Planning application
88 Upland Road Sutton SM2 5JB
Works: Extension Loft or dormer Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a first floor to existing bungalow to create a two storey dwelling, a part one, part two storey front extension, installation of rooflights to existing garage and conversion of loft space involving a dormer extension at rear and rooflights to flank roofslopes. Patio at the rear at the rear.
As published by the council, reference DM2026/00710
Application record
- Reference
- DM2026/00710
- Status
- Application Granted
- Decision
- Application Granted
- Received
- 11 Jun 2026
- Validated
- 23 Jun 2026
- Decided
- 17 Aug 2026
- Ward
- Sutton South
- Postcode
- SM2 5JB
Timeline
Dates from the published record
-
11 Jun 2026
Received by Sutton
-
23 Jun 2026
Validated
Checked as complete and ready for consideration.
-
25 Jul 2026
Added to PlanIndex
-
17 Aug 2026
Decision issued: Application Granted
-
6 Sep 2026
Status changed to Application Granted
Previously Pending Consideration.
Who's behind it
Company information only, from the register and Companies House
PEQE Engineering Services Ltd Agent, an engineering consultancy registered in Morden
Active · incorporated 2022 · Morden
24 applications on PlanIndex · across 5 councils · 90% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
23 documents on file for this application
- DECISION NOTICE GRANT HHA
- HOUSEHOLDER REPORT
- PROPOSED GROUND FLOOR PLAN
- PROPOSED FIRST FLOOR PLAN
- PROPOSED SECOND FLOOR PLAN
- PROPOSED ROOF PLAN
- PROPOSED ELEVATIONS
- PROPOSED SIDE ELEVATIONS
- PROPOSED SECTION 1
- PROPOSED SECTION 2
- Application Form (No personal data)
- Block Plan
- FIRE SAFETY STATEMENT
- Existing and Proposed Streetscenes
- PLANNING STATEMENT
- Location Plan
- PROPOSED EXTERNAL WALLS PLAN
- EXISTING GROUND FLOOR PLAN
- EXISTING FIRST FLOOR PLAN
- EXISTING ROOF PLAN
- EXISTING ELEVATIONS
- EXISTING SECTION 1
- EXISTING SECTION 2
Trade members open them from here.
Open the documentsWhat this grant of permission means
Sutton granted permission on 17 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Sutton's portal will say. Our guide explains the common types.
Nearby applications
Within 500 metres
-
98 Upland Road Sutton SM2 5JB
Demolition of garage/playroom and erection of a part one, part two storey side and rear extension, conversion of loft space involving alterations to existing roofline and a dormer extension at rear with rooflights to side roofslope and erection of a porch.
Granted Householder Extension Loft or dormer +1 9 docsSmall domestic -
75 The Ridgway Sutton SM2 5JU
Erection of a single storey rear extension.
Granted Householder Extension 8 docsSmall domestic -
87 Upland Road Sutton SM2 5JA
Erection of a single storey rear extension, erection of outbuilding and alteration to front fenestrations.
Granted Householder Extension 21 docsSmall domestic -
Westfield 1A Chalgrove Road Sutton SM2 5JT
Erection of a first floor to existing bungalow to create a two storey dwelling, habitable loft space including a dormer extension to flank, rooflights to front, flank and rear roofslopes, reduction in height of existing roof, removal of flank/rear chimney and alterations to ground floor flank fenestration.
Granted Householder Extension Loft or dormer +1 21 docsDomestic -
65 The Ridgway Sutton SM2 5JU
Erection of a single storey rear extension, erection of a dormer window to front elevation, alterations to fenestration and external materials.
Granted Householder Extension Loft or dormer +1 21 docsSmall domestic -
4A Chalgrove Road Sutton SM2 5JT
92% historically approved · decision due ~31 Oct
Application to remove condition 6 (Trees) of planning permission Ref: 69/5310 for the 'Erection of house and garage' to allow for felling of tree. Condition Number(s): 69/5310 Conditions(s) Removal: The tree is infected. Having it removed safely and professionally is the best option. Removing the condition would allow this to happen. The tree is infected. Having it removed safely and professionally is the best option. Removing the condition would allow this to happen.
Awaiting decision Amendments Trees 1 doc