Skip to content
PlanIndex Get alerts
Menu

Planning application

Communication Station Bagshot Heath Radio Station Telecommunications Mast And Antenas Bracknell Road Camberley Surrey

Granted Surrey Heath 25/0981/GPT General Permitted Development Telecoms

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Notification under Regulation 5 of the Electronic Communications Code Regulations 2017 for the removal and replacement of 3no. antennas at 43.35m and 6no. Remote Radio Heads (RRHs) with associated ancillary equipment on the lattice tower. The installation of 1no. GPS node at ground level.

As published by the council, reference 25/0981/GPT

Application record

Reference
25/0981/GPT
Type
General Permitted Development Telecoms
Status
Decided
Decision
No Objection
Received
3 Sep 2025
Validated
3 Sep 2025
Decided
10 Sep 2025
Ward
Bagshot
Decision by
Delegated Decision
Postcode
GU15 4BG

Timeline

Dates from the published record

  1. 3 Sep 2025

    Received by Surrey Heath

  2. 10 Sep 2025

    Decision issued: No Objection

  3. 11 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

In Surrey Heath

  • 25/1044/GPT Decided

    Telephone Pole Outside 268 Guildford Road Bisley Woking Surrey

    Notification under Regulation 5 of the Electronic Communications Code Regulations 2017 for the erection of a telecommunications pole (10 metre maximum height).

    19 Sep 2025 Telecoms
  • 25/1012/GPT Granted

    Telecommunications Mast Chertsey Road Windlesham Surrey

    Notification under Regulation 5 of the Electronic Communications Code Regulations 2017 for upgrade of an existing telecommunications base station comprising the addition of 3 no. new antennas on proposed support poles, the relocation of 3no. existing antennas and 2no. dishes onto proposed support poles, together with the removal of 1no. equipment cabinet and the replacement with 1no. new equipment cabinet and ancillary development.

    12 Sep 2025 Telecoms
  • 25/0942/GPT Decided

    Telephone Pole West Of 31 Highland Road Camberley Surrey

    Notification under Regulation 5 of the Electronic Communications Code Regulations 2017 for Installation of Fixed Line Broadband Apparatus.

    22 Aug 2025 Telecoms
  • 25/0952/GPT Awaiting decision

    BAGSHOT HEATH RADIO STATION BRACKNELL ROAD GU15 4BG

    Notification under Regulation 5 of the Electronic Communications Code Regulations 2003 (as amended) for the installation of fixed line broadband apparatus in the form of a 10m high wooden pole.

    28 Aug 2025 Telecoms
  • 25/0906/GPT Granted

    Telecoms Pole At 86 Mitcham Road Camberley GU15 4AJ

    Prior approval application under Regulation 5 of the Electronic Communications Code (Conditions and restrictions) Regulations 2003 (as amended) for a Notice of Intention to Install Fixed Line Broadband Apparatus. (10m Wooden Pole))

    11 Aug 2025 Telecoms