Planning application
Lower Bellfield House Ground Floor 9 Upper Bridge Street Stirling FK8 1ER
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of Annexe to existing dwellinghouse
As published by the council, reference 26/00387/FUL
Application record
- Reference
- 26/00387/FUL
- Type
- Full
- Status
- Awaiting decision
- Received
- 30 Jul 2026
- Validated
- 30 Jul 2026
- Ward
- Ward 4 Stirling North
- Postcode
- FK8 1ER
Timeline
Dates from the published record
-
30 Jul 2026
Received by Stirling
-
12 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 24 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Stirling took a median of 57 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
15 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
The process from here
This application is with Stirling for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Lower Bellfield House Ground Floor 9 Upper Bridge Street Stirling FK8 1ER
Removal of Sycamore
Withdrawn Trees -
8 Upper Bridge Street Stirling FK8 1ER
Erection of radio antenna (renewal of temporary consent Ref: S/99/00194/HAE)
Granted Full applications -
9 Upper Bridge Street Stirling FK8 1ER
Reinstatement of lime render, repair of damaged window mouldings to front elevation & application of lime paint
Granted Heritage and listed buildings Windows or glazing -
-
11A Upper Bridge Street Stirling FK8 1ER
Crown lift lime tree and crown reduce oak, holly and handkerchief tree
Decided Trees 2 docs -
11 Castle Court Stirling FK8 1EL
Replacement of all 6no. timber-framed, single-glazed windows with style-matched PVC double-glazed window units
Withdrawn Heritage and listed buildings Windows or glazing
Other full applications applications
In Stirling
-
26/00207/FUL Granted
23 Newmarket Bannockburn
Change of use of first floor and attic to form 3no. flats
-
26/00307/FUL Granted
Glenbrae Glen Road Dunblane FK15 0DS
Demolition of existing lean-to-greenhouse attached to house and installation of new greenhouse
-
26/00341/FUL Granted
Reservoir Keeper 18 Carron Valley Carronbridge FK6 5JL
Proposed single storey extension to dwelling house
-
26/00338/FUL Granted
20A Melville Terrace Stirling FK8 2NQ
Single storey side extension and installation of entrance gates
-
26/00318/FUL Granted
34 Branziert Road North Killearn G63 9RF
Erection of a rear dormer and formation of raised patio area