Planning application

Longcross Studios Chobham Lane Longcross Chertsey Surrey

Awaiting decision Surrey Heath 25/1021/FFU Full Planning Application

Works: Demolition

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Cross boundary application for full planning permission for the phased partial redevelopment of the Longcross Studios site including the demolition of existing buildings, erection of new sound stages, ancillary buildings, retention and creation of backlot facilities, car parking, and associated works to support the existing use of the site as a film studio (Use Class E(g)(iii)).

As published by the council, reference 25/1021/FFU

Application record

Reference
25/1021/FFU
Type
Full Planning Application
Status
Awaiting decision
Received
16 Sep 2025
Validated
16 Sep 2025
Ward
Outside Boundary
Postcode
KT16 0EE

Timeline

Dates from the published record

  1. 16 Sep 2025

    Received by Surrey Heath

  2. 30 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 11 November 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Surrey Heath took a median of 54 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Montagu Evans LLP Agent, registered in London

Active · incorporated 2005 · London

1,082 applications on PlanIndex · across 120 councils · 98% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

133 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Surrey Heath for determination, against a statutory target of eight weeks. Over the last year Surrey Heath decided full applications in a median of 56 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Longcross North Chobham Lane Longcross Chertsey KT16 0EE

    21/30008/SMI Submitted 1 Jun 2021 0.1 miles away

    Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)

    Granted Demolition 5 docs
  • Longcross North Chobham Lane Longcross Chertsey KT16 0EE

    22/30013/SMI Submitted 10 May 2022 0.1 miles away

    Section 73 application for Variation of Condition 10 (approved plans) of planning permission RU.21/0780 [(Phase 3 Reserved Matters application for the development of a data centre campus comprising: a) A building(s) for data storage and processing, associated cooling infrastructure, ancillary office and technical space and roof mounted PV cells; b) Energy Centre Building; c) Stand-By Generators and fuel storage; d) HV Sub-Station; e) visitor reception centre; 3 f) hard and soft landscaping and g) new roads, paths and yards and the provision of parking for cycles, cars and commercial vehicles, and requiring: h) site preparation and earthworks, i) drainage and associated infrastructure works (including SUDS), j) the erection of walls (including retaining walls) and fences, k) the installation of external lighting and necessary physical security systems, and l) other enabling works required during the construction and operation of the data centre campus. The application forms part of phase 3 of planning permission RU.13/0856 (as revised under RU.16/0584) (Hybrid planning permission for the demolition of existing buildings and redevelopment of the Longcross North site)] to seek amendments to the approved plans including relocation of the energy centre, changes to the data centre building, re-positioning of the HV substation and re-siting and redesign of the back up generators.

    Decided Demolition 3 docs
  • Longcross Studios Chobham Lane Longcross Chertsey KT16 0EE

    RU.25/1392 Submitted 13 Oct 2025 0.2 miles away

    Details pursuant to Discharge Condition 7 (SuDS) of planning permission RU.23/1712 Construction of a workshop building on existing hardstanding and associated works

    Granted Conditions 3 docs
  • Longcross North Data Centre Campus CHOBHAM LANE CHERTSEY KT16 0EE

    RU.24/1339 Submitted 9 Oct 2024 0.2 miles away

    Details pursuant to Discharge Condition 37 (Provision of electric vehicle charging and hierarchy for priority of use) of planning permission RU.13/0856 in respect of the Phase 3 Data Centre campus

    Granted Conditions 4 docs
  • Longcross North - Longcross Studios Chobham Lane Chertsey KT16 0EE

    RU.25/1749 Submitted 11 Dec 2025 0.2 miles away

    Details pursuant to Discharge Condition 2 (drainage) of planning permission RU.25/0213 Full planning permission for the retention of film studio workshop building 1 (previously granted temporary planning permission under reference RU.19/1851 and RU.23/0651)

    Granted Conditions 4 docs
  • Longcross Studios Chobham Lane Longcross Chertsey KT16 0EE

    RU.23/1712 Submitted 23 Jan 2024 0.2 miles away

    Construction of a workshop building on existing hardstanding and associated works

    Granted 18 docs

In Surrey Heath

  • 26/0338/FFU Granted

    134 London Road Bagshot Surrey GU19 5BZ

    Erection of a self-build detached dwelling with detached garage following subdivision of existing plot following demolition of existing garage. Installation of vehicular access gate to 134 London Road.

    Received 20 Apr, published by the council 30 Jul 2026 Full applications
  • 26/0336/FFU Granted

    Orchard Lodge 32 Higgs Lane Bagshot Surrey GU19 5DP

    Erection of a replacement dwelling, conversion of retained garage into ancillary storage with insertion of roof lights and change to materials, relocation of access gates and associated hard and soft landscaping.

    Received 20 Apr, published by the council 30 Jul 2026 Full applications
  • 25/1001/FFU Withdrawn

    32A High Street Bagshot Surrey GU19 5AZ

    Change of use of the first floor from (Class E) Office to a (Class C3) 1-bedroomed flat.

    Received 10 Sep, published by the council 30 Jul 2026 Full applications
  • 26/0471/FFU Granted

    11-13 High Street Camberley GU15 3RB

    Subdivision of existing retail unit (use class E) into three units (use class E), reconfiguration of principal shopfront, and formation of new shopfront to side elevation followng the removal of the parking/servicing area

    Received 1 Jun, published by the council 30 Jul 2026 Full applications
  • 26/0431/FFU Granted

    4 Highbury Crescent Camberley Surrey GU15 1JZ

    Erection of front extension and conversion of garage to habitable accommodation with changes to external materials and fenestration.

    Received 18 May, published by the council 30 Jul 2026 Full applications