Planning application
Plot D7A Off Langdon Road Swansea Waterfront Swansea SA1 8RB
Works: New dwelling Major scheme
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Residential development of 19 new dwellings with associated works - Non Material Amendment to planning permission 2017/0146/FUL granted 15th September 2017 to omit the third floor balconies from plots 1 - 5
As published by the council, reference 2019/1460/NMA
Application record
- Reference
- 2019/1460/NMA
- Type
- Non Material Amendment
- Status
- Decided
- Decision
- Granted As published: Approve
- Received
- 21 Jun 2019
- Validated
- 25 Jul 2019
- Decided
- 19 Sep 2019
- Ward
- St. Thomas - Bay Area
- Decision by
- Delegated Decision
- Postcode
- SA1 8RB
Site history
Applications at this address on the Swansea register
This site has had 3 applications since 2018: 3 approved, 0 refused.
-
2019/1479/106 Granted
Plot D7A Off Langdon Road Swansea Waterfront Swansea SA1 8RB
Modification of Section 106 agreement of planning permission 2017/0146/FUL dated 15th September 2017 to exclude a mortgagee in possession (of a RSL) from enforceability of the obligations
-
2018/1463/DOC Granted
Plot D7A Off Langdon Road Swansea Waterfront Swansea SA1 8RB
Residential Development - Discharge of conditions 5 (external finishes), 6 (building details) and 8 (landscaping) of planning permission 2017/0146/FUL granted 15th September 2017
Timeline
Dates from the published record
-
21 Jun 2019
Received by Swansea
-
25 Jul 2019
Validated
Checked as complete and ready for consideration.
-
19 Sep 2019
Decision issued: Approve
-
9 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Hammond Architects Ltd Agent, an architecture practice
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Swansea granted permission on 19 September 2019, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Plot D7A Off Langdon Road Swansea Waterfront Swansea SA1 8RB
Modification of Section 106 agreement of planning permission 2017/0146/FUL dated 15th September 2017 to exclude a mortgagee in possession (of a RSL) from enforceability of the obligations
Granted Conditions 8 docs -
35 Yr Hafan Swansea Docks Swansea SA1 8RD
Front and side 1.8m high boundary wall with entrance gate
Refused Full applications 6 docsSmall domestic -
Coastal Housing Sites D8 And E1 Langdon Road Swansea Docks Swansea
Residential Development - Discharge of condition 22 (Travel Plan) of planning permission 2015/0030 granted 2/10/2015
Granted Conditions New dwelling 9 docs -
Plots D8 & E1 Langdon Road Swansea
Residential Development - Discharge of condition 9 (verification report demonstrating completion of the works set out in the approved remediation strategy) of planning permission 2015/0030 granted 2nd October 2015
Granted Conditions New dwelling 9 docs -
Plot D9b Langdon Road Sa1 Swansea SA1 8RD
Construction of 26 Residential Affordable Common Access Apartments in a mix of 2B3P, 2B4P and 3B5P Duplex Units, Landscaping, Access, and Associated Works - Discharge of conditions 4 (Ecological Enhancement Measures and an Implementation Timetable), 5 (Detailed Scheme of Landscaping) and 8 (a Construction Method Statement) of planning permission 2022/1137/RES granted 12th May 2025
Granted Conditions New dwelling 15 docs -
Plot D9b Swansea Waterfront SA1 8RD
98% historically approved · decision due ~3 Nov
Discharge of condition 2 (External Finishes) of Planning Permission 2022/1137/RES granted 12th May 2025
Awaiting decision Conditions 5 docs
Other amendment applications
In Swansea
-
2026/1308/TEM Granted
Field 0005 Bank Farm Horton Swansea SA3 1LL
Use of land for a camping and caravanning rally for a maximum 150 units from 17th September to 20th September 2027 (inclusive)
-
2026/1391/TEM Granted
Field 0818 E Richards & Co Ltd Bank Farm Leisure Horton Swansea SA3 1LL
Use of land for a caravan rally for a maximum of 35 units from 23rd July 2027 to 7th August 2027 (inclusive)
-
2026/1133/S73 Granted
72 Lon Mafon Sketty Swansea SA2 9ER
Construction of single storey rear extension (Variation of condition 2 of planning permission 2025/2561/FUL granted 23rd January 2026) to amend the plans
-
2026/1364/NMA Granted
21 Bryn Road Loughor Swansea SA4 6PG
Detached dwelling (Non Material amendment to planning permission 2019/2695/FUL granted 27th February 2020) for alterations to the elevations by adding / removing windows and altering external door designs.
-
2026/1632/NMA Awaiting decision
Former Smelting Shed Phoebe Road Pentrechwyth Swansea SA1 7FY
Conversion of former smelting shed to 12 residential apartments, including insertion of new first floor and part second floor, external alterations, car parking, refuse/cycle storage and link to riverside walkway - Variation condtion 2 of planning permission 2017/2646/FUL granted 21st September 2018 (as amended by planning permission 2023/1517/S73 granted 3rd November 2023) to allow for amendment to the approved parking scheme - Non Material Amendment to planning permission 2024/0116/S73 granted 23rd September 2024 to amend the wording of condition 9 to enable works to commence on the interior of the building, while site investigation into land contamination can be carried out