Planning application
Land To The East Of Ram Inn High Street South Woodchester Stroud Gloucestershire
Works: New dwelling Domestic
Read from the description, not a valuation. How we read the register
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Erection of detached dwelling house. (Resubmission of S.22/2130/FUL).
As published by the council, reference S.23/0218/FUL
Application record
- Reference
- S.23/0218/FUL
- Type
- Full Planning Application
- Status
- Application Withdrawn
- Decision
- Withdrawn
- Received
- 3 Feb 2023
- Validated
- 8 Feb 2023
- Decided
- 4 Apr 2023
- Ward
- Amberley & Woodchester Ward
- Parish
- Woodchester Parish Council
- Decision by
- Delegated Decision
Timeline
Dates from the published record
-
3 Feb 2023
Received by Stroud
-
8 Feb 2023
Validated
Checked as complete and ready for consideration.
-
4 Apr 2023
Decision issued: Withdrawn
-
20 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Stroud decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Ram Inn High Street South Woodchester Stroud Gloucestershire GL5 5EL
Non-material amendment to application S.18/1039/FUL - addition of French doors and glazed balustrade.
Refused Amendments Windows or glazing 4 docs -
Woodlands Station Road Woodchester Stroud Gloucestershire GL5 5EQ
T1 Ash Tree - Fell.
Granted Trees 4 docs -
1 Churches Mill Station Road Woodchester Stroud Gloucestershire GL5 5EQ
1. Seven semi-mature Alder stems and 1 semi-mature Sycamore stem on the riverbank. Fell by sections to near ground level. 2. Alders to side of the house. Remove up to 4 branches completely.
Granted Trees -
The Limes Station Road Woodchester Stroud Gloucestershire GL5 5EQ
T1-T10 Lime trees - Remove all subsequent regrowth back to the pollarded height of 3.5m
Granted Trees 5 docs -
The Old Cottage High Street South Woodchester Stroud Gloucestershire GL5 5EL
Erection of an oak framed carport with lean-to log store.
Granted Householder 8 docsDomestic -
Cromwell High Street South Woodchester Stroud Gloucestershire GL5 5EL
Single storey porch/boot-room to front of house.
Decided Extension 2 docsSmall domestic
Other full applications
In Stroud
-
S.26/1837/FUL Awaiting decision
Prince Albert Inn Rodborough Hill Stroud Gloucestershire GL5 3SS
Erection of oak frame pergolas for covered walkway & seating area in pub garden to support solar panels (retrospective)
-
S.26/1846/FUL Awaiting decision
The Venns Sanigar Lane Newtown Berkeley Gloucestershire GL13 9NF
Erection of two dwellings (Class C3).
-
S.26/1744/FUL Awaiting decision
High Hill Farm Inglestone Common Badminton Gloucestershire GL9 1DA
Stationing of a temporary agricultural workers dwelling
-
S.26/1731/FUL Awaiting decision
St Dominics Roman Catholic Primary School St Marys Hill Inchbrook Stroud Gloucestershire GL5 5HP
Change of use of existing F1 building to Residential (C3). Part demolition, conversion and extension of existing building to form a dwelling. Construction of new dwelling adjacent. New boundary treatments, vehicle access, parking, cycle and refuse storage.
-
S.26/1732/FUL Awaiting decision
St Dominics Roman Catholic Primary School St Marys Hill Inchbrook Stroud Gloucestershire GL5 5HP
Change of use of existing F1 building to Residential (C3). Part demolition, extension and conversion of existing building to form two dwellings. New parking, cycle and refuse storage