Planning application
Land Off Gower View Road And North Of Brynafon Road Penyrheol Swansea
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Re-discharge of condition 5 (materials) of planning permission 2019/0911/S73 granted 8th October 2019
As published by the council, reference 2024/1405/DOC
Application record
- Reference
- 2024/1405/DOC
- Type
- Discharge of Conditions
- Status
- Decided
- Decision
- Approve
- Received
- 19 Jul 2024
- Validated
- 27 Aug 2024
- Decided
- 25 Sep 2024
- Ward
- Gorseinon And Penyrheol - Area 1
- Parish
- Gorseinon Town Council
- Decision by
- Delegated Decision
Site history
Applications at this address on the Swansea register
This site has had 3 applications since 2024: 2 approved, 0 refused.
-
2026/0455/NMA Awaiting decision
Land Off Gower View Road And North Of Brynafon Road Penyrheol Swansea
Construction of 144 residential dwellings and associated works (Reserved Matters application following 2019/0911/S73 granted 13th September 2019 and outline 2005/2355 granted 23rd April 2010) (Non Material amendment to planning perrmission 2019/2144/Ful granted 12th December 2019) to amend the approved plans listed in Condition 1
-
2025/2649/DOC Granted
Land Off Gower View Road And North Of Brynafon Road Penyrheol Swansea
Re-discharge of condition 5 (external finishes) of planning permission 2019/0911/S73 approved 2nd July 2019
Timeline
Dates from the published record
-
19 Jul 2024
Received by Swansea
-
27 Aug 2024
Validated
Checked as complete and ready for consideration.
-
25 Sep 2024
Decision issued: Approve
-
27 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Bridgend
859 applications on PlanIndex · across 21 councils · 97% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Swansea granted permission on 25 September 2024, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land West Of Gower View Road And North Of Brynafon Road Penyrheol Swansea
Discharge of conditions 4 (Phasing) and 19 (Japanese Knotweed) of planning permission 2019/0911/S73 approved 8th October 2019
Granted Conditions 7 docs -
Land Off Gower View Road And North Of Brynafon Road Penyrheol Swansea
Re-discharge of condition 5 (external finishes) of planning permission 2019/0911/S73 approved 2nd July 2019
Granted Conditions 5 docs -
Land West Of Gower View Road And North Of Brynafon Road Penyrheol Swansea
Construction of 144 residential dwellings and associated works (Reserved Matters application following 2019/0911/S73 granted 13th September 2019 and outline 2005/2355 granted 23rd April 2010) (Non Material Amendment to planning permission 2019/2144/RES granted 12th December 2019) to vary the wording on Condition 4
Granted Amendments 5 docs -
Land West Of Gower View Road And North Of Brynafon Road Penyrheol Swansea
Residential development incorporating public open space and new access roads from Gower View Road and Brynafon Road (outline) (Variation of conditions 1, 3 and 4 of planning permission 2005/2355 granted 23rd April 2010) to extend the time period for the submission of Reserved Matters on the remaining site area in accordance with the revised Design and Access Statement and Masterplan (Non Material Amendment to planning permission 2019/0911/S73 granted 2nd July 2019) to vary the wording on Condition 10, 11 and 17
Granted Amendments New dwelling 6 docs -
Land West Of Gower View Road And North Of Brynafon Road Penyrheol Swansea
Discharge of conditions 15 (Affordable Housing Scheme) and 25 (Training and employment scheme) of planning permission 2019/0911/S73 approved 8th October 2019
Granted Conditions 10 docs -
Land West Of Gower View Road And North Of Brynafon Road Penyrheol Swansea
Discharge of conditions 13 (Foul Drainage), 14 (Surface Water) and 18 (Potable Water supply) of planning permission 2019/0911/S73 approved 8th October 2019
Granted Conditions 16 docs
Other condition discharge and variation applications
In Swansea
-
2026/1443/DOC Awaiting decision
6-37 Cambrian Place Swansea SA1 1RG
Repair, refurbishment and retrofitting - Discharge condition 12 (details of reinstated internal features) of Listed Building Consent 2025/1485/S99 granted 17th October 2025
-
2026/1444/DOC Awaiting decision
6-37 Cambrian Place Swansea SA1 1RG
Repair, refurbishment and retrofitting - Discharge condition 6 (Front elevation doors - method statement) of Listed Building Consent 2025/1485/S99 granted 17th October 2025
-
2026/1228/DOC Granted
52 Caswell Road Caswell Swansea SA3 4SD
Discharge of Conditions 3 (Materials), 4 (Boundary treatments) and 6 (privacy screen) of Planning Permission 2025/0572/FUL granted 27th October 2025
-
2026/1418/DOC Awaiting decision
106 Martin Street Morriston Swansea SA6 7BL
Discharge of condition 4 (Landscaping), condition 5 (Materials), condition 6 (Construction Method Statement), condition 7 (Large scale details), condition 11 (Solar PV Details) of planning permission 2025/2492/FUL granted 2nd March 2026
-
2026/1406/DOC Awaiting decision
Land North Of Garden Village Swansea
Discharge of condition 13 (surface water removal strategy) of planning permission 2016/1478 granted 12th December 2019 (to re-apportion Phase 1 MOU betterment to Phase 2)