Skip to content
PlanIndex Get alerts
Menu

Planning application

9 Ashton Way Sunderland SR3 3RX

Granted Sunderland 24/00143/FUL Full Application

Works: Extension Roofing Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of a two storey side extension and new roof to existing study to side, with an additional window in the side elevation (east). (as amended)

As published by the council, reference 24/00143/FUL

Application record

Reference
24/00143/FUL
Type
Full Application
Status
Decided
Decision
Approved
Received
26 Jan 2024
Validated
6 Feb 2024
Decided
30 Jul 2024
Ward
St Chads
Decision by
Committee Decision
Postcode
SR3 3RX

Timeline

Dates from the published record

  1. 26 Jan 2024

    Received by Sunderland

  2. 6 Feb 2024

    Validated

    Checked as complete and ready for consideration.

  3. 30 Jul 2024

    Decision issued: Approved

  4. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 8 Ashton Way Sunderland SR3 3RX

    24/00777/FUL Submitted 23 Apr 2024 34m away

    Single storey extension to rear and alterations to existing first floor extension to raise the roof to provide additional bedrooms. (Amended plans to reduce ridge height received on 27.8.24)

    Granted Full applications Extension Roofing 10 docs
    Small domestic
  • 20 Glendale Close Sunderland SR3 3RY

    21/00948/SUB Submitted 21 Apr 2021 122m away

    Erection of a single storey extension to rear and new porch to front (Resubmission)

    Granted Extension 12 docs
    Small domestic
  • 20 Glendale Close East Herrington Sunderland SR3 3RY

    20/02415/FUL Submitted 22 Dec 2020 123m away

    Erection of a two storey side extension, single storey rear extension, including juliet balcony to rear first floor and porch to front.(Amended proposal and plans received 16.02.21)

    Refused Full applications Extension 29 docs
    Small domestic
  • 56 Longmeadows Sunderland SR3 3SE

    21/00908/FUL Submitted 17 Apr 2021 126m away

    Erection of single storey extensions to front and rear.

    Granted Full applications Extension 8 docs
    Small domestic
  • 24 Woodside Terrace Sunderland SR3 3SG

    26/01265/FUL Submitted 10 Jun 2026 139m away

    91% historically approved · decision due ~21 Sep

    Erection of 2 storey side extension to create a granny flat and erection of front porch with cladding

    Awaiting decision Full applications Extension
    Small domestic
  • Rear Of 16 Woodside Terrace Sunderland SR3 3SG

    22/01843/TPA Submitted 15 Aug 2022 139m away

    1no. Ash Tree - Thin by 20%, pruning out dead and damaged wood. Crown lift secondary branches only to 2.5m above ground level, giving an overall leaf volume reduction of 25 percent.

    Granted Trees 5 docs

In Sunderland

  • 26/00956/FUL Granted

    35 Maud Street Sunderland SR6 9EJ

    Installation of a dog grooming pod to change of use from incidental residential use to a home-based dog grooming business to the rear yard. (additional information received 30.06.2026)

    29 Apr 2026 Full applications
  • 25/01853/FUL Withdrawn

    Land At Camberwell Way Field Camberwell Way Sunderland SR3 3BE

    The installation of a 40 metre high lattice tower supporting 6 no. antennas and 4 no. transmission dishes with 3 no. equipment cabinets, and ancillary development thereto within fenced compound (Preliminary Ecological Appraisal received 13.02.2026, Supplementary Supporting Statement received 13.03.2026, and Biodiversity Net Gain Information received 15.05.2026).

    15 Aug 2025 Full applications
  • 26/00959/FUL Withdrawn

    19 Lapwing Close Ayton Washington NE38 0ET

    Erection of single storey extensions to the side, rear, bow windows to front with render finish with erection of dormers on the east and west elevations, erection of new front porch.

    29 Apr 2026 Full applications
  • 26/01857/FUL Awaiting decision

    15 Dundas Street Sunderland SR6 0AY

    Change of use from student accommodation to supported residential accommodation (Use Class C2) with no external alterations.(Retrospective)

    26 Aug 2026 Full applications
  • 26/00839/FUL Withdrawn

    Land To Side Of 2 Hawthorn Avenue Sunderland SR3 1DU

    Change of use of open space to private garden including the erection of boundary fencing and stopping up of highway.

    16 Apr 2026 Full applications