Planning application
Land Off Milford Way/Colliers Way Penlan Swansea SA5 7DQ
Relates to 2018/2609/FUL
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Discharge of conditions 3 (drainage) of planning permission 2018/2609/FUL granted 8th February 2019
As published by the council, reference 2019/1463/DOC
Application record
- Reference
- 2019/1463/DOC
- Type
- Discharge of Conditions
- Status
- Decided
- Decision
- Approve
- Received
- 24 Jun 2019
- Validated
- 24 Jun 2019
- Decided
- 7 Aug 2019
- Ward
- Penderry - Area 1
- Decision by
- Delegated Decision
- Postcode
- SA5 7DQ
Site history
Applications at this address on the Swansea register
This site has had 4 applications since 2018: 4 approved, 0 refused.
-
2020/0730/S73 Granted
Land Off Milford Way/Colliers Way Penlan Swansea SA5 7DQ
Construction of 18 no. dwellings with a mix of 1 bed apartments, 2, 3 and 4 bed semi detached dwellings, with associated hard and soft landscaping (Variation of conditions 2 (revised drawings) and 8 (external surfaces of the development to include Cedral composite, wood grain, cladding board system) and discharge of conditions 3 (drainage), 7 (engineering details), 10 (lighting) & 11 (CEMP)) of planning permission 2018/2609/FUL granted 21st February 2019
-
2019/2668/NMA Granted
Land Off Milford Way/Colliers Way Penlan Swansea SA5 7DQ
Non Material Amendment to planning permission 2018/2609/FUL granted 19th December 2018 to amend condition 4 (Surface water) from pre-commencement to pre-occupation and submission of supporting drainage information
-
2018/2609/FUL Granted
Land Off Milford Way/Colliers Way Penlan Swansea SA5 7DQ
Construction of 18 no. dwellings with a mix of 1 bed apartments, 2, 3 and 4 bed semi detached dwellings, with associated hard and soft landscaping
Timeline
Dates from the published record
-
24 Jun 2019
Received by Swansea
-
7 Aug 2019
Decision issued: Approve
-
9 Sep 2026
Added to PlanIndex
Related applications
Cases linked to this one on the register
-
2018/2609/FUL Granted
Land Off Milford Way/Colliers Way Penlan Swansea SA5 7DQ
Construction of 18 no. dwellings with a mix of 1 bed apartments, 2, 3 and 4 bed semi detached dwellings, with associated hard and soft landscaping
Who's behind it
Company information only, from the register and Companies House
Agent on file
99 applications on PlanIndex · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
24 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Swansea granted permission on 7 August 2019, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land Off Milford Way/Colliers Way Penlan Swansea SA5 7DQ
Non Material Amendment to planning permission 2018/2609/FUL granted 19th December 2018 to amend condition 4 (Surface water) from pre-commencement to pre-occupation and submission of supporting drainage information
Granted Amendments 5 docs -
Land Off Milford Way/Colliers Way Penlan Swansea SA5 7DQ
Construction of 18 no. dwellings with a mix of 1 bed apartments, 2, 3 and 4 bed semi detached dwellings, with associated hard and soft landscaping
Granted Full applications New dwelling 42 docsMajor scheme -
Land Off Milford Way/Colliers Way Penlan Swansea SA5 7DQ
Construction of 18 no. dwellings with a mix of 1 bed apartments, 2, 3 and 4 bed semi detached dwellings, with associated hard and soft landscaping (Variation of conditions 2 (revised drawings) and 8 (external surfaces of the development to include Cedral composite, wood grain, cladding board system) and discharge of conditions 3 (drainage), 7 (engineering details), 10 (lighting) & 11 (CEMP)) of planning permission 2018/2609/FUL granted 21st February 2019
Granted Amendments New dwelling 59 docsMajor scheme -
12 Newgale Close Penlan Swansea SA5 7JZ
Discharge of condition 1 (External materials) of planning permission 2025/0830/FUL granted under Appeal ref: CAS-04409-B1W0D2 on 6th November 2025
Granted Conditions 7 docs -
12 Newgale Close Penlan Swansea SA5 7JZ
Single storey rear extension
Granted Full applications Extension 10 docsSmall domestic -
8 Newgale Close Penlan Swansea SA5 7JZ
Single storey rear extension
Granted Full applications Extension 10 docsSmall domestic
Other condition discharge and variation applications
In Swansea
-
2026/1443/DOC Awaiting decision
6-37 Cambrian Place Swansea SA1 1RG
Repair, refurbishment and retrofitting - Discharge condition 12 (details of reinstated internal features) of Listed Building Consent 2025/1485/S99 granted 17th October 2025
-
2026/1444/DOC Awaiting decision
6-37 Cambrian Place Swansea SA1 1RG
Repair, refurbishment and retrofitting - Discharge condition 6 (Front elevation doors - method statement) of Listed Building Consent 2025/1485/S99 granted 17th October 2025
-
2026/1228/DOC Granted
52 Caswell Road Caswell Swansea SA3 4SD
Discharge of Conditions 3 (Materials), 4 (Boundary treatments) and 6 (privacy screen) of Planning Permission 2025/0572/FUL granted 27th October 2025
-
2026/1418/DOC Awaiting decision
106 Martin Street Morriston Swansea SA6 7BL
Discharge of condition 4 (Landscaping), condition 5 (Materials), condition 6 (Construction Method Statement), condition 7 (Large scale details), condition 11 (Solar PV Details) of planning permission 2025/2492/FUL granted 2nd March 2026
-
2026/1406/DOC Awaiting decision
Land North Of Garden Village Swansea
Discharge of condition 13 (surface water removal strategy) of planning permission 2016/1478 granted 12th December 2019 (to re-apportion Phase 1 MOU betterment to Phase 2)