Planning application

Twizzle Lodge Hawthorne Avenue Uplands Swansea SA2 0LP

Granted Swansea 2022/1839/DOC Discharge of Conditions

Works: Windows or glazing

Relates to 2018/0661/FUL

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Discharge of conditions 4 (Cycle and Refuse Storage) and 6 (Operational Management Plan) and 7 (Details of Windows) of planning permission 2018/0661/FUL granted 7th June 2018

As published by the council, reference 2022/1839/DOC

Application record

Reference
2022/1839/DOC
Type
Discharge of Conditions
Status
Decided
Decision
Approve
Received
1 Aug 2022
Validated
28 Nov 2022
Decided
27 Feb 2023
Ward
Uplands - Bay Area
Decision by
Delegated Decision
Postcode
SA2 0LP

Site history

Applications at this address on the Swansea register

This site has had 2 applications since 2018: 2 approved, 0 refused.

  • 2018/0661/FUL Granted

    Twizzle Lodge Hawthorne Avenue Uplands Swansea SA2 0LP

    Conversion of existing building to provide 8 no. student residential units, addition of 2 front rooflights, 3 rear rooflights and alterations to fenestration

    Decided 7 Jun 2018 Full applications

Timeline

Dates from the published record

  1. 1 Aug 2022

    Received by Swansea

  2. 28 Nov 2022

    Validated

    Checked as complete and ready for consideration.

  3. 27 Feb 2023

    Decision issued: Approve

  4. 27 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 2018/0661/FUL Granted

    Twizzle Lodge Hawthorne Avenue Uplands Swansea SA2 0LP

    Conversion of existing building to provide 8 no. student residential units, addition of 2 front rooflights, 3 rear rooflights and alterations to fenestration

    Decided 7 Jun 2018 Full applications

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Swansea granted permission on 27 February 2023, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Swansea

  • 2026/1443/DOC Awaiting decision

    6-37 Cambrian Place Swansea SA1 1RG

    Repair, refurbishment and retrofitting - Discharge condition 12 (details of reinstated internal features) of Listed Building Consent 2025/1485/S99 granted 17th October 2025

    3 Sep 2026 Conditions
  • 2026/1444/DOC Awaiting decision

    6-37 Cambrian Place Swansea SA1 1RG

    Repair, refurbishment and retrofitting - Discharge condition 6 (Front elevation doors - method statement) of Listed Building Consent 2025/1485/S99 granted 17th October 2025

    3 Sep 2026 Conditions
  • 2026/1228/DOC Granted

    52 Caswell Road Caswell Swansea SA3 4SD

    Discharge of Conditions 3 (Materials), 4 (Boundary treatments) and 6 (privacy screen) of Planning Permission 2025/0572/FUL granted 27th October 2025

    24 Jul 2026 Conditions
  • 2026/1418/DOC Awaiting decision

    106 Martin Street Morriston Swansea SA6 7BL

    Discharge of condition 4 (Landscaping), condition 5 (Materials), condition 6 (Construction Method Statement), condition 7 (Large scale details), condition 11 (Solar PV Details) of planning permission 2025/2492/FUL granted 2nd March 2026

    28 Aug 2026 Conditions
  • 2026/1406/DOC Awaiting decision

    Land North Of Garden Village Swansea

    Discharge of condition 13 (surface water removal strategy) of planning permission 2016/1478 granted 12th December 2019 (to re-apportion Phase 1 MOU betterment to Phase 2)

    27 Aug 2026 Conditions