Planning application
Land At The North Of Parc Tawe Swansea
Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.
Proposal
Construction of fast food outlet (Class A3), incorporating drive through facility and associated works
As published by the council, reference 2023/0093/FUL
Application record
- Reference
- 2023/0093/FUL
- Type
- Full Plans
- Status
- Decided
- Decision
- Refuse
- Received
- 13 Jan 2023
- Validated
- 13 Jan 2023
- Decided
- 31 Mar 2023
- Ward
- Castle - Bay Area
- Decision by
- Delegated Officer Panel
Timeline
Dates from the published record
-
13 Jan 2023
Received by Swansea
-
31 Mar 2023
Decision issued: Refuse
-
14 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, a planning consultancy registered in Cardiff
137 applications on PlanIndex · across 14 councils · 87% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
48 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Parc Tawe Ph 1 S Car Park Parc Tawe Swansea
Construction of a drive thru restaurant (Class A3), alterations to retail park car park, installation of EV charging points, associated infrastructure and landscaping works, - Non Material Amendment of planning permission 2024/1043/FUL granted 22nd November 2024 to allow the relocation of approved customer entrance door in west facing elevation of drive-thru restaurant
Granted Amendments 9 docs -
Parc Tawe Ph 1 S Car Park Parc Tawe Swansea
Construction of a drive thru restaurant (Class A3) and alterations to Retail Park car park - Non Material Amendment of planning permission 2024/1043/FUL granted 22nd November 2024 to amend the wording of Conditions 4 (Details of proposed external surfaces) and Condition 8 (refuse store) to allow the development to be carried out in accordance with the submitted details.
Granted Amendments 16 docs -
Land Within Parc Tawe Retail Park A4067 Quay Parade, Swansea SA1 2AL
Construction of a drive thru restaurant (Class A3), alterations to Retail Park car park, installation of EV Charging points, associated infrastructure and landscaping works
Granted Full applications 40 docs -
Unit 7 Parc Tawe North Quay Parade Swansea SA1 2AL
Change of Use from retail (Class A1) to financial and professional services (Class A2)
Granted Full applications 10 docs -
Parc Tawe Quay Parade Swansea SA1 2AL
New ingress only access road from Quay Parade into Parc Tawe Retail Park and associated works - Discharge of conditions 3 (full details of the proposed access works) and 4 (landscaping) of planning permission 2020/2020/FUL granted 2nd February 2021
Granted Conditions 17 docs -
Parc Tawe Ph 1 Car Park Parc Tawe Swansea SA1 2AL
Parc Tawe Retail Refurbishment - Discharge of condition 23 (Car Parking Management Plan) of planning permission 2018/0413/S73 granted 3rd May 2018
Granted Conditions 9 docs
Other full applications applications
In Swansea
-
2026/1202/FUL Granted
30 Ladysmith Road Treboeth Swansea SA5 9DL
Single story rear extension
-
2026/1123/FUL Granted
69 Lan Coed Winch Wen Swansea SA1 7LR
Single storey rear extension
-
2026/1437/FUL Awaiting decision
Plasmarl House 331-332 Neath Road Plasmarl Swansea SA6 8JU
Change of use from existing residential/institutional use to a House in Multiple Occupation (Unique Use) for up to 13 persons
-
2026/1088/FUL Granted
Car Park Outside Unit 6 St Johns Court Upper Fforest Way Swansea Enterprise Park Swansea SA6 8QQ
Retention of burger van
-
2025/2351/FUL Granted
The Gravel Works Bridge Road Waunarlwydd Swansea SA5 4SP
Use of land for the siting of self-storage containers