Skip to content
PlanIndex Get alerts
Menu

Planning application

DM2026/00254

27 Mayfield Road Sutton SM2 5DU

Granted Sutton Full Application

Proposal

Retention and completion of the change of use of the property from Class C3 (a single family dwelling house) to Class C2 (an 8 bedroomed residential care facility for people with learning disabilities and nursing needs) and the demolition of the existing single storey front/flank, rear and rear/flank extensions and detached single storey flank garage, proposed erection of a part one, part two storey side and rear extension, single storey front/flank extension, a dormer extension to the front/flank, internal alterations including the provision of a passenger lift and alteration to the basement layout, alteration to first floor flank and second floor rear fenestrations, provision of a refuse/recycling store to flank/rear of the property and new boundary treatments/access gates to front flanks of the property.

As published by the council, reference DM2026/00254

Timeline

Dates from the published record

  1. 2 Mar 2026

    Received by Sutton

  2. 25 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 17 Jul 2026

    Decision issued: Application Granted

  4. 27 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • B2005/53907 Granted

    47 The Ridgway Sutton Surrey SM2 5JX

    Erection of a two storey side extension and a loft conversion involving three dormer windows at the rear and a single dormer window on the front.

    17 Mar 2005 90m away Householder
  • B2005/53669 Granted

    45 The Ridgway Sutton Surrey SM2 5JX

    Erection of a first floor side extension and a two storey rear extension.

    2 Feb 2005 90m away Householder
  • CLC2021/00301 Decided

    Land Adjacent To 30 The Ridgway Sutton SM2 5JY

    Application to clear condition 13 (drainage, flood risk management and SuDS) of approved application DM2018/00121.

    1 Dec 2021 104m away Conditions
  • DM2026/00876 Awaiting decision

    23 The Ridgway Sutton SM2 5JX

    Erection of a single storey front, side and rear extension and a part one, part two storey side extension. Removal of chimney stacks and alterations to the fenestrations.

    17 Jul 2026 107m away Householder
  • DM2023/01096 Granted

    37 The Ridgway Sutton SM2 5JX

    Erection of a first floor side extension, a front entrance porch and conversion of loft space involving increase in ridge height, dormer extensions at rear and side and rooflights to flank roofslope.

    7 Jul 2023 114m away Householder
  • DM2026/00468 Awaiting decision

    53 The Ridgway Sutton SM2 5JX

    Retention and completion of a part one, part two storey side and rear extension, removal of a ground floor front bay window, alterations to fenestrations and provision of new boundary treatments.

    14 Apr 2026 200m away Householder

In Sutton

  • DM2026/00574 Granted

    81 Banstead Road Carshalton SM5 3NP

    Change of use from Class Ea (Display or retail sale of goods) to Class Eb (Sale of food and drink for consumption on the premises) involving the addition of an extraction flue to the rear.

    7 May 2026 Full applications
  • DM2026/00645 Granted

    28 Deans Road Sutton SM1 1QP

    Erection of infill dormer extensions to the front and rear.

    26 May 2026 Full applications
  • DM2026/00649 Granted

    St Margarets Catholic Church Fir Tree Grove Carshalton SM5 4NG

    Demolition of detached garage and erection of single storey community hall with adjoining roof, access ramp, and alterations to parking and landscaping.

    27 May 2026 Full applications
  • DM2026/00646 Refused

    Flat 2 2 Hampton Road Worcester Park KT4 8ET

    Conversion of loft space involving alterations to existing roofline, a dormer extension at rear and rooflights to front roofslope.

    27 May 2026 Full applications
  • DM2026/00374 Refused

    2 Arlington Drive Carshalton SM5 2EX

    Erection of an attached two storey dwelling with cycle and refuse storage.

    23 Mar 2026 Full applications