGEMENT Revised Drawing · 02 Oct 2025
  • PLANNING LAYOUT Revised Drawing · 02 Oct 2025
  • LAND USE PLAN Revised Drawing · 02 Oct 2025
  • STREET SCENES Revised Drawing · 02 Oct 2025
  • BUILDING HEIGHTS PLAN Revised Drawing · 02 Oct 2025
  • RESPONSE TO CONSULTEE COMMENTS Correspondence · 02 Oct 2025
  • PARKING STRATEGY PLAN Revised Drawing · 02 Oct 2025
  • FAIRTHORNE & THORNHILL HOUSETYPE BOOKLET Supporting Documents · 02 Oct 2025
  • SURFACE FINISHES. Revised Drawing · 02 Oct 2025
  • MATERIALS PLAN Revised Drawing · 02 Oct 2025
  • CHARACTER AREAS PLAN Revised Drawing · 02 Oct 2025
  • KERB PLAN Revised Drawing · 02 Oct 2025
  • COMBINED SERVICES Revised Drawing · 02 Oct 2025
  • LANDSCAPE PROPOSALS SHEET 7 Revised Drawing · 02 Oct 2025
  • HOUSING MIX PLAN Revised Drawing · 02 Oct 2025
  • EXTERNAL ENCLOSURES PLAN Revised Drawing · 02 Oct 2025
  • PLANNING LAYOUT Revised Drawing · 02 Oct 2025
  • MARSTON GATE & NIGHTINGALE CORNER HOUSETYPE BOOKLET Supporting Documents · 02 Oct 2025
  • LANDSCAPE PROPOSALS SHEET 7 Revised Drawing · 02 Oct 2025
  • HIGHWAYS COMMENTS Consultee Comment · 24 Sep 2025
  • COMBINED-SERVICES Revised Drawing · 12 Sep 2025
  • ROAD GEOMETRY Revised Drawing · 12 Sep 2025
  • SURFACE FINISHES Revised Drawing · 12 Sep 2025
  • SURFACE FINISHES Revised Drawing · 12 Sep 2025
  • DRAINAGE-STRATEGY Revised Drawing · 12 Sep 2025
  • REFUSE TRACK PLOT Revised Drawing · 12 Sep 2025
  • VAN TRACK PLOT Revised Drawing · 12 Sep 2025
  • PLANNING LEVELS Revised Drawing · 12 Sep 2025
  • REFUSE DISTANCES Revised Drawing · 12 Sep 2025
  • PLANNING LAYOUT Revised Drawing · 12 Sep 2025
  • MATERIALS PLAN Revised Drawing · 12 Sep 2025
  • LAND USE PLAN Revised Drawing · 12 Sep 2025
  • HOUSING MIX PLAN Revised Drawing · 12 Sep 2025
  • BUILDING HEIGHTS PLAN Revised Drawing · 12 Sep 2025
  • CHARACTER AREAS PLAN Revised Drawing · 12 Sep 2025
  • EXTERNAL ENCLOSURES PLAN Revised Drawing · 12 Sep 2025
  • PROPOSED RESIDENTIAL DEVELOPMENT S38 WORKS Supporting Documents · 12 Sep 2025
  • GENERAL ARRANGEMENT Revised Drawing · 12 Sep 2025
  • PLANTING SCHEDULE Supporting Documents · 12 Sep 2025
  • LANDSCAPE PROPOSALS - SHEET 1 Revised Drawing · 12 Sep 2025
  • LANDSCAPE PROPOSALS - SHEET 2 Revised Drawing · 12 Sep 2025
  • LANDSCAPE PROPOSALS - SHEET 5 Revised Drawing · 12 Sep 2025
  • LANDSCAPE PROPOSALS - SHEET 6 Revised Drawing · 12 Sep 2025
  • LANDSCAPE PROPOSALS - SHEET 7 Revised Drawing · 12 Sep 2025
  • KERB PLAN Revised Drawing · 12 Sep 2025
  • KERB PLAN Revised Drawing · 12 Sep 2025
  • SECTION 38 Revised Drawing · 12 Sep 2025
  • PARKING STRATEGY PLAN Revised Drawing · 12 Sep 2025
