Planning application
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Decided. The decision notice on the council portal carries the outcome in full, including any conditions.
Proposal
Proposed access and parking associated with the training pitches approved under application S.21/1739/FUL
As published by the council, reference S.22/1952/FUL
Application record
- Reference
- S.22/1952/FUL
- Type
- Full Planning Application
- Status
- Permitted
- Decision
- Permission
- Received
- 5 Sep 2022
- Validated
- 5 Sep 2022
- Decided
- 5 Apr 2023
- Ward
- Severn Ward
- Parish
- Eastington Parish Council
- Decision by
- Delegated Decision
Site history
Applications at this address on the Stroud register
This site has had 9 applications since 2021: 4 approved, 0 refused.
-
S.26/0527/FUL Decided
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Installation of replacement security gate and fencing at site entrance including rising bollards.
-
S.25/1827/ADV Granted
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Integration of Forest Green Rovers logo on gate.
-
S.25/1826/FUL Decided
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Installation of a replacement gate and fencing at site entrance.
-
S.25/1793/MINAM Granted
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Non-material amendment to condition 5 (tree diameter) from S.25/0515/FUL - amendment to wording of condition 5.
-
S.25/1684/TCA Granted
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Crack Willow (Salix Fragilis) T1 - Fell.
-
S.25/1588/DISCON Decided
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Discharge of condition 8 (ground and floor levels), 17 (archaeology), 18 (detailed drainage strategy), 19 (SuDS), 21 (CEMP), 22 (landscape and habitat management plan), 23 (ecological design strategy), 24 (arboricultural protection method statement), 26 (tree and hedgerow retention method statement), 27 (external lighting assessment), 36 (construction method statement and construction traffic management plan), 44 (cycle parking), 46 (construction noise management plan) and 53 (employment and skills plan) from S.19/1418/OUT.
-
S.23/1484/REM Granted
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Application for the approval of reserved matters (layout, scale, external appearance of the stadium and the landscaping of the site) from Outline permission S.19/1418/OUT for 5000-capacity football stadium
-
2021/0517/EIAS Decided
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Request for a formal EIA Scoping Opinion for a proposed Eco-Park development comprising a 5,000 capacity football stadium, indoor and outdoor playing pitches, academy building, up to 40,000 sq. metres of Class E and 20,000 sq. metres of B2/B8 employment floorspace, a hotel with up to 100 beds, a Care Village including a 70 bed Care Home, as well as associated access, parking, landscaping and other ancillary works
Timeline
Dates from the published record
-
5 Sep 2022
Received by Stroud
-
5 Apr 2023
Decision issued: Permission
-
20 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsAfter the decision
Stroud has decided this application; the outcome above is the register's own wording and the decision notice on the council portal carries the detail. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Non-material amendment to condition 5 (tree diameter) from S.25/0515/FUL - amendment to wording of condition 5.
Granted Amendments Trees 5 docs -
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Integration of Forest Green Rovers logo on gate.
Granted Advertising 11 docs -
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Installation of a replacement gate and fencing at site entrance.
Decided Full applications 11 docs -
Land At M5 Junction 13 West Of Stonehouse Eastington Gloucestershire
Installation of replacement security gate and fencing at site entrance including rising bollards.
Decided Full applications 8 docs -
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 32 (flood mitigation) from S.24/1595/VAR. (Site wide).
Decided Conditions 9 docs -
Stroudwater Canal Phase 1B Eastington Gloucestershire
Discharge of condition 7 (canal channel bank design) for Phase 5 and 12 from S.26/0143/VAR.
Decided Conditions 8 docs
Other full applications
In Stroud
-
S.26/1451/FUL Awaiting decision
Roys Barn Ashmead Cam Dursley Gloucestershire GL11 5HJ
Erection of an agricultural storage building.
-
S.26/1523/FUL Awaiting decision
Ivy Cross Farm Oxlynch Lane Standish Stonehouse Gloucestershire GL10 3DH
Erection of a farm building.
-
S.26/1411/FUL Awaiting decision
William Morris School Chipmans Platt Stonehouse Gloucestershire GL10 3SH
Construction Of New Multi Use Games Area
-
S.26/1309/FUL Awaiting decision
J-Shed & E-Shed Go-pak Group Howard Tenens (Sharpness) Ltd Severn Distribution Park Burma Road Sharpness Berkeley Gloucestershire GL13 9UQ
Erection of an enclosed link between Unit J and Unit E (retrospective)
-
S.26/1467/FUL Awaiting decision
Folly Cottage Gloucester Road Painswick Stroud Gloucestershire GL6 6TA
Change of use of land to residential (Class C3) and erection of a subterranean garage.