Skip to content
PlanIndex Get alerts
Menu

Planning application

Foresters Primary School Redford Avenue Wallington SM6 9DP

Granted Sutton DM2026/00094 Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of attached canopy roof to front and side of building, provision of new fencing and relocation of existing cycle shelter.

As published by the council, reference DM2026/00094

Application record

Reference
DM2026/00094
Type
Full Application
Status
Application Granted
Decision
Application Granted
Received
29 Jan 2026
Validated
2 Feb 2026
Decided
30 Mar 2026
Ward
South Beddington & Roundshaw
Decision by
Delegated Decision
Postcode
SM6 9DP

Timeline

Dates from the published record

  1. 29 Jan 2026

    Received by Sutton

  2. 2 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 30 Mar 2026

    Decision issued: Application Granted

  4. 13 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

3 applications on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Foresters Primary School Redford Avenue Wallington SM6 9DP

    DM2025/01083 Submitted 19 Aug 2025 21m away

    74% historically approved · decision due ~19 Nov

    Demolition of existing outbuilding and erection of replacement outbuilding.

    Awaiting decision Full applications Demolition 8 docs
  • 11 Barlow Close Wallington SM6 9DR

    CLC2023/00158 Submitted 5 Jul 2023 129m away

    Application to clear condition 5 (CLP) of approved application DM2020/01653.

    Decided Conditions 8 docs
  • 11 Barlow Close Wallington SM6 9DR

    DM2020/00473 Submitted 24 Mar 2020 130m away

    Erection of an attached two storey dwelling and provision of detached cycle and refuse stores.

    Refused Full applications 13 docs
    Domestic
  • 11 Barlow Close Wallington SM6 9DR

    CLC2025/00042 Submitted 24 Mar 2025 130m away

    Application to clear condition 7 (Landscaping) and 9 (As-Built SAP Outputs) of approved application DM2020/01653.

    Decided Conditions 13 docs
  • 29 Waterer Rise Wallington SM6 9DN

    DM2025/01231 Submitted 30 Sep 2025 137m away

    Erection of a first floor side extension and single storey rear extension.

    Granted Householder Extension 12 docs
    Small domestic
  • 8 Cobham Close Wallington SM6 9DS

    DM2023/01321 Submitted 15 Aug 2023 138m away

    Erection of a front entrance porch.

    Granted Householder Extension 8 docs
    Small domestic

In Sutton

  • DM2026/00352 Granted

    Bp Service Station 322 Carshalton Road Carshalton SM5 3QB

    Installation of three vehicle charging stations including feeding pillars, ancillary equipment cabinets, new CCTV cameras and alteration to the site layout including relocation of the air and water station.

    18 Mar 2026 Full applications
  • DM2025/01591 Withdrawn

    Ambulance Station Dorset Road Belmont SM2 6JH

    Change of use from Sui Generis (Ambulance Station) to mixed use Classes F1 (Places of Worship) and F2 (Community Hub) involving the erection of a part one, part two storey front and side extension, increase in height to part of building and provision of cycle and refuse stores.

    22 Dec 2025 Full applications
  • DM2026/00427 Refused

    Land To The Side Of 494 Gander Green Lane North Cheam SM3 9RG

    Erection of an attached three storey HMO providing 20 rooms with refuse and cycle store to front and associated landscaping.

    31 Mar 2026 Full applications
  • DM2026/00546 Granted

    The Bungalow 197 Sandy Lane Cheam SM2 7EU

    Demolition of existing bungalow and tennis courts and erection of two detached two storey dwellings with habitable roofspace, provision of vehicle crossovers, erection of gates to front and associated landscaping.

    29 Apr 2026 Full applications
  • DM2026/00287 Refused

    48 Hallmead Road Sutton SM1 1RD

    Change of use from Class C4 (Small HMO) to Class Sui Generis (Large HMO) to provide 10 rooms and provision of refuse and cycle stores.

    6 Mar 2026 Full applications