Planning application
Bay Campus Fabian Way Jersey Marine Neath
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Section 73 application to vary conditions 3 and 4 (to allow an extension of time for the submission of the reserved matters in relation to the remaining phases of the development) of planning permission P2010/0222 for the erection of a university campus originally approved on the 31/08/12 (Referral from Neath Port Talbot Council)
As published by the council, reference 2018/1698/LPA
Application record
- Reference
- 2018/1698/LPA
- Type
- Neigh. Auth. Consultation
- Status
- Decided
- Decision
- No Objection
- Received
- 20 Aug 2018
- Validated
- 20 Aug 2018
- Decided
- 26 Sep 2018
- Ward
- St. Thomas - Bay Area
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
20 Aug 2018
Received by Swansea
-
26 Sep 2018
Decision issued: No Objection
-
17 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Swansea granted permission on 26 September 2018, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About outline applications
An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Swansea University Bay Campus Fabian Way Crymlyn Burrows Neath Port Talbot SA1 8EN
Variation of condition 1 of planning permission P2021/0129 (approved on 18/03/2021) to allow retention of the active classroom building for a further 2 years
Granted Full applications -
Swansea University Bay Campus Fabian Way Crymlyn Burrows SA1 8EN
Retention of existing two storey modular office facility (temporary 5 year planning permission P2017/1041 expired in December 2022).
Granted Full applications 6 docs -
Swansea University Bay Campus The Great Hall Fabian Way Crymlyn Burrows SA1 8QQ
100% historically approved · decision due ~8 May
Details submitted pursuant to discharge of condition 4 (testing of imported material) of planning permission P2022/0450 dated 13/12/2022 (for raising of site levels on undeveloped land)
Awaiting decision Conditions -
Unit 2. 2 Kings Dock Crymlyn Burrows Neath Port Talbot SA1 8QA
Alterations to eastern elevation to install 2 No HGV loading doors
Granted Full applications -
Swansea Gate Business Park / Bay Studios Business Park Fabian Way Crymlyn Burrows Swansea SA1 8QB
Certificate of Lawful Development (Proposed) for a new hydrogen electrolyser system sited within an existing workshop building
Decided Lawful development
Other outline applications
In Swansea
-
2026/1091/OUT Refused
43 Wimmerfield Crescent Killay Swansea SA2 7BU
Two storey terrace dwelling (outline).
-
2026/0828/SCR Decided
The Former Monksland Bar Monksland Road Swansea SA3 1AY
Screening Opinion for demolition of existing public house and creation of twenty one dwellings
-
2026/1328/SCO Awaiting decision
Land Adjacent To Fairwood Terrace Gowerton SA4 3AH
EIA SCOPING Consultation from PEDW. Proposed residential development of up to 216 dwellings with commercial/mixed uses (A1-A3, B1 and D1) at ground floor, a mobility hub, incorporating active travel routes, green infrastructure, drainage, play and associated works (outline).
-
2026/0821/OUT Awaiting decision
Whitewalls Three Crosses Swansea SA4 3US
Detached dwelling (Outline)
-
2026/0796/OUT Awaiting decision
Land To The Rear Of No 52 Bryn Road Waunarlwydd Swansea
Detached dormer bungalow (outline)