Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of part two storey/ part single storey extension to side and front
As published by the council, reference 19/00340/FUL
Application record
- Reference
- 19/00340/FUL
- Type
- Full Application
- Status
- Decided
- Decision
- Approved
- Received
- 25 Feb 2019
- Validated
- 19 Mar 2019
- Decided
- 14 May 2019
- Ward
- Barnes
- Decision by
- Delegated Decision
- Postcode
- SR3 1TN
Timeline
Dates from the published record
-
25 Feb 2019
Received by Sunderland
-
19 Mar 2019
Validated
Checked as complete and ready for consideration.
-
14 May 2019
Decision issued: Approved
-
2 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
10 Alpine Way Sunderland SR3 1TN
Erection of a detached garage to rear garden
Withdrawn Full applications 10 docs -
Land East Of Durham Road And Tudor Grove (Humbledon Hill) Durham Road Sunderland
Variation of condition 2 (approved plans) attached to planning application 14/01638/FUL. Plans to be substituted in response to proposed design amendments to house types.
Granted Amendments 13 docs -
18 Alpine Way Sunderland SR3 1TN
Erection of a single storey rear extension with balcony above.
Granted Full applications Extension 11 docsSmall domestic -
Land To The Rear Of Tudor Grove Sunderland
Erection of a 4no. bedroom dwelling
Refused Full applications 16 docsDomestic -
Land To Rear Of Tudor Grove Sunderland SR3 1SB
Erection of 4 bedroom Dwelling (RESUBMISSION).
Refused 21 docsDomestic -
7 Montrose Gardens Sunderland SR3 1UU
Erection of a two storey extension with pitched roof new wall cladding, windows and doors.(Amended plans received 8th and 11th April 2024).
Granted Full applications Extension Windows or glazing 27 docs
Other full applications applications
In Sunderland
-
26/00956/FUL Granted
35 Maud Street Sunderland SR6 9EJ
Installation of a dog grooming pod to change of use from incidental residential use to a home-based dog grooming business to the rear yard. (additional information received 30.06.2026)
-
25/01853/FUL Withdrawn
Land At Camberwell Way Field Camberwell Way Sunderland SR3 3BE
The installation of a 40 metre high lattice tower supporting 6 no. antennas and 4 no. transmission dishes with 3 no. equipment cabinets, and ancillary development thereto within fenced compound (Preliminary Ecological Appraisal received 13.02.2026, Supplementary Supporting Statement received 13.03.2026, and Biodiversity Net Gain Information received 15.05.2026).
-
26/00959/FUL Withdrawn
19 Lapwing Close Ayton Washington NE38 0ET
Erection of single storey extensions to the side, rear, bow windows to front with render finish with erection of dormers on the east and west elevations, erection of new front porch.
-
26/01857/FUL Awaiting decision
15 Dundas Street Sunderland SR6 0AY
Change of use from student accommodation to supported residential accommodation (Use Class C2) with no external alterations.(Retrospective)
-
26/00839/FUL Withdrawn
Land To Side Of 2 Hawthorn Avenue Sunderland SR3 1DU
Change of use of open space to private garden including the erection of boundary fencing and stopping up of highway.