Planning application
Tidal Basin Kings Road SA1 Waterfront SA1 8QT
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Construction of surface car parking and all associated development
As published by the council, reference 2022/1150/FUL
Application record
- Reference
- 2022/1150/FUL
- Type
- Full Plans
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 13 May 2022
- Validated
- 31 May 2022
- Decided
- 20 Mar 2023
- Ward
- Waterfront - Bay Area
- Decision by
- Delegated Officer Panel
- Postcode
- SA1 8QT
Timeline
Dates from the published record
-
13 May 2022
Received by Swansea
-
31 May 2022
Validated
Checked as complete and ready for consideration.
-
20 Mar 2023
Decision issued: Approve
-
14 Aug 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
1 later application on the register refers to this one:
-
2025/1777/DOC Granted
Tidal Basin Kings Road SA1 Waterfront Swansea SA1 8QT
Construction of surface car parking and all associated development - Discharge of Condition 6 (Car Parking Management Plan) - Tidal Basin General Arrangement) of Planning Permission 2022/1150/FUL granted 31st May 2022
Who's behind it
Company information only, from the register and Companies House
Tetra Tech Ltd Agent, registered in Leeds
Active · incorporated 1985 · Leeds
181 applications on PlanIndex · across 86 councils · 95% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
24 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Swansea granted permission on 20 March 2023, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Tidal Basin Kings Road SA1 Waterfront Swansea SA1 8QT
Construction of surface car parking and all associated development - Discharge of Condition 6 (Car Parking Management Plan) - Tidal Basin General Arrangement) of Planning Permission 2022/1150/FUL granted 31st May 2022
Granted Conditions 9 docs -
Land At Tidal Basin Kings Road, Sa1 Waterfront Swansea SA1 8EW
Construction of a permanent surface level car park and all associated development
Granted Full applications 14 docs -
Plots PD, PL & PN Land South Of Fabian Way And East Of River Tawe Swansea
Construction Wales Innovation Centre -Discharge of condition 8 (Car Parking) of planning permission 2016/3469/RES approved 13th February 2017
Granted Conditions 9 docs -
Plots Pd, Pl And Pn Land South Of Fabian Way And East Of River Tawe Swansea
Construction Wales Innovation Centre -Discharge of conditions 4 (details of ground floor glazed frontages) and 7 (cycle storage and refuse storage) of planning permission 2016/3469/RES granted 13th February 2017
Granted Conditions Windows or glazing 11 docs -
Plots PD, PL And PN Land South Of Fabian Way And East Of River Tawe Swansea
Construction of new Library and Faculty of Architecture, Computing and Engineering (FACE) & Technology Building - Discharge of condition 11 (car parking facilities) of planning permission 2016/0921 granted 19th July 2016
Granted Conditions 10 docs -
Plots PD, PL And PN Land South Of Fabian Way And East Of River Tawe Swansea Street Record Fabian Way Port Tennant Swansea
Construction of new Library and Faculty of Architecture, Computing and Engineering (FACE) & Technology Building for UWTSD -Discharge of conditions 6 (cycle / refuse storage) and 10 (active frontage) of planning permission 2016/0921 granted 19th July 2016
Granted Conditions 11 docs
Other full applications
In Swansea
-
2025/2677/FUL Granted
Cwm Cilau Fach Farm Salem Morriston Swansea SA6 6PF
Remove existing two-storey extension and construct a two-storey rear extension and a single-storey side extension.
-
2026/1398/FUL Granted
Land Lying On The West Side Of Kite Hill Llanmadoc Swansea SA3 1BU
Construction of a small, purpose-built bat roost structure
-
2026/1313/FUL Granted
17 Elba Street Gowerton Swansea SA4 3EE
Single storey extension to the rear of the dwelling, connecting to and incorporating the existing garage, together with conversion of the garage into habitable living accommodation. Installation of a bird box to the side elevation.
-
2026/1195/FUL Granted
27 Heol Cae Glas Llansamlet Swansea SA7 9XD
Retention and completion of raised patio by 65cms for access and a 1.8m fence
-
2026/1329/FUL Granted
Pleasant View Stones Field Penmaen Swansea SA3 2HQ
Proposed replacement dwelling with associated landscaping (amendment to planning permission 2025/2422/FUL dated 28th May 2026)