Planning application
9 Mallard Lane Norton Stockton-on-Tees TS20 1NE
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Prior notification for the erection of single storey extension to the rear (length 3.94m, height to eaves 2.99m and overall height 3.55m).
As published by the council, reference 18/1493/PDE
Application record
- Reference
- 18/1493/PDE
- Type
- General Permitted Development Extensions
- Status
- Decided
- Decision
- Granted As published: Granted - No Objection(s) Received
- Received
- 26 Jun 2018
- Validated
- 26 Jun 2018
- Decided
- 24 Jul 2018
- Ward
- Norton West (Pre May 2023)
- Decision by
- Delegated Decision
- Postcode
- TS20 1NE
Timeline
Dates from the published record
-
26 Jun 2018
Received by Stockton-on-Tees
-
24 Jul 2018
Decision issued: Granted - No Objection(s) Received
-
20 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Stockton-on-Tees granted permission on 24 July 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
8 Dove Lane Norton Stockton-on-Tees TS20 1NY
Application to fell to ground level and grind stump 1no fir tree, to crown reduce/shape all round by 25% 2no plum trees to reduce their size and spread in order to improve visual form and balance subject to TPO 616 (00.8.5.616)
Granted Trees 6 docs -
1 Mallard Lane Norton TS20 1NE
Erection of a two storey side extension to include a pitched roof and alterations to openings at the rear (demolition of existing garage).
Granted Full applications Extension Demolition 8 docs -
21 Station Road Norton TS20 1NH
Construction of a detached double garage and store room. (Demolition of existing garage.)
Granted Full applications Demolition 13 docs -
Casita 3 Dove Lane Norton Stockton-on-Tees TS20 1NY
Application to crown reduce 1no Beech Tree (T1) by 25% of tree preservation order 114 (00.8.5.127)
Granted Trees 7 docs -
Casita 3 Dove Lane Norton Stockton-on-Tees TS20 1NY
97% historically approved · decision due ~15 Sep
Application to remove the 3 lowest limbs of 1no Beech Tree (T5) of Tree Preservation Order 114 (00.8.5.127)
Awaiting decision Trees 6 docs -
16 Raven Lane Norton Stockton-on-Tees TS20 1LY
Erection of a single storey extension to the rear and replacement of an existing flat roof with a pitched roof with hipped end.
Granted Full applications Extension 11 docsSmall domestic
Other prior approval applications
In Stockton-on-Tees
-
26/1647/DEM Awaiting decision
Castle Eden Walkway Wynyard TS21 3HX
Prior notification for the demolition of 2No. bridges
-
26/1648/PN Awaiting decision
Land Off Cleasby Way Cleasby Way Durham Lane Industrial Park Eaglescliffe
Prior notification for the design and external appearance of electricity substation enclosure
-
26/1593/PDE Awaiting decision
42 Hambleton Square Billingham Stockton-On-Tees TS23 2RY
Prior notification for the erection of a single storey rear extension (length 6m, height to eaves 2.4m and overall height 2.8m)
-
26/1326/PDA Granted
Land West Of Grindon Villa Grindon Lane Thorpe Thewles
Prior notification for the erection of 1No. agricultural storage building
-
26/1179/PDE Granted
21 Hugill Close Yarm Stockton-On-Tees TS15 9SS
Prior notification for the erection of a single storey extension to the rear (length 6m, height to eaves 2.7m and overall height 3.5m)