  • LANDSCAPE PROPOSALS - SHEET 3 Revised Drawing · 12 Sep 2025
  • LANDSCAPE PROPOSALS - SHEET 4 Revised Drawing · 12 Sep 2025
  • LANDSCAPE ARCHITECT Consultee Comment · 10 Sep 2025
  • URBAN DESIGN COMMENTS Consultee Comment · 10 Sep 2025
  • URBAN DESIGN DETAILS Supporting Documents · 09 Sep 2025
  • SOUTH MARSTON PARISH COUNCIL Public Comment · 18 Aug 2025
  • HIGHWAYS COMMENTS Consultee Comment · 15 Aug 2025
  • RESPONSE TO CONSERVATION Correspondence · 07 Aug 2025
  • CONSERVATION OFFICER COMMENTS Consultee Comment · 07 Aug 2025
  • BUILDING HEIGHTS PLAN Revised Drawing · 01 Aug 2025
  • PLANNING LAYOUT Revised Drawing · 01 Aug 2025
  • STREET SCENES Revised Drawing · 01 Aug 2025
  • MATERIALS PLAN Revised Drawing · 01 Aug 2025
  • PARKING STRATEGY PLAN Revised Drawing · 01 Aug 2025
  • CHARACTER AREAS PLAN Revised Drawing · 01 Aug 2025
  • EXTERNAL ENCLOSURES PLAN Revised Drawing · 01 Aug 2025
  • KERB PLAN Revised Drawing · 01 Aug 2025
  • SECTION 38 Revised Drawing · 01 Aug 2025
  • REFUSE TRACK PLOT Revised Drawing · 01 Aug 2025
  • PLANNING LEVELS Revised Drawing · 01 Aug 2025
  • LANDSCAPE PROPOSALS Revised Drawing · 01 Aug 2025
  • LANDSCAPE PROPOSALS Revised Drawing · 01 Aug 2025
  • LANDSCAPE PROPOSALS Revised Drawing · 01 Aug 2025
  • LANDSCAPE PROPOSALS Revised Drawing · 01 Aug 2025
  • LANDSCAPE PROPOSALS Revised Drawing · 01 Aug 2025
  • LANDSCAPE PROPOSALS Revised Drawing · 01 Aug 2025
  • LANDSCAPE PROPOSALS Revised Drawing · 01 Aug 2025
  • HERITAGE STATEMENT Supporting Documents · 01 Aug 2025
  • ARBORICULTURAL METHOD STATEMENT Supporting Documents · 01 Aug 2025
  • MARSTON GATE+NIGHTINGALE - HOUSETYPE BOOKLET Revised Drawing · 01 Aug 2025
  • FAIRTHORNE & THORNHILL - HOUSETYPE BOOKLET Revised Drawing · 01 Aug 2025
  • KERB PLAN Revised Drawing · 01 Aug 2025
  • SURFACE FINISHES. Revised Drawing · 01 Aug 2025
  • REFUSE DISTANCES Revised Drawing · 01 Aug 2025
  • ROAD GEOMETRY Revised Drawing · 01 Aug 2025
  • SURFACE FINISHES. Revised Drawing · 01 Aug 2025
  • DRAINAGE STRATEGY Revised Drawing · 01 Aug 2025
  • GENERAL ARRANGEMENT Revised Drawing · 01 Aug 2025
  • LANDSCAPE PROPOSALS Revised Drawing · 01 Aug 2025
  • LANDSCAPE PROPOSALS Revised Drawing · 01 Aug 2025
  • RE-SUBMISSION COVERING LETTER Correspondence · 01 Aug 2025
  • LAND USE PLAN Revised Drawing · 01 Aug 2025
  • HOUSING MIX PLAN Revised Drawing · 01 Aug 2025
  • COMBINED-SERVICES Revised Drawing · 01 Aug 2025
  • DRAINAGE COMMENTS Consultee Comment · 28 May 2025
  • ECOLOGY Consultee Comment · 13 May 2025
  • HIGHWAYS Consultee Comment · 25 Apr 2025
  • SOUTH MARSTON PARISH COUNCIL Consultee Comment · 24 Apr 2025
