Skip to content
PlanIndex Get alerts
Menu

Planning application

12 Roker Park Road Sunderland SR6 9PF

Granted Sunderland 24/01248/FUL Full Application

Works: Loft or dormer Roofing Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Retrospective permission for the installation of sash windows on the front and rear elevations, re-roof existing property to spanish slate including the installation of 6no rooflights. (Amended Description)

As published by the council, reference 24/01248/FUL

Application record

Reference
24/01248/FUL
Type
Full Application
Status
Decided
Decision
Approved
Received
25 Jun 2024
Validated
12 Jul 2024
Decided
12 Dec 2024
Ward
St Peters
Decision by
Delegated Decision
Postcode
SR6 9PF

Timeline

Dates from the published record

  1. 25 Jun 2024

    Received by Sunderland

  2. 12 Jul 2024

    Validated

    Checked as complete and ready for consideration.

  3. 12 Dec 2024

    Decision issued: Approved

  4. 23 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Roker Methodist Church Roker Park Road Sunderland SR6 9PF

    24/01923/TPC Submitted 19 Sep 2024 7m away

    2T - (Swedish whitebeam) - fell due to decay and replant with 2-2.5m standard 8-10cm Field Maple 3T - (Laburnum) - 2m lateral reduction to east face including the removal of all dead and dying branches to reduce load on decaying stems

    Granted Trees 5 docs
  • Roker Methodist Church Roker Park Road Sunderland SR6 9PF

    24/01889/TPC Submitted 17 Sep 2024 7m away

    SG2 (Mixed Species Shrubs) - Fell and treat stump with eco plugs (broadleaved). T1 (Hornbeam) - Fell and treat stump with eco Fell and treat stump with eco plugs (broadleaved)

    Granted Trees 10 docs
  • 9 Roker Park Road Sunderland SR6 9PF

    24/00966/FHH Submitted 16 May 2024 19m away

    Erection of single storey extension to rear. (fast track)

    Granted Householder Extension 29 docs
    Small domestic
  • 7 Gillside Grove Sunderland SR6 9PQ

    19/01813/FUL Submitted 25 Oct 2019 73m away

    Increased roof ridge height and rear dormer extension to rear.

    Granted Full applications Extension Loft or dormer +1 8 docs
  • 31 Park Parade Sunderland SR6 9LU

    21/00523/FDC Submitted 8 Mar 2021 121m away

    Demolition of existing rear extension and erection of new extension, loft conversion with dormer windows and rooflights to front and rear. (As Amended 20/05/2021)

    Granted Heritage and listed buildings Extension Loft or dormer +2 13 docs
  • 58 Park Lea Road Sunderland SR6 9PH

    19/01673/CLP Submitted 7 Oct 2019 127m away

    Certificate for lawful proposed development for construction of hip-to-gable loft conversion; to include dormer to the rear and installation of 3 no. roof lights to front elevation.

    Decided Lawful development Loft or dormer 8 docs

In Sunderland

  • 26/00956/FUL Granted

    35 Maud Street Sunderland SR6 9EJ

    Installation of a dog grooming pod to change of use from incidental residential use to a home-based dog grooming business to the rear yard. (additional information received 30.06.2026)

    29 Apr 2026 Full applications
  • 25/01853/FUL Withdrawn

    Land At Camberwell Way Field Camberwell Way Sunderland SR3 3BE

    The installation of a 40 metre high lattice tower supporting 6 no. antennas and 4 no. transmission dishes with 3 no. equipment cabinets, and ancillary development thereto within fenced compound (Preliminary Ecological Appraisal received 13.02.2026, Supplementary Supporting Statement received 13.03.2026, and Biodiversity Net Gain Information received 15.05.2026).

    15 Aug 2025 Full applications
  • 26/00959/FUL Withdrawn

    19 Lapwing Close Ayton Washington NE38 0ET

    Erection of single storey extensions to the side, rear, bow windows to front with render finish with erection of dormers on the east and west elevations, erection of new front porch.

    29 Apr 2026 Full applications
  • 26/01857/FUL Awaiting decision

    15 Dundas Street Sunderland SR6 0AY

    Change of use from student accommodation to supported residential accommodation (Use Class C2) with no external alterations.(Retrospective)

    26 Aug 2026 Full applications
  • 26/00839/FUL Withdrawn

    Land To Side Of 2 Hawthorn Avenue Sunderland SR3 1DU

    Change of use of open space to private garden including the erection of boundary fencing and stopping up of highway.

    16 Apr 2026 Full applications