Skip to content
PlanIndex Get alerts
Menu

Planning application

69 Brighton Road Sutton SM2 5BT

Granted Sutton DM2025/01553 Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Provision of 3 additional rooms to existing large HMO to provide a total of 10 rooms and provision of cycle and refuse storage to front.

As published by the council, reference DM2025/01553

Application record

Reference
DM2025/01553
Type
Full Application
Status
Application Granted
Decision
Application Granted
Received
12 Dec 2025
Validated
12 Dec 2025
Decided
15 Apr 2026
Ward
Sutton South
Decision by
Delegated Decision
Postcode
SM2 5BT

Timeline

Dates from the published record

  1. 12 Dec 2025

    Received by Sutton

  2. 15 Apr 2026

    Decision issued: Application Granted

  3. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

24 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 69-71 Brighton Road And 2 Cavendish Road Sutton SM2 5BT

    DM2021/02157 Submitted 28 Oct 2021 5m away

    Demolition of three existing houses and erection of a part 6, 5, 4 and 3 storey building to provide 36 residential units, together with amenity space, car parking and amended vehicular access from Cavendish Road.

    Refused Full applications Demolition 102 docs
  • 2 Cavendish Road Sutton SM2 5ET

    DM2025/00534 Submitted 14 Apr 2025 16m away

    Conversion of loft space involving alterations to existing roofline, a dormer extension at rear with rooflights to front roofslope and removal of two flank chimneys.

    Granted Outline Extension Loft or dormer 14 docs
  • Leith Towers Grange Vale Sutton SM2 5BY

    DM2025/01106 Submitted 26 Aug 2025 63m away

    91% historically approved · decision due ~21 Oct

    Non material amendment to approved application DM2024/01531 which allowed 'Installation of new external cladding', to provide alterations to the curtain wall system.

    Awaiting decision Amendments 9 docs
  • Communication Mast Roof Level 0778 Leith Towers Grange Vale Sutton

    DM2026/00075 Submitted 23 Jan 2026 75m away

    The removal and replacement of 3No. antenna, relocation of existing 1No. antenna onto proposed support pole, relocation of 1 no. GPS node and the installation of associated ancillary works thereto. (90655/STN024/MOB RAN/HG)

    Decided Outline 4 docs
  • 12 Cavendish Road Sutton SM2 5ET

    DM2025/01176 Submitted 15 Sep 2025 78m away

    Prior Approval for a single storey rear extension projecting from the rear of the original house by 6m.

    Granted Householder Extension 8 docs
    Small domestic
  • Robertson House 1 Christchurch Park Sutton SM2 5TS

    CLC2026/00135 Submitted 24 Jul 2026 79m away

    89% historically approved · decision due ~24 Sep

    Application to clear conditions 4 (Cycle Store), 5 (Air Source Heat Pump), 7 (SuDs Strategy), 10 (Noise Report), 11 (BNG) and 12 (Tree Survey) of approved application DM2025/01434.

    Awaiting decision Trees

In Sutton

  • DM2026/00352 Granted

    Bp Service Station 322 Carshalton Road Carshalton SM5 3QB

    Installation of three vehicle charging stations including feeding pillars, ancillary equipment cabinets, new CCTV cameras and alteration to the site layout including relocation of the air and water station.

    18 Mar 2026 Full applications
  • DM2025/01591 Withdrawn

    Ambulance Station Dorset Road Belmont SM2 6JH

    Change of use from Sui Generis (Ambulance Station) to mixed use Classes F1 (Places of Worship) and F2 (Community Hub) involving the erection of a part one, part two storey front and side extension, increase in height to part of building and provision of cycle and refuse stores.

    22 Dec 2025 Full applications
  • DM2026/00427 Refused

    Land To The Side Of 494 Gander Green Lane North Cheam SM3 9RG

    Erection of an attached three storey HMO providing 20 rooms with refuse and cycle store to front and associated landscaping.

    31 Mar 2026 Full applications
  • DM2026/00546 Granted

    The Bungalow 197 Sandy Lane Cheam SM2 7EU

    Demolition of existing bungalow and tennis courts and erection of two detached two storey dwellings with habitable roofspace, provision of vehicle crossovers, erection of gates to front and associated landscaping.

    29 Apr 2026 Full applications
  • DM2026/00287 Refused

    48 Hallmead Road Sutton SM1 1RD

    Change of use from Class C4 (Small HMO) to Class Sui Generis (Large HMO) to provide 10 rooms and provision of refuse and cycle stores.

    6 Mar 2026 Full applications