Planning application
S.26/1012/DISCON
Land North Of Bath Road Bath Road Leonard Stanley Gloucestershire
Proposal
Discharge of condition 12 (materials), 13 (CEMP), 19 (CMP), 22 (crossing point) and 29 (contaminated land) from S.24/1165/FUL
As published by the council, reference S.26/1012/DISCON
Timeline
Dates from the published record
-
10 Jun 2026
Received by Stroud
-
17 Jun 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Stroud for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
S.26/1013/VAR Awaiting decision
Land To East Of Seven Waters Bath Road Leonard Stanley Gloucestershire
Variation of Conditions 2 (Approved plans), 6 (SuDS Strategy), 9 (Hard & Soft Landscaping), 10 (Proposed Street Tree Planting), 12 (Material Samples), 20 (Vehicle Parking, Turning and Manoeuvring Spaces) 21 (Cycle Parking Provision) and Condition 23 (Means of Access) from S.24/1165/FUL.
-
S.26/0598/LBC Refused
2 Seven Waters Bath Road Leonard Stanley Stonehouse Gloucestershire GL10 3LN
Installation of a replacement window and door.
-
S.23/0254/HHOLD Decided
28 Broad Meadow Leonard Stanley Stonehouse Gloucestershire GL10 3PG
Change of use of garage to habitable accommodation & external works
-
S.21/1648/DISCON Decided
7 Tannery Close Leonard Stanley Stonehouse Gloucestershire GL10 3PH
Discharge of condition 5 (CEMP) from the application S.21/0970/HHOLD.
-
2014/1248/WIG Decided
Chapel House The Street Leonard Stanley Stonehouse Gloucestershire GL10 3NR
Erection of one dwelling.
-
S.21/1487/HHOLD Decided
2 St Swithins Marsh Road Leonard Stanley Stonehouse Gloucestershire GL10 3NF
Erection of two storey side extension, single storey rear extension and attic conversion with dormer.
Other conditions applications
In Stroud
-
S.26/1021/DISCON Decided
The White House Cam Dursley Gloucestershire GL11 5JA
Discharge of condition 3 (roof light) from S.26/0203/LBC.
-
S.26/1133/DISCON Decided
Workshop At Home Farm Park Lane Stancombe Dursley Gloucestershire GL11 6AT
Discharge of condition 4 (pre-commencement contaminated land) from S.26/0268/VAR.
-
S.26/0970/DISCON Split decision
Former Cotswold Indoor Bowls Club Merrywalks Stroud Gloucestershire
Discharge of conditions 3 (PRE-COM Soft & Hard Landscaping), 4 (PRE-COM site levels), 6 (PRE-COM Details of windows/door openings), 7 (PRE-COM Construction Management Plan), 8 (PRE-COM Pedestrians), 10 (PRE-COM Surface Water Drainage System), 11 (Pre-Occ Flood Evacuation Plan), 12 (PRE-OCC details of plant & machinery) & 16 (Contamination 1) from S.23/0402/FUL.
-
S.26/0849/DISCON Refused
Land At Colethrop Farm Bath Road Hardwicke Gloucester Gloucestershire
Discharge of condition 12 (contaminated land) from S.15/1498/VAR for parcels R2, R6, R8 and R10b only
-
S.25/1588/DISCON Decided
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Discharge of condition 8 (ground and floor levels), 17 (archaeology), 18 (detailed drainage strategy), 19 (SuDS), 21 (CEMP), 22 (landscape and habitat management plan), 23 (ecological design strategy), 24 (arboricultural protection method statement), 26 (tree and hedgerow retention method statement), 27 (external lighting assessment), 36 (construction method statement and construction traffic management plan), 44 (cycle parking), 46 (construction noise management plan) and 53 (employment and skills plan) from S.19/1418/OUT.