Skip to content
PlanIndex Get alerts
Menu

Planning application

New Eastern Villages Southern Connector Road Swindon

Granted Swindon S/COND/22/0296 Discharge of Condition Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of conditions from previous permission S/20/1538 - Phase 2B / 2C works: Conditions 3 (Construction Phasing Plan), 4 (Construction Method Statement), 5 (Construction and Environmental Management Plan), Condition 11 (Landscape and Ecological Management Plan) and 26 (Traffic Management Plan).

As published by the council, reference S/COND/22/0296

Application record

Reference
S/COND/22/0296
Type
Discharge of Condition Application
Status
Decided
Decision
Granted As published: Conditions Partially Discharged
Received
22 Feb 2022
Validated
22 Feb 2022
Decided
24 Oct 2022
Ward
Ridgeway
Parish
Wanborough
Decision by
Delegated Decision

Site history

Applications at this address on the Swindon register

This site has had 5 applications since 2021: 5 approved, 0 refused.

  • S/COND/22/1550 Granted

    New Eastern Villages Southern Connector Road Swindon

    Discharge of condition 16 (Flood Risk) from Planning Permission S/20/1538 - Variation of conditions 3 - 7, 9, 11, 12, 14, 15, 17 - 22, 24 and 26 from previous permission S/19/0703 for the construction of a new road, to link the A419 Commonhead Roundabout to the proposed New Eastern Villages (NEV) development including improvements to the existing Commonhead Roundabout and Pack Hill, new junctions with Pack Hill, The Marsh and Wanborough Road, new footway/cycleway and associated earthworks, drainage works and landscaping.

    Decided 13 Mar 2023 Conditions
  • S/COND/22/0346 Granted

    New Eastern Villages Southern Connector Road Swindon

    Discharge of conditions from previous permission S/20/1538 - Phase 2B / 2C works: Condition 6 (Full Technical Design Details), 7 (Landscape Scheme), 9 (Protection of retained trees and other vegetation during construction), 12 (Lighting Strategy), 22 (Commonhead Junction - White Lining) and 24 (Commonhead Junction - Detailed Design).

    Decided 24 May 2023 Conditions
  • S/COND/21/1732 Granted

    New Eastern Villages Southern Connector Road Swindon

    Discharge of conditions 3, 4, 5, 6, 9, 14, 20 and 26 (Phase 2A) following planning permission of application S/20/1538.

    Decided 19 Jul 2022 Conditions
  • S/COND/21/1563 Granted

    New Eastern Villages Southern Connector Road Swindon

    Discharge of conditions 3 (Construction Phasing Plan), 4 (Construction Method Statement), 5 (Construction and Environmental Management Plan), 9 (Tree and other vegetation protection during construction period) and 26 (Traffic Management Plan) from previous permission S/20/1538.

    Decided 3 Nov 2021 Conditions

Timeline

Dates from the published record

  1. 22 Feb 2022

    Received by Swindon

  2. 24 Oct 2022

    Decision issued: Conditions Partially Discharged

  3. 6 Oct 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Atkins Ltd Agent, registered in Swansea

Active · incorporated 2023 · Swansea

120 applications on PlanIndex · across 44 councils · 99% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

52 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Swindon granted permission on 24 October 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

In Swindon

  • S/COND/26/1039 Withdrawn

    St Fillans High Street Wanborough Swindon SN4 0AD

    Discharge of conditions 3 (External Materials), 4 (Slab Levels), 6 (Vehicle Access) and 7 (Vehicle Parking) from previous application S/HOU/26/0193 for the proposed demolition of existing shed, erection of garage/workshop and new vehicular access and driveway.

    Received 18 Aug, published by the council 2 Sep 2026 Conditions
  • S/COND/26/1155 Granted

    Land North Of Blackworth Blackworth Industrial Estate Highworth Swindon SN6 7NA

    Discharge of Condition (20) Landscape Management and Maintenance Plan, from previous application S/OUT/26/0009.

    Received 15 Sep, published by the council 24 Sep 2026 Conditions
  • S/COND/26/1124 Granted

    Spectrum Building Mead Way Swindon SN15 7UT

    Discharge of Condition 3 - Level 3 Recording of Northern Elevation from previous application S/LBC/26/0037.

    Received 8 Sep, published by the council 17 Sep 2026 Conditions
  • S/COND/26/0920 Granted

    Land Adjacent To Chacewater The Pitchens Wroughton Swindon SN4 0RU

    Discharge of Conditions 3, 11, 14, 15 (part discharge) and 18 from Planning Application S/24/0435 -Change of use of existing buildings (Sui Generis) with first floor extension to form 1no. dwelling (Class C3).

    Received 20 Jul, published by the council 16 Aug 2026 Conditions
  • S/COND/26/0899 Granted

    Farm Buildings At Eastrop Farm Shrivenham Road Highworth Swindon SN6 7QQ

    Discharge of condition 7 (landscaping) from previous application S/25/0266 - Erection of attached and detached garages/car barns, track access and associated works.

    Received 15 Jul, published by the council 26 Jul 2026 Conditions