Skip to content
PlanIndex Get alerts
Menu

Planning application

Hub 8 Pepper Works Unit 1 Pepper Road Bramhall Moor Industrial Park Sttockport SK7 5DP

Granted Stockport DC/084673 Lawful Development Certificate Proposed

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application for a Lawful Development Certificate for a Proposed Use of Hub 8, Pepperworks, Unit 1, Pepper Road, as a Licensed Private Hire Operating Centre (Use Class E(g)).

As published by the council, reference DC/084673

Application record

Reference
DC/084673
Type
Lawful Development Certificate Proposed
Status
Decided
Decision
Granted
Received
18 Mar 2022
Validated
8 Sep 2022
Decided
4 Nov 2022
Ward
Norbury And Woodsmoor (Step)
Decision by
Delegated Decision
Postcode
SK7 5DP

Timeline

Dates from the published record

  1. 18 Mar 2022

    Received by Stockport

  2. 8 Sep 2022

    Validated

    Checked as complete and ready for consideration.

  3. 4 Nov 2022

    Decision issued: Granted

  4. 13 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Stockport granted permission on 4 November 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About lawful development applications

A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • Pepper House Pepper Road Hazel Grove Stockport SK7 5DP

    DC/087363 Submitted 6 Dec 2022 50 yards away

    89% historically approved · decision due ~31 Jan

    Part demolition of Pepper House, refurbishment of one remaining block (Use Classes E(g)(i), E(g)(iii) and B2), erection of 2 blocks providing industrial floorspace (Use Classes E(g)(iii) and B2), erection of 3 blocks providing light industrial floorspace (Use Class E(g)(iii)), erection of an office block (Use Class E(g)(i)) and creation of a business hub (Use Class E(g)(i)) containing a cafe (Use Class E(b)) to the front of the site, together with internal road layout alterations and parking.

    Awaiting decision Full applications Demolition 114 docs
  • Pepper House Pepper Road Hazel Grove Stockport SK7 5DP

    DC/081024 Submitted 4 May 2021 50 yards away

    Non-material amendment to DC/074940 to allow phasing of the development

    Withdrawn Amendments 4 docs
  • 130 Bramhall Moor Lane Hazel Grove Stockport SK7 5AU

    DC/080079 Submitted 6 Mar 2021 150 yards away

    Application for approval of details reserved by condition 2 (materials) of DC/071466.

    Granted Conditions 3 docs
  • RUTTERS LANE PCO1 BRAMHALL MOOR LANE HAZEL GROVE STOCKPORT SK7 5AU

    DC/080887 Submitted 26 Apr 2021 150 yards away

    Proposed removal of pay phone and kiosk

    Granted Telecoms 2 docs
  • Pepper Road Hazel Grove Stockport SK7 5BX

    DC/081295 Submitted 26 May 2021 150 yards away

    Notification for Prior Approval for proposed telecommunications installation: The installation of a 20 metre high monopole supporting 6 no. antennas and 2 no. transmission dishes, 4 no. equipment cabinets and development works ancillary thereto.

    Withdrawn 5 docs
  • 15 Hawthorn Avenue Hazel Grove Stockport SK7 5DX

    DC/098958 Submitted 29 Apr 2026 200 yards away

    Single Storey Rear Extension

    Granted Lawful development Extension 7 docs
    Small domestic

In Stockport

  • DC/100075 Granted

    All Flats Marsland House 15 High Street Stockport SK1 1EG

    Remediation works comprising the removal and replacement of existing cladding and spandrel panels on a like-for-like basis. Replacement materials will match the existing specification and appearance to ensure no material change to the external appearance of Marsland House.

    Received 26 Aug, published by the council 16 Sep 2026 Lawful development
  • DC/099847 Refused

    10 Cravenwood Road North Reddish Stockport SK5 6PQ

    Continued intermittent use of the dwellinghouse for short term letting for no more than 90 nights in any calendar year, solely during periods when the property is not occupied by the applicant, with the property remaining the applicant's principal UK residence.

    Received 3 Aug, published by the council 13 Aug 2026 Lawful development
  • DC/100179 Granted

    10 Seymour Road Cheadle Hulme Cheadle Stockport SK8 6LR

    New loft conversion with new rear facing box dormer; new rooflights to front; and other associated external alterations.

    Received 11 Sep, published by the council 16 Sep 2026 Lawful development
  • DC/100161 Granted

    14 Mouldsworth Avenue Heaton Chapel Stockport SK4 5LB

    Erection of a single storey rear extension projecting no more than 3 metres from the existing rear elevation of the dwelling, together with internal alterations to the existing kitchen and rear room to create an open-plan kitchen/dining/living space. The extension will provide additional residential floor space and will form part of the existing kitchen/dining area. The proposed extension will be used as additional residential accommodation and will remain ancillary to the existing dwelling. No change of use is proposed and the property will remain a single residential dwelling.

    Received 9 Sep, published by the council 19 Sep 2026 Lawful development
  • DC/100138 Granted

    53 Chapel Street Heaton Mersey Stockport SK4 3AH

    Single storey extension to the rear of the property to increase the size of the kitchen. 3 metre in length and 3.905 metres in width with bi fold doors across the back Matched brick on outside block - block on the inside and 100mm cavity with compliant insulation to suit. Skylights will be fitted in the roof of the extension. Reroute and add connection for the extra toilet. rerouting because the existing is in the way of the foundations so needs moving over 600mm with new ress bend and all new PVC pipe and underground pipe for downstairs loo

    Received 8 Sep, published by the council 19 Sep 2026 Lawful development