Skip to content
PlanIndex Get alerts
Menu

Planning application

6 Linden Court Camberley Surrey GU15 3TU

Granted Surrey Heath 26/0337/CES Certificate Proposed Development

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Certificate of lawfulness for the proposed erection of a single storey rear extension and decking.

As published by the council, reference 26/0337/CES

Application record

Reference
26/0337/CES
Type
Certificate Proposed Development
Status
Decided
Decision
Granted As published: Certificate Lawful Proposed Agreed
Received
17 Apr 2026
Validated
17 Apr 2026
Decided
11 Jun 2026
Ward
Old Dean
Decision by
Delegated Decision
Postcode
GU15 3TU

Timeline

Dates from the published record

  1. 17 Apr 2026

    Received by Surrey Heath

  2. 11 Jun 2026

    Decision issued: Certificate Lawful Proposed Agreed

  3. 11 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Aspect Architectural Services LTD Agent, an architecture practice

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

  • DECISION NOTICE Decision · 11 Jun 2026
  • BLOCK AND LOCATION PLAN Plans · 17 Apr 2026
  • PROPOSED ELEVATIONS Plans · 17 Apr 2026
  • PROPOSED FLOOR AND ROOF PLANS Plans · 17 Apr 2026
  • EXISTING ELEVATIONS Plans · 17 Apr 2026
  • EXISTING FLOOR AND ROOF PLANS Plans · 17 Apr 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Surrey Heath granted permission on 11 June 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Magnolia Lodge Middleton Road Camberley Surrey GU15 3TU

    22/0559/FFU Submitted 9 Jun 2022 50 yards away

    Erection of a single storey rear/side extension.

    Granted Full applications Extension 28 docs
    Small domestic
  • Lavinia House Middleton Road Camberley Surrey GU15 3TU

    TWA/26/0181 Submitted 27 Jul 2026 150 yards away

    T1: Common Lime Tree (Tilia x europaea) reduce and reshape by 2.5mts overall. Remove all lowest foliage to a height of 7-8mts from ground level. The estimated current crown spread of T1 Common Lime is 15mts and height 24mts. The estimated maximum crown spread post reduction will be 12.5mts with an estimated height of 21.5mts, post reduction. RE T2: Sweet Chestnut Tree (Castanea sativa) reduce and reshape by 2.5mts overall. The estimated current crown spread of T2 Sweet Chestnut tree is 12mts and height 20mts. The estimated maximum crown spread post reduction will be 9.5mts with an estimated height of 17.5mts, post reduction.

    Decided Trees 2 docs
  • 13 Crosby Hill Drive Camberley Surrey GU15 3TZ

    TWA/26/0180 Submitted 27 Jul 2026 150 yards away

    Removal T1 Scots Pine to ground level.

    Granted 3 docs
  • 4 Amberwood Drive Camberley Surrey GU15 3UD

    TWA/26/0074 Submitted 18 Mar 2026 150 yards away

    T1: Carefully reduce in length by 2-4mts and back to the previous pruning points the crown of one Red Oak tree (Quercus rubra). The current crown height is estimated to be 24mts with an estimated crown spread of 12mts. The estimated height post reduction will be 20mts. The estimated crown spread post reduction will be 8mts

    Granted Trees 2 docs
  • 10 Crosby Hill Drive Camberley Surrey GU15 3TY

    TWA/25/0303 Submitted 27 Oct 2025 150 yards away

    T1 - Cedar - Crown thin by 15%, general prune to remove dead weak and crossing branches and improve form (Works subject to TPO 4/70)

    Granted Trees 2 docs
  • 27 Crosby Hill Drive Camberley Surrey GU15 3TZ

    25/0965/FFU Submitted 3 Sep 2025 200 yards away

    Erection of single storey front and rear extensions and conversion of garage to attached annex.

    Granted Full applications Extension 10 docs
    Small domestic

In Surrey Heath

  • 26/0807/CES Awaiting decision

    37 Salisbury Grove Mytchett Camberley Surrey GU16 6BP

    Certificate of lawfulness for the proposed use of outbuilding as a home office.

    Received 4 Sep, published by the council 9 Sep 2026 Outline
  • 26/0791/CES Awaiting decision

    7 Holly Ridge West End Woking Surrey GU24 9QE

    Certificate of lawfulness for the proposed erection of a dropped kerb and associated driveway.

    Received 31 Aug, published by the council 2 Sep 2026 Outline
  • 26/0786/CES Awaiting decision

    276 Frimley Road Camberley Surrey GU15 2QH

    Certificate of lawfulness for the proposed erection of a single storey rear extension, hip-to-gable roof enlargement, installation of rear dormers, roof lights to the front roof slope and side facing windows for the associated loft conversion.

    Received 28 Aug, published by the council 2 Sep 2026 Outline
  • 26/0785/OOU Awaiting decision

    Land Opposite 7 Chatton Row Bisley Woking Surrey GU24 9AP

    Outline application for the development of 3 detached residential dwellings access, layout and scale to be determined with all other matters reserved.

    Received 27 Aug, published by the council 2 Sep 2026 Outline
  • 26/0754/PCA Awaiting decision

    Bray Studios Down Place Water Oakley Windsor SL4 5UG

    Consultation from Royal Borough of Windsor and Maidenhead for the redevelopment and expansion of the existing film and television studio incorporating demolition; restoration of Down Place House; retention of existing sound stages on a permanent basis and associated works; relocation of existing ancillary office and production facilities; construction of 6no. new sound stages, workshops, multi-storey car park (including security, café and cycle parking), and associated office and production facilities; backlot; landscaping; and new vehicular access and egress off Windsor Road.

    Received 13 Aug, published by the council 19 Aug 2026 Outline