Planning application
4 Turbine Way Sunderland SR5 3NZ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 2 commercial units including new vehicular access and associated parking/service areas (Resubmission) (Part retrospective).
As published by the council, reference 22/02601/SUB
Application record
- Reference
- 22/02601/SUB
- Type
- Resubmission
- Status
- Decided
- Decision
- Approved
- Received
- 29 Nov 2022
- Validated
- 29 Nov 2022
- Decided
- 7 Mar 2023
- Decision by
- Committee Decision
- Postcode
- SR5 3NZ
Timeline
Dates from the published record
-
29 Nov 2022
Received by Sunderland
-
7 Mar 2023
Decision issued: Approved
-
23 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in North Ferriby
2 applications on PlanIndex · across 2 councils
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
44 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Sunderland is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
Brenntag UK Ltd Turbine Business Park Nissan Way Washington SR5 3QY
Application for Hazardous Substance Consent.
Withdrawn Other 11 docs -
Land At Turbine Way Sunderland
Erection of 2no. industrial units with associated access, landscaping and parking
Granted Full applications 52 docs -
Land At Turbine Business Park Turbine Way Sunderland
Construction of 4no. two storey buildings (Use Class B2/B8) including access onto Turbine Way, parking and turning space and landscaping
Granted Full applications 130 docs -
Brenntag Uk Limited 4 Turbine Way Sunderland SR5 3NZ
Discharge of condition 3 (CEMP) attached to planning application 19/01062/FUL (part 1 of 4).
Granted Conditions 11 docs -
Land North Of Sunderland Highway Between Vantec And Brenntag Sites Sunderland
Erection of 1no. internally illuminated totem sign
Granted Advertising 8 docs -
Tyne And Wear Fire And Civil Defence Authority Barmston Mere Fire Training Centre Nissan Way Washington SR5 3QY
91% historically approved · decision due ~16 Sep
Adaptions to the existing fire service training structure including the installation of an external escape stair and balustrades, addition of a new sliding door, replacement of existing shutters to window openings with new shutters and installation of new flues.
Awaiting decision Full applications Windows or glazing