Planning application
Eguzkilore 40 Oakridge West End Woking Surrey GU24 9PJ
Works: Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Conversion of loftspace to habitable accommodation and insertion of roof lights.
As published by the council, reference 26/0123/FFU
Application record
- Reference
- 26/0123/FFU
- Type
- Full Planning Application
- Status
- Decided
- Decision
- Grant
- Received
- 10 Feb 2026
- Validated
- 11 Feb 2026
- Decided
- 13 Apr 2026
- Ward
- Bisley & West End
- Parish
- West End Parish Council
- Decision by
- Delegated Decision
- Postcode
- GU24 9PJ
Timeline
Dates from the published record
-
10 Feb 2026
Received by Surrey Heath
-
11 Feb 2026
Validated
Checked as complete and ready for consideration.
-
13 Apr 2026
Decision issued: Grant
-
11 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
13 applications on PlanIndex · across 10 councils · 83% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
14 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
39 Oakridge West End Woking Surrey GU24 9PJ
Erection of single storey side extension and conversion of loft to habitable accommodation with addition of roof lights.
Granted Full applications Extension Loft or dormer 35 docsSmall domestic -
39 Oakridge West End Woking Surrey GU24 9PJ
Erection of a two storey side extension.
Refused Full applications Extension 34 docs -
Dorna House Two Guildford Road West End Woking Surrey GU24 9PW
Submission of details to comply with condition 4,5,7 (noise management, electric car charging, materials) attached to planning permission 24/0421/FFU for Resurfacing existing car park to the rear, part conversion of the rear car parking area for use as a garden play area, construction of fences, installation of bicycle shelters, extension to existing bin store and alterations to the fenestration. All works in association with the use of the building as a children's nursery (falling within the same Use Class E as the current use).
Granted Extension Windows or glazing 6 docs -
Dorna House One Guildford Road West End Woking Surrey GU24 9PW
Application for advertisement consent for the retention of 1 non-illuminated sign and the installation of 1 non-illuminated sign
Granted Advertising 9 docs -
44 Guildford Road West End Woking Surrey GU24 9PW
Retrospective application for advertisement consent for one externally multi display illuminated fascia sign.
Granted Advertising 15 docs -
Dorna House One Guildford Road West End Woking Surrey GU24 9PW
89% historically approved · decision due ~24 Dec
Application for advertisement consent for the display of a Totem sign.
Awaiting decision Advertising 5 docs
Other full applications applications
In Surrey Heath
-
26/0344/FFU Granted
Brockset Kennel Lane Windlesham Surrey GU20 6AA
Erection of outbuilding following demolition of existing shed.
-
26/0301/FFU Refused
4 Cedar Business Park Cedar Lane Frimley Camberley Surrey GU16 7AZ
Change of use from office Use class E(g) to indoor sport, recreation and fitness under Use Class E(d) and sports therapy Use Class E(e) (retrospective)
-
26/0199/FFU Granted
37 Frimley High Street Frimley Camberley Surrey GU16 7HJ
Change of use from an existing coffee shop (Class Eb) to an open-grill Greek food takeaway/restaurant (Sui Generis) including installation of kitchen extraction and internal layout alterations.
-
26/0338/FFU Granted
134 London Road Bagshot Surrey GU19 5BZ
Erection of a self-build detached dwelling with detached garage following subdivision of existing plot following demolition of existing garage. Installation of vehicular access gate to 134 London Road.
-
26/0336/FFU Granted
Orchard Lodge 32 Higgs Lane Bagshot Surrey GU19 5DP
Erection of a replacement dwelling, conversion of retained garage into ancillary storage with insertion of roof lights and change to materials, relocation of access gates and associated hard and soft landscaping.