Planning application
36 Woodville Road Mumbles Swansea SA3 4AD
Works: Extension Loft or dormer Roofing Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Replacement roof structure with roof lights and fenestration alterations to existing single storey rear extensions - Non Material Amendment to planning permission 2023/2287/FUL granted 18th January 2024 to allow for the use of aluminium sliding doors and windows to the rear ground floor extension (in lieu of the approved uPVC door and window) and a change of window material to first floor rear windows to timber.
As published by the council, reference 2026/1143/NMA
Application record
- Reference
- 2026/1143/NMA
- Type
- Non Material Amendment
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 9 Jul 2026
- Validated
- 9 Jul 2026
- Decided
- 2 Sep 2026
- Ward
- Mumbles - Area 2
- Parish
- Mumbles Community Council
- Decision by
- Delegated Decision
- Postcode
- SA3 4AD
Site history
Applications at this address on the Swansea register
This site has had 4 applications since 2026: 2 approved, 0 refused.
-
2026/1416/FUL Awaiting decision
36 Woodville Road Mumbles Swansea SA3 4AD
Rear dormer extension, front roof lights, and alterations to single storey rear extension roof and fenestration (previously approved).
-
2026/1154/PRE Decided
36 Woodville Road Mumbles Swansea SA3 4AD
Pre-application enquiry - Roof dormer extension
-
2026/1142/PLD Granted
36 Woodville Road Mumbles Swansea SA3 4AD
Enlargement of rear patio with new side and rear retaining walls and access steps to upper garden area (application for a Certiticate of Proposed Lawful Development)
Timeline
Dates from the published record
-
9 Jul 2026
Received by Swansea
-
28 Jul 2026
Added to PlanIndex
-
2 Sep 2026
Decision issued: Approve
Who's behind it
Company information only, from the register and Companies House
Rewbridge Design Ltd Agent, a design practice registered in Swansea
Active · incorporated 2025 · Swansea
54 applications on PlanIndex · 87% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
- FINAL OFFICER REPORT
- FINAL NMA LETTER
- FINAL DECISION NOTICE VERSION 2
- PROPOSED FLOOR PLANS AND ELEVATIONS
- PROPOSED FLOOR PLANS AND ELEVATIONS
- APPLICATIONFORMREDACTED
- SITE LOCATION AND BLOCK PLANS
- PROPOSED FLOOR PLANS AND ELEVATIONS
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Swansea granted permission on 2 September 2026, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
36 Woodville Road Mumbles Swansea SA3 4AD
84% historically approved · decision due ~23 Oct
Rear dormer extension, front roof lights, and alterations to single storey rear extension roof and fenestration (previously approved).
Awaiting decision Full applications Extension Loft or dormer +1 8 docsSmall domestic -
36 Woodville Road Mumbles Swansea SA3 4AD
Pre-application enquiry - Roof dormer extension
Decided Other Extension Loft or dormer 8 docs -
36 Woodville Road Mumbles Swansea SA3 4AD
Enlargement of rear patio with new side and rear retaining walls and access steps to upper garden area (application for a Certiticate of Proposed Lawful Development)
Granted Lawful development 8 docs -
20 Woodville Road Mumbles Swansea SA3 4AD
Replacement of the existing rear rooflight and addition of two rooflights in the front roof plane
Granted Full applications Loft or dormer 13 docs -
29 Oakland Road Mumbles Swansea SA3 4AH
Widening of existing rear dormer roof extension, front roof light and change of use of detached garage to ancillary living accommodation for family member
Granted Full applications Extension Loft or dormer 12 docs -
29 Oakland Road Mumbles Swansea SA3 4AH
Pre-application enquiry - Widening of existing rear dormer roof extension, front roof light and change of use of detached garage to ancillary living accommodation for family member.
Decided Other Extension Loft or dormer 7 docs
Other amendment applications
In Swansea
-
2026/1308/TEM Granted
Field 0005 Bank Farm Horton Swansea SA3 1LL
Use of land for a camping and caravanning rally for a maximum 150 units from 17th September to 20th September 2027 (inclusive)
-
2026/1391/TEM Granted
Field 0818 E Richards & Co Ltd Bank Farm Leisure Horton Swansea SA3 1LL
Use of land for a caravan rally for a maximum of 35 units from 23rd July 2027 to 7th August 2027 (inclusive)
-
2026/1133/S73 Granted
72 Lon Mafon Sketty Swansea SA2 9ER
Construction of single storey rear extension (Variation of condition 2 of planning permission 2025/2561/FUL granted 23rd January 2026) to amend the plans
-
2026/1364/NMA Granted
21 Bryn Road Loughor Swansea SA4 6PG
Detached dwelling (Non Material amendment to planning permission 2019/2695/FUL granted 27th February 2020) for alterations to the elevations by adding / removing windows and altering external door designs.
-
2026/1632/NMA Awaiting decision
Former Smelting Shed Phoebe Road Pentrechwyth Swansea SA1 7FY
Conversion of former smelting shed to 12 residential apartments, including insertion of new first floor and part second floor, external alterations, car parking, refuse/cycle storage and link to riverside walkway - Variation condtion 2 of planning permission 2017/2646/FUL granted 21st September 2018 (as amended by planning permission 2023/1517/S73 granted 3rd November 2023) to allow for amendment to the approved parking scheme - Non Material Amendment to planning permission 2024/0116/S73 granted 23rd September 2024 to amend the wording of condition 9 to enable works to commence on the interior of the building, while site investigation into land contamination can be carried out