Skip to content
PlanIndex Get alerts
Menu

Planning application

Plot 2 Pennard Road Pennard Swansea SA3 2AJ

Granted Swansea 2019/0799/DOC Discharge of Conditions

Works: New dwelling Domestic

Read from the description, not a valuation. How we read the register

Relates to 2018/0711/FUL

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Discharge of conditions 3 (external finishes), 4 (landscaping) & 5 (boundary treatment) of Planning Permission 2018/0711/FUL for a detached dwelling granted on Appeal on 20th December 2018.

As published by the council, reference 2019/0799/DOC

Application record

Reference
2019/0799/DOC
Type
Discharge of Conditions
Status
Decided
Decision
Granted As published: Approve
Received
5 Apr 2019
Validated
12 Apr 2019
Decided
6 Jun 2019
Ward
Pennard - Area 2
Decision by
Delegated Decision
Postcode
SA3 2AJ

Timeline

Dates from the published record

  1. 5 Apr 2019

    Received by Swansea

  2. 12 Apr 2019

    Validated

    Checked as complete and ready for consideration.

  3. 6 Jun 2019

    Decision issued: Approve

  4. 13 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 2018/0711/FUL Refused

    Former 77A Pennard Road Pennard Road Pennard Swansea

    Detached dwelling

    Decided 13 Sep 2018 Full applications

Who's behind it

Company information only, from the register and Companies House

J.A. Rewbridge Development Services Agent, a developer registered in Cardiff

Active · incorporated 2015 · Cardiff

243 applications on PlanIndex · across 2 councils · 84% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Swansea granted permission on 6 June 2019, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Former 77A Pennard Road Pennard Road Pennard Swansea

    2018/0711/FUL Submitted 22 Mar 2018 0.1 miles away

    Detached dwelling

    Refused Full applications New dwelling 26 docs
    Domestic
  • 1 Southgate Road Southgate Swansea SA3 2BT

    2018/2381/PLD Submitted 7 Nov 2018 0.1 miles away

    Conversion of attached garage and shower room into bedroom and shower room with associated external alterations and addition of 4 rooflights to the front elevation (application for a Certificate of Proposed Lawful Development)

    Refused Lawful development Loft or dormer 15 docs
  • 1 Southgate Road Southgate Swansea SA3 2BT

    2019/0150/FUL Submitted 22 Jan 2019 0.1 miles away

    Addition of 4 rooflights to the front elevation

    Granted Full applications Loft or dormer 13 docs
  • 25 Burrows Close Southgate Swansea SA3 2AH

    2018/1817/FUL Submitted 20 Aug 2018 0.1 miles away

    Two front dormers, installation of one roof light to the front elevation and two roof lights to the rear elevation

    Granted Full applications Loft or dormer 10 docs
  • 1 Bendrick Drive Southgate Swansea SA3 2AL

    2020/0863/FUL Submitted 13 May 2020 0.1 miles away

    Single storey side extension

    Granted Full applications Extension 6 docs
    Small domestic
  • 67 Pennard Road Pennard Swansea SA3 2AJ

    2019/2530/FUL Submitted 4 Nov 2019 0.1 miles away

    Detached garage with first floor living accommodation

    Refused Full applications 7 docs

In Swansea

  • 2026/1480/DOC Awaiting decision

    Development Zone 2B Oystermouth Road Swansea SA1 3LG

    Construction of mixed / office block - Partial Discharge of Condition 24 (Details of confirmed Archaeologist) of planning permission 2024/0164/S73 granted 11th June 2024 in respect of Block B

    Received 8 Sep, published by the council 11 Sep 2026 Conditions
  • 2026/1352/DOC Granted

    Clyn Cwm Gwyn Riding Centre Clyn Cwm Gwyn Killay Swansea SA2 7AQ

    Discharge of Conditions 4 (Sensitive lighting strategy), 5 (Construction Environmental Management Plan), 6 (Invasive Non-Native Species Management Plan), 8 (scheme of landscaping) of planning permission 2026/0046/ful approved 13th July 2026

    Received 17 Aug, published by the council 25 Aug 2026 Conditions
  • 2026/1474/DOC Awaiting decision

    Parc Tawe Ph 1 S Car Park Swansea SA1 2AL

    Construction of a drive thru restaurant (Class A3), alterations to Retail Park car park, installation of EV Charging points, associated infrastructure and landscaping works - Discharge of part of condition 8 (Refuse Management Plan) of planning permission 2024/1043/FUL granted 22nd November 2024

    Received 7 Sep, published by the council 11 Sep 2026 Conditions
  • 2026/0541/DOC Granted

    Former Smelting Building Phoebe Road Copper Quarter Swansea

    Discharge of conditions 3 (scheme of historic environment mitigation), 4 (proposed internal construction), 5 (Typical window, Typical external door, Canopy, rooflights, Typical roundel glazed / brickwork window), 6 (materials), 7 (methodology for masonry repairs), 8 (bat box) and 9 (external vents, pipes or flues) of planning permission 2023/1514/S19 approved 9th October 2023

    Received 1 Apr, published by the council 28 Jul 2026 Conditions
  • 2026/1467/DOC Awaiting decision

    Parc Tawe Ph 1 S Car Park Parc Tawe City Centre Swansea

    Construction of a drive thru restaurant (Class A3), alterations to Retail Park car park, installation of EV Charging points, associated infrastructure and landscaping works - Discharge of condition 11 (foul water drainage scheme) of planning permission 2024/1043/FUL granted 22nd November 2024

    Received 7 Sep, published by the council 11 Sep 2026 Conditions