Planning application
37 Stanley Park Road Carshalton SM5 3HT
Works: Extension Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alterations to existing roofline, erection of a dormer extension at rear and rooflights to front roofslope.
As published by the council, reference DM2025/01570
Application record
- Reference
- DM2025/01570
- Type
- Certificate of Proposed Use
- Status
- Application Granted
- Decision
- Application Granted
- Received
- 16 Dec 2025
- Validated
- 13 Jan 2026
- Decided
- 6 Mar 2026
- Ward
- Wallington South
- Decision by
- Delegated Decision
- Postcode
- SM5 3HT
Timeline
Dates from the published record
-
16 Dec 2025
Received by Sutton
-
13 Jan 2026
Validated
Checked as complete and ready for consideration.
-
6 Mar 2026
Decision issued: Application Granted
-
13 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an engineering consultancy registered in Morden
22 applications on PlanIndex · across 5 councils · 89% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
20 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About outline applications
How this application type works
An outline application tests the principle of developing a site before the detail is worked up. Some or all of the particulars, such as appearance, layout, scale, access and landscaping, are held back as reserved matters for later approval. Permission at outline stage does not by itself allow building to start; the reserved matters must be approved first.
Nearby applications
Within 500 metres
-
37 Stanley Park Road Carshalton SM5 3HT
Erection of a single storey side extension and a first floor rear extension.
Granted Householder Extension 19 docsSmall domestic -
Oakfield Wood Field Primary School Stanley Park Road Carshalton SM5 3HW
Installation of a new GRP enclosure.
Withdrawn Outline 4 docs -
61 Boundary Road Wallington SM6 0SZ
Erection of a part one, part two front, side and rear extension.
Granted Householder Extension 16 docsDomestic -
-
Keston Hawthorne Avenue Carshalton SM5 4PN
Conversion of loft space involving alterations to existing roofline, a dormer extension at rear and rooflights to front roofslope.
Granted Outline Extension Loft or dormer 7 docs -
Springfield Hawthorne Avenue Carshalton Surrey SM5 4PN
Provision of a conservatory at rear.
Granted Householder ExtensionSmall domestic
Other outline applications
In Sutton
-
DM2026/00454 Refused
1 Cotswold Way Worcester Park KT4 8LL
Erection of annexe to side.
-
DM2026/00803 Granted
88 St Philips Avenue Worcester Park KT4 8LA
Erection of a single storey rear extension and an outbuilding.
-
DM2026/00675 Granted
3 Selwood Road Sutton SM3 9JU
Erection of a single storey rear extension.
-
DM2026/00607 Granted
42 The Gallop Sutton SM2 5RY
Conversion of loft space involving alterations to existing roofline, a dormer extension at rear, a window to flank roofslope and rooflights to front roofslope.
-
DM2026/00689 Granted
180 Bridgewood Road Worcester Park KT4 8XU
Conversion of loft space involving alterations to existing roofline, a dormer extension at rear, a window to flank roofslope and rooflights to front roofslope.