Planning application

Land At Silksworth Road Sunderland

Decided Sunderland 18/00976/OHL Overhead Electricity Lines

Decided. The decision notice on the council portal carries the outcome in full, including any conditions.

Proposal

Replace the existing Bare Wire Overhead Line with an Aerial Bunched Conductor (ABC) which is modern equivalent.

As published by the council, reference 18/00976/OHL

Application record

Reference
18/00976/OHL
Type
Overhead Electricity Lines
Status
Decided
Decision
No Observations
Received
5 Jun 2018
Validated
5 Jun 2018
Decided
6 Jun 2018
Ward
Silksworth
Decision by
Delegated Decision

Timeline

Dates from the published record

  1. 5 Jun 2018

    Received by Sunderland

  2. 6 Jun 2018

    Decision issued: No Observations

  3. 29 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

2 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

After the decision

Sunderland has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.

About less common application types

This application sits outside the common categories, and the council record linked on this page sets out the specific procedure that applies. More in our guide to planning application types.

In Sunderland

  • 26/01803/MAW Awaiting decision

    Thompsons Of Prudhoe Quarry Springwell Road Springwell Gateshead NE9 7SQ

    Installation of concrete batching plant, including aggregate hoppers, mixing machine, storage silos and aggregate storage bays (part retrospective)

    Received 19 Aug, published by the council 1 Sep 2026 Other
  • 26/01784/MAW Awaiting decision

    Thompsons Of Prudhoe Quarry Springwell Road Springwell Gateshead NE9 7SQ

    Installation of area of concrete hardstanding

    Received 17 Aug, published by the council 1 Sep 2026 Other
  • 26/01687/MAW Awaiting decision

    Eppleton Quarry Downs Pit Lane/Lindsay Street Hetton-le-Hole Houghton-le-Spring DH5 9NH

    The extraction of sand and limestone from Eppleton Quarry up until 2048 (a time extension of 8 years) and the importation of 5.6 million tonnes of material over a 21-year period to infill the resulting void and to restore the quarry. Restoration as extension to Hetton Lyons Country Park. At Eppleton Quarry, Downs Pit Lane, Hetton le Hole

    Received 4 Aug, published by the council 19 Aug 2026 Other
  • 26/01691/HY4 Awaiting decision

    Land To The North Of A1290 Washington.

    Hybrid Application comprising 442 dwellings (C3 use) including details of the means of access served from the A1290, earthworks, landscaping, public open space and drainage attenuation (full application), and construction of employment floorspace (Use Class (B8) with ancillary (E(g)(i)) office associated servicing and infrastructure, including sub-station, car parking, service yards and circulation space, drainage attenuation, earthworks and landscaping (outline application all matters reserved).

    Received 4 Aug, published by the council 23 Aug 2026 Other
  • 26/01596/LP3 Awaiting decision

    Usworth Recreation Park Manor Road Concord Washington

    Repair of fire damaged building including amendments to the front elevations. Existing stepped access/doorway to the left side of the front elevation to be infilled with timber studs and new window opening installed. Existing external sand/cement render to be stripped off and new vented cavity system constructed and finished with silicone render system and replacement PVCu windows

    Received 21 Jul, published by the council 9 Sep 2026 Other