Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To The Front Of 1-3 Trinity View Yarm Road Eaglescliffe Stockton-On-Tees TS16 9AB

Granted Stockton-on-Tees 22/2563/FUL Full Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Retrospective application for the erection of 1.6m wooden slat fence along the 30m frontage of the gardens at Trinity View with Yarm Road.

As published by the council, reference 22/2563/FUL

Application record

Reference
22/2563/FUL
Type
Full Application
Status
Decided
Decision
Approved with Conditions
Received
19 Dec 2022
Validated
24 Feb 2023
Decided
18 Apr 2023
Ward
Eaglescliffe (Pre May 2023)
Parish
Preston-on-Tees Parish Council
Decision by
Delegated Decision
Postcode
TS16 9AB

Timeline

Dates from the published record

  1. 19 Dec 2022

    Received by Stockton-on-Tees

  2. 24 Feb 2023

    Validated

    Checked as complete and ready for consideration.

  3. 18 Apr 2023

    Decision issued: Approved with Conditions

  4. 17 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 1 Quarry Road Eaglescliffe TS16 9BD

    21/1254/FUL Submitted 4 May 2021 44m away

    Erection of a first floor side extension with rendering to all elevations.

    Granted Full applications Extension 8 docs
  • 33 Clifton Avenue Eaglescliffe Stockton-on-Tees TS16 9AZ

    23/0071/FUL Submitted 16 Jan 2023 70m away

    Erection of a two storey extension to side and single storey extension to rear

    Granted Full applications Extension 7 docs
    Small domestic
  • 548 Yarm Road Eaglescliffe Stockton-on-Tees TS16 0BX

    26/1450/FUL Submitted 28 Jul 2026 87m away

    96% historically approved · decision due ~23 Sep

    Application to convert detached rear garage to residential annexe, including erection of store to side

    Awaiting decision Full applications 19 docs
  • Witham Lodge Witham Avenue Eaglescliffe Stockton-On-Tees TS16 0FD

    24/1710/X Submitted 7 Oct 2024 87m away

    Application to crown lift to 3m 4no Sycamore trees (T5,T7, T8 and T9), crown lift to 3m and prune to clear the property by 2m 1no Sycamore tree (T13), crown lift to 3m, crown clean/deadwood and prune to clear the property by 2m 1no Oak (T15), crown lift to 3m and prune to clear the street light by 1m 1no Walnut tree (T18), crown lift to 3m, prune to clear the property by 4m and remove the deadwood 1no Sycamore tree (T22), crown lift to 3m and prune to clear the property by 4m 1no Elm (T25) and crown lift to 3m 1no Sycamore tree (T27) of tree preservation order 61 (00.8.5.78)

    Granted Trees 5 docs
  • Witham Lodge Witham Avenue Eaglescliffe TS16 0FD

    24/1715/SEC Submitted 8 Oct 2024 94m away

    Section 211 notice to crown lift to 2.2m and crown clean/deadwood 1no Laburnum tree (T1), crown lift to 2.2m and prune away from adjacent property by 1m to 1no Cherry tree (T2), crown lift to 2.2m 1no Cherry tree (T3), crown lift to 3m 1no Whitebeam tree (T6), remove the steak, crown lift to 3m and prune to clear property by 2m 1no Cherry tree (T12), crown lift to 2.2m 1no Laburnum (T16), fell 1no Sycamore tree (T19), crown lift to 2.2m 1no Cherry tree (T20), remove the lowest branch back to the main stem 1no Ash tree (T23), crown lift to 2m 1no Hawthorn tree (T24), crown lift to 3m 1no Cherry tree (T28), fell 1no Sycamore tree (T29) and remove the self sown Ash tree at the base of this tree to 1no Rowan tree (T30)

    Decided Trees 5 docs
  • 19 Clifton Avenue Eaglescliffe Stockton-on-Tees TS16 9BA

    23/0166/FUL Submitted 27 Jan 2023 107m away

    Erection of single storey extension to existing garage to include canopy to front.

    Granted Full applications Extension 7 docs
    Small domestic

In Stockton-on-Tees

  • 26/1391/FUL Refused

    Land Adjacent To 50 Yarm Lane Stockton-on-tees

    Installation of 1no Street Hub Unit

    15 Jul 2026 Full applications
  • 26/1669/FUL Awaiting decision

    18 Rissington Walk Thornaby Stockton-On-Tees TS17 9QJ

    Erection of single storey wrap around extension to the side and rear (demolition of existing conservatory)

    28 Aug 2026 Full applications
  • 26/1270/FUL Granted

    6 Mount Grove Norton Stockton-On-Tees TS20 1JX

    Erection of a single storey extension to rear/side

    26 Jun 2026 Full applications
  • 26/1187/FUL Granted

    1 Benton Close Billingham TS23 3XL

    Erection of single storey front extension (Window alterations to sides)

    15 Jun 2026 Full applications
  • 26/0594/FUL Granted

    13 Eastbourne Avenue Egglescliffe Stockton-On-Tees TS16 9BZ

    Erection of single storey rear extension (demolition of existing rear extension).

    24 Mar 2026 Full applications