  • LANDSCAPE Consultee Comment · 23 Apr 2025
  • HOUSING DEPARTMENT COMMENTS Consultee Comment · 22 Apr 2025
  • 54 GILBERT PLACE, LOWRY WAY, SWINDON Public Comment · 10 Apr 2025
  • KERB PLAN Drawing · 01 Apr 2025
  • SITE LOCATION PLAN Drawing · 01 Apr 2025
  • GENERAL ARRANGEMENT Drawing · 01 Apr 2025
  • LANDSCAPE PROPOSALS Drawing · 01 Apr 2025
  • LANDSCAPE PROPOSALS Drawing · 01 Apr 2025
  • LANDSCAPE PROPOSALS Drawing · 01 Apr 2025
  • LANDSCAPE PROPOSALS Drawing · 01 Apr 2025
  • LANDSCAPE PROPOSALS Drawing · 01 Apr 2025
  • LANDSCAPE PROPOSALS Drawing · 01 Apr 2025
  • LANDSCAPE PROPOSALS Drawing · 01 Apr 2025
  • LANDSCAPE PROPOSALS Drawing · 01 Apr 2025
  • LANDSCAPE PROPOSALS Drawing · 01 Apr 2025
  • PLANTING SCHEDULE Drawing · 01 Apr 2025
  • COMBINED SERVICES Drawing · 01 Apr 2025
  • KERB PLAN Drawing · 01 Apr 2025
  • ROAD GEOMETRY Drawing · 01 Apr 2025
  • SURFACE FINISHES Drawing · 01 Apr 2025
  • SURFACE FINISHES Drawing · 01 Apr 2025
  • SECTION 38 Drawing · 01 Apr 2025
  • DRAINAGE STRATEGY Drawing · 01 Apr 2025
  • REFUSE TRACK PLOT Drawing · 01 Apr 2025
  • PLANNING LEVELS Drawing · 01 Apr 2025
  • REFUSE DISTANCE Drawing · 01 Apr 2025
  • MARSTON GATE & NIGHTINGALE CORNER & FAIRTHORNE & THORNHILL ASSESSMENT Supporting Documents · 01 Apr 2025
  • TOPOGRAPHICAL SURVEY Drawing · 01 Apr 2025
  • STREETSCENES Drawing · 01 Apr 2025
  • EXTERNAL DETAILING Drawing · 01 Apr 2025
  • MATERIALS LAYOUT Drawing · 01 Apr 2025
  • CARPORTS AND GARAGES Drawing · 01 Apr 2025
  • LAND USE PLAN Drawing · 01 Apr 2025
  • HOUSING MIX PLAN Drawing · 01 Apr 2025
  • PARKING STRATEGY PLAN Drawing · 01 Apr 2025
  • BUILDING HEIGHTS PLAN Drawing · 01 Apr 2025
  • CHARACTER AREAS PLAN Drawing · 01 Apr 2025
  • EXTERNAL ENCLOSURES PLAN Drawing · 01 Apr 2025
  • STATEMENT OF COMPLIANCE Supporting Documents · 01 Apr 2025
  • HOUSETYPE BOOKLET Drawing · 01 Apr 2025
  • HOUSETYPE BOOKLET Drawing · 01 Apr 2025
  • ARBORICULTURAL METHOD STATEMENT Supporting Documents · 01 Apr 2025
  • PLANNING STATEMENT Supporting Documents · 01 Apr 2025
  • PLANNING LAYOUT Drawing · 01 Apr 2025
  • PLANNING LAYOUT Drawing · 01 Apr 2025
  • SOFT LANDSCAPE SPECIFICATION Supporting Documents · 01 Apr 2025
  • SOFT LANDSCAPE MANAGEMENT & MAINTENANCE PLAN Supporting Documents · 01 Apr 2025
  • COVERING LETTER Supporting Documents · 01 Apr 2025
  • STATEMENT OF COMPLIANCE Supporting Documents · 01 Apr 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Swindon granted permission on 19 December 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About reserved matters applications

