Planning application
J & B Recycling 1 Monument Park Washington NE38 8QU
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Variation of conditions 3 (hours) and 4 (operating hours) relating to 19/01583/MAW - To allow site to operate on a weekend (7 days per week).
As published by the council, reference 21/00259/MAV
Application record
- Reference
- 21/00259/MAV
- Type
- Minerals Waste VAR (County Matters)
- Status
- Decided
- Decision
- Granted As published: Approved
- Received
- 4 Feb 2021
- Validated
- 4 Feb 2021
- Decided
- 9 Jun 2021
- Ward
- Washington East
- Decision by
- Committee Decision
- Postcode
- NE38 8QU
Timeline
Dates from the published record
-
4 Feb 2021
Received by Sunderland
-
9 Jun 2021
Decision issued: Approved
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Sunderland granted permission on 9 June 2021, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About less common application types
This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Veolia ES (UK) Ltd 1 Monument Park Washington NE38 8QU
Installation of a water tank and associated pump house/plant room, fuel tank and the change of use of existing wood bays to vehicle wash bay.
Granted Other 21 docs -
1 Monument Park Washington NE38 8QU
Variation of conditions 4 (operating hours) and 5 (delivery times) of planning approval 12/02218/FUL (as amended by planning permission refs. 13/02411/MAW and 13/03158/MAW) to allow operation of the recycling facility on bank holidays for reasons outlined in the planning statement.
Granted Other 16 docs -
Veolia ES (UK) Ltd 1 Monument Park Washington NE38 8QU
Erection of a welfare cabin
Granted Other 13 docs -
Manheim Auctions Northern Car Auctions Ltd Pattinson Road Pattinson Industrial Estate Washington NE38 8QL
Creation of a new customer car park access on site, to include erection of new sub division fencing to an existing hard standing to separate transporter and customer vehicle flows. Erection of new on site signage.
Decided Lawful development 14 docs -
Fred Mence Construction Limited 11 Walton Road Pattinson North Washington NE38 8QE
Erection of detached garage/storage building.
Granted Full applications 19 docs -
12 Walton Road Pattinson North Washington NE38 8QE
Erection of a new sub station.
Granted Full applications 16 docs
Other less common application types
In Sunderland
-
26/01803/MAW Awaiting decision
Thompsons Of Prudhoe Quarry Springwell Road Springwell Gateshead NE9 7SQ
Installation of concrete batching plant, including aggregate hoppers, mixing machine, storage silos and aggregate storage bays (part retrospective)
-
26/01784/MAW Awaiting decision
Thompsons Of Prudhoe Quarry Springwell Road Springwell Gateshead NE9 7SQ
Installation of area of concrete hardstanding
-
26/01687/MAW Awaiting decision
Eppleton Quarry Downs Pit Lane/Lindsay Street Hetton-le-Hole Houghton-le-Spring DH5 9NH
The extraction of sand and limestone from Eppleton Quarry up until 2048 (a time extension of 8 years) and the importation of 5.6 million tonnes of material over a 21-year period to infill the resulting void and to restore the quarry. Restoration as extension to Hetton Lyons Country Park. At Eppleton Quarry, Downs Pit Lane, Hetton le Hole
-
26/01691/HY4 Awaiting decision
Land To The North Of A1290 Washington.
Hybrid Application comprising 442 dwellings (C3 use) including details of the means of access served from the A1290, earthworks, landscaping, public open space and drainage attenuation (full application), and construction of employment floorspace (Use Class (B8) with ancillary (E(g)(i)) office associated servicing and infrastructure, including sub-station, car parking, service yards and circulation space, drainage attenuation, earthworks and landscaping (outline application all matters reserved).
-
26/01596/LP3 Awaiting decision
Usworth Recreation Park Manor Road Concord Washington
Repair of fire damaged building including amendments to the front elevations. Existing stepped access/doorway to the left side of the front elevation to be infilled with timber studs and new window opening installed. Existing external sand/cement render to be stripped off and new vented cavity system constructed and finished with silicone render system and replacement PVCu windows