Skip to content
PlanIndex Get alerts
Menu

Planning application

58 Heol Eithrim Clydach Swansea SA6 5ES

Granted Swansea 2018/0680/NMA Non Material Amendment

Works: Extension Loft or dormer Windows or glazing

Permission granted. Work must normally begin within five years of the decision or the permission lapses.

Proposal

Non Material Amendment to planning permission 2012/0679 granted 12th June 2012 to allow for a flat roof, reduction in width, increase in length and addition of rear patio doors to side extension; removal of ground floor side windows and replacement with roof lights to ground floor rooms; increase in height of ground floor front extension (no overall increase in building height); reduction in width of front extension

As published by the council, reference 2018/0680/NMA

Application record

Reference
2018/0680/NMA
Type
Non Material Amendment
Status
Decided
Decision
Granted As published: Approve
Received
15 Mar 2018
Validated
26 Mar 2018
Decided
20 Apr 2018
Ward
Clydach - Area 1
Decision by
Delegated Decision
Postcode
SA6 5ES

Timeline

Dates from the published record

  1. 15 Mar 2018

    Received by Swansea

  2. 26 Mar 2018

    Validated

    Checked as complete and ready for consideration.

  3. 20 Apr 2018

    Decision issued: Approve

  4. 3 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Swansea granted permission on 20 April 2018, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.

About amendment applications

An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Swansea

  • 2026/1308/TEM Granted

    Field 0005 Bank Farm Horton Swansea SA3 1LL

    Use of land for a camping and caravanning rally for a maximum 150 units from 17th September to 20th September 2027 (inclusive)

    Received 10 Aug, published by the council 11 Sep 2026 Amendments
  • 2026/1391/TEM Granted

    Field 0818 E Richards & Co Ltd Bank Farm Leisure Horton Swansea SA3 1LL

    Use of land for a caravan rally for a maximum of 35 units from 23rd July 2027 to 7th August 2027 (inclusive)

    Received 25 Aug, published by the council 28 Aug 2026 Amendments
  • 2026/1133/S73 Granted

    72 Lon Mafon Sketty Swansea SA2 9ER

    Construction of single storey rear extension (Variation of condition 2 of planning permission 2025/2561/FUL granted 23rd January 2026) to amend the plans

    Received 8 Jul, published by the council 28 Jul 2026 Amendments
  • 2026/1364/NMA Granted

    21 Bryn Road Loughor Swansea SA4 6PG

    Detached dwelling (Non Material amendment to planning permission 2019/2695/FUL granted 27th February 2020) for alterations to the elevations by adding / removing windows and altering external door designs.

    Received 18 Aug, published by the council 3 Sep 2026 Amendments
  • 2026/1632/NMA Awaiting decision

    Former Smelting Shed Phoebe Road Pentrechwyth Swansea SA1 7FY

    Conversion of former smelting shed to 12 residential apartments, including insertion of new first floor and part second floor, external alterations, car parking, refuse/cycle storage and link to riverside walkway - Variation condtion 2 of planning permission 2017/2646/FUL granted 21st September 2018 (as amended by planning permission 2023/1517/S73 granted 3rd November 2023) to allow for amendment to the approved parking scheme - Non Material Amendment to planning permission 2024/0116/S73 granted 23rd September 2024 to amend the wording of condition 9 to enable works to commence on the interior of the building, while site investigation into land contamination can be carried out

    Received 5 Oct, published by the council 9 Oct 2026 Amendments