A reserved matters application fills in the detail held back from an earlier outline permission, judged against that permission rather than the principle of development. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Land North Of A420 Eastern Villages Swindon

    S/COND/26/0106 Submitted 27 Jan 2026 150 yards away

    Discharge of Conditions at South Marston Central Substation (ref: S/RES/25/1564) (11) LEAMP (17) Bats (25) Turning Facilities (36) Construction Method Statement (37) Construction Environmental Management Plan (42) Surface Water Drainage (54) Materials from previous application S/OUT/13/1555.

    Granted Conditions 21 docs
  • Land North Of A420 Eastern Villages Swindon

    S/RES/25/1564 Submitted 1 Dec 2025 150 yards away

    Reserved matters application (following planning application S/OUT/13/1555) for details of the access, layout, scale, appearance and landscaping in relation to South Marston Central electricity substation. The outline planning application was subject to and submitted with an Environmental Impact Assessment.

    Granted Reserved matters 16 docs
  • Manor Farm Manor Farm Lane South Marston Swindon SN3 4SJ

    S/COND/23/0937 Submitted 24 Jul 2023 150 yards away

    Discharge of Conditions 3, 12, 13, 14, 15, 16, 17 and 18 (parts 1 and 2) from previous Planning Permission S/20/0851 - Change of use from light industrial workshops (Use Class B1(c)) to 3no. residential dwellings (Use Class C3).

    Granted Conditions 26 docs
  • Land To The North Of The A420, Known As South Marston And Rowborough

    S/RES/25/1582 Submitted 3 Dec 2025 200 yards away

    Reserved matters application (following planning application S/OUT/13/1555) for details of the access, layout, scale, appearance and landscaping in relation to South Marston Northern electricity substation.

    Granted Reserved matters 24 docs
  • Land North Of A420 Eastern Villages Swindon

    S/COND/26/0358 Submitted 18 Mar 2026 200 yards away

    Partial Discharge of Conditions (Northern Substation) (11) LEAMP (13) Tree Protection (17) Bats (31) Movement Phasing Plan (36) Construction Method Statement (37) Construction Environmental Management Plan (42) Surface Water Drainage (53) Slab Levels (54) Materials (56) Street Lighting and Street Furniture previous application S/OUT/13/1555.

    Granted Conditions Trees 23 docs
  • Land To The North Of The A420, Known As South Marston And Rowborough Swindon

    S/RES/25/0836 Submitted 3 Jul 2025 250 yards away

    Reserved matters application (following planning application S/OUT/13/1555) for Land North of A420, Eastern Villages. Details of the access, layout, scale, appearance and landscaping in relation to the western section of the Northern Loop Road connecting from the Primary Street to Parcels R1 and R2; and onwards to the north of Parcel R3. The outline planning application was subject to and submitted with an Environmental Impact Assessment.

    Granted Reserved matters 49 docs

In Swindon

  • S/RES/26/0873 Granted

    Little Rose Farm Lower Village Blunsdon SN26 7BJ

    Reserved matters application (following planning application S/OUT/23/1499) for details of appearance, landscaping and layout

    Received 10 Jul, published by the council 26 Jul 2026 Reserved matters
  • S/RES/25/1485 Granted

    Land To The North Of A420 South Marston Swindon

    Reserved matters application (following planning application S/OUT/13/1555) for details of the access, layout, scale, appearance and landscaping in relation to South Marston West electricity substation. The outline planning application was subject to and submitted with an Environmental Impact Assessment.

    Received 13 Nov, published by the council 26 Jul 2026 Reserved matters
  • S/RES/25/1581 Granted

    Land North Of A420 Known As South Marston And Rowborough Eastern Villages Swindon

    Construction of the Rowborough Primary Street and associated infrastructure (access, layout and scale) - Reserved Matters from previous outline permission S/OUT/13/1555.

    Received 3 Dec, published by the council 26 Jul 2026 Reserved matters
  • S/RES/26/0208 Granted

    Land At Langton Park Wroughton Swindon

    Partial Reserved Matters application (following Outline planning application S/OUT/23/0240) for the erection of 2 dwellings.

    Received 13 Feb, published by the council 26 Jul 2026 Reserved matters
  • S/RES/25/1389 Granted

    Parcels R1-R2 New Eastern Villages Swindon Wiltshire

    Reserved matters application (access, appearance, layout, scale and landscaping) for 122 dwellings and associated infrastructure -Reserved Matters from previous outline permission S/OUT/13/1555.

    Received 27 Oct, published by the council 26 Jul 2026 Reserved matters