Skip to content
PlanIndex Get alerts
Menu

Planning application

7 Eden Vale Sunderland SR2 7NJ

Granted Sunderland 19/00383/FUL Full Application

Works: New dwelling Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Conversion of dwelling into two self contained flats.

As published by the council, reference 19/00383/FUL

Application record

Reference
19/00383/FUL
Type
Full Application
Status
Decided
Decision
Approved
Received
1 Mar 2019
Validated
1 Mar 2019
Decided
11 Apr 2019
Ward
Millfield
Decision by
Delegated Decision
Postcode
SR2 7NJ

Timeline

Dates from the published record

  1. 1 Mar 2019

    Received by Sunderland

  2. 11 Apr 2019

    Decision issued: Approved

  3. 2 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

13 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 3 Riversdale Terrace Sunderland SR2 7NQ

    26/01828/CLE Submitted 23 Aug 2026 47m away

    87% historically approved · decision due ~18 Oct

    Certificate of lawfulness for existing use as a HMO.

    Awaiting decision Lawful development
  • 4 Riversdale Terrace Sunderland SR2 7NQ

    17/01888/FUL Submitted 21 Sep 2017 54m away

    Change of use to a house in multiple occupation

    Granted Full applications 13 docs
  • 1 Burnville Road South Sunderland SR4 7LT

    19/01708/FUL Submitted 11 Oct 2019 125m away

    Erection of a single storey rear extension.

    Granted Full applications Extension 14 docs
    Small domestic
  • 7 Burn Park Road Thornhill Sunderland SR2 7LS

    24/00665/CLE Submitted 8 Apr 2024 134m away

    Certifcate of lawful existing use as 8 bed HMO.(amended description 15.05.24)

    Decided Lawful development 5 docs
  • 3 Oakwood Street Sunderland SR2 7LT

    17/02469/LP3 Submitted 28 Dec 2017 151m away

    Change of use from single residential dwelling to semi independent living accommodation.

    Withdrawn Other 28 docs
    Domestic
  • 17 Fernville Street Sunderland SR4 7LX

    19/01687/FUL Submitted 7 Oct 2019 168m away

    Erection of a single storey extension to rear (Retrospective)

    Refused Full applications Extension 10 docs
    Small domestic

In Sunderland

  • 26/00956/FUL Granted

    35 Maud Street Sunderland SR6 9EJ

    Installation of a dog grooming pod to change of use from incidental residential use to a home-based dog grooming business to the rear yard. (additional information received 30.06.2026)

    29 Apr 2026 Full applications
  • 25/01853/FUL Withdrawn

    Land At Camberwell Way Field Camberwell Way Sunderland SR3 3BE

    The installation of a 40 metre high lattice tower supporting 6 no. antennas and 4 no. transmission dishes with 3 no. equipment cabinets, and ancillary development thereto within fenced compound (Preliminary Ecological Appraisal received 13.02.2026, Supplementary Supporting Statement received 13.03.2026, and Biodiversity Net Gain Information received 15.05.2026).

    15 Aug 2025 Full applications
  • 26/00959/FUL Withdrawn

    19 Lapwing Close Ayton Washington NE38 0ET

    Erection of single storey extensions to the side, rear, bow windows to front with render finish with erection of dormers on the east and west elevations, erection of new front porch.

    29 Apr 2026 Full applications
  • 26/01857/FUL Awaiting decision

    15 Dundas Street Sunderland SR6 0AY

    Change of use from student accommodation to supported residential accommodation (Use Class C2) with no external alterations.(Retrospective)

    26 Aug 2026 Full applications
  • 26/00839/FUL Withdrawn

    Land To Side Of 2 Hawthorn Avenue Sunderland SR3 1DU

    Change of use of open space to private garden including the erection of boundary fencing and stopping up of highway.

    16 Apr 2026 Full applications