Planning application
Robertson House 1 Christchurch Park Sutton SM2 5TS
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of a two storey side extension to provide one residential unit, formation of a front entrance lobby with ramped access, landscaping and alterations to fenestrations.
As published by the council, reference DM2025/01434
Application record
- Reference
- DM2025/01434
- Type
- Full Application
- Status
- Application Granted
- Decision
- Application Granted
- Received
- 20 Nov 2025
- Validated
- 4 Dec 2025
- Decided
- 10 Mar 2026
- Ward
- Sutton South
- Decision by
- Delegated Decision
- Postcode
- SM2 5TS
Timeline
Dates from the published record
-
20 Nov 2025
Received by Sutton
-
4 Dec 2025
Validated
Checked as complete and ready for consideration.
-
10 Mar 2026
Decision issued: Application Granted
-
13 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Old Hatfield
12 applications on PlanIndex · across 3 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
29 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Robertson House 1 Christchurch Park Sutton SM2 5TS
Non material amendment to approved application DM2025/01434 which allowed the ''Erection of a two storey side extension to provide one residential unit, formation of a front entrance lobby with ramped access, landscaping and alterations to fenestrations.'' to provide all windows, doors and panels to be finished in a grey colour.
Granted Amendments Extension Windows or glazing 4 docs -
Robertson House 1 Christchurch Park Sutton SM2 5TS
89% historically approved · decision due ~24 Sep
Application to clear conditions 4 (Cycle Store), 5 (Air Source Heat Pump), 7 (SuDs Strategy), 10 (Noise Report), 11 (BNG) and 12 (Tree Survey) of approved application DM2025/01434.
Awaiting decision Trees -
Robertson House 1 Christchurch Park Sutton SM2 5TS
Provision of replacement windows to the building.
Granted Full applications Windows or glazing 11 docs -
69-71 Brighton Road And 2 Cavendish Road Sutton SM2 5BT
Demolition of three existing houses and erection of a part 6, 5, 4 and 3 storey building to provide 36 residential units, together with amenity space, car parking and amended vehicular access from Cavendish Road.
Refused Full applications Demolition 102 docs -
69 Brighton Road Sutton SM2 5BT
Provision of 3 additional rooms to existing large HMO to provide a total of 10 rooms and provision of cycle and refuse storage to front.
Granted Full applications 24 docs -
2 Cavendish Road Sutton SM2 5ET
Conversion of loft space involving alterations to existing roofline, a dormer extension at rear with rooflights to front roofslope and removal of two flank chimneys.
Granted Outline Extension Loft or dormer 14 docs
Other full applications applications
In Sutton
-
DM2026/00352 Granted
Bp Service Station 322 Carshalton Road Carshalton SM5 3QB
Installation of three vehicle charging stations including feeding pillars, ancillary equipment cabinets, new CCTV cameras and alteration to the site layout including relocation of the air and water station.
-
DM2025/01591 Withdrawn
Ambulance Station Dorset Road Belmont SM2 6JH
Change of use from Sui Generis (Ambulance Station) to mixed use Classes F1 (Places of Worship) and F2 (Community Hub) involving the erection of a part one, part two storey front and side extension, increase in height to part of building and provision of cycle and refuse stores.
-
DM2026/00427 Refused
Land To The Side Of 494 Gander Green Lane North Cheam SM3 9RG
Erection of an attached three storey HMO providing 20 rooms with refuse and cycle store to front and associated landscaping.
-
DM2026/00546 Granted
The Bungalow 197 Sandy Lane Cheam SM2 7EU
Demolition of existing bungalow and tennis courts and erection of two detached two storey dwellings with habitable roofspace, provision of vehicle crossovers, erection of gates to front and associated landscaping.
-
DM2026/00287 Refused
48 Hallmead Road Sutton SM1 1RD
Change of use from Class C4 (Small HMO) to Class Sui Generis (Large HMO) to provide 10 rooms and provision of refuse and cycle stores.