Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat Courtyard Lower Ground Left Brentham Park House Brentham Crescent Stirling FK8 2BA

Awaiting decision Stirling 26/00382/LBC Listed Building Consent

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Internal and external alterations including: relocation of Kitchen, installation of sink waste pipe & extract fan through existing external wall, removal of existing Bathroom door & build up of opening and formation of new door opening from proposed new Bedroom to provide access to En Suite.

As published by the council, reference 26/00382/LBC

Application record

Reference
26/00382/LBC
Type
Listed Building Consent
Status
Awaiting decision
Received
30 Jul 2026
Validated
30 Jul 2026
Ward
Ward 5 Stirling West
Parish
Kings Park Community Council
Postcode
FK8 2BA

Timeline

Dates from the published record

  1. 30 Jul 2026

    Received by Stirling

  2. 5 Aug 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 24 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Stirling took a median of 57 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Stirling for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About heritage and listed buildings applications

How this application type works

Heritage applications concern listed buildings and conservation areas. Listed building consent is needed for works, inside or out, that affect the special interest of a listed building, and carrying out such works without consent is a criminal offence. The council weighs harm to the heritage asset against any public benefit of the proposal.

More on heritage and listed buildings applications in our guide

Nearby applications

Within 500 metres

In Stirling

  • 26/00322/LBC Granted

    Bell And Craig Solicitors - Albert House 4 Albert Place Kings Park Stirling FK8 2QL

    Installation of sign (nameplate) on front elevation

    24 Jun 2026 Heritage and listed buildings
  • 26/00454/LBC Awaiting decision

    5 Snowdon Place Kings Park Stirling FK8 2NH

    Refurbishment of existing windows and insertion of astragals into existing upper sashes

    1 Sep 2026 Heritage and listed buildings
  • 26/00326/LBC Granted

    6 Abercromby Place Kings Park Stirling FK8 2QP

    Replacement of window to rear elevation

    26 Jun 2026 Heritage and listed buildings
  • 26/00279/LBC Withdrawn

    Formerly New Look 36 Port Street Stirling FK8 2LD

    New signage and shopfront, and fit out of shell unit to form coffee shop (Unit 2)

    5 Jun 2026 Heritage and listed buildings
  • 26/00225/LBC Granted

    5 Snowdon Place Kings Park Stirling FK8 2NH

    External works including removal of existing cementitious render on the side elevation and replacement with roughcast render, installation of tile vents on roof, erection of side extension on ground floor and adjoining external stores, demolition of existing side garage and rear conservatory, replacing existing double doors through to conservatory with single door, erection of decking from the house with steps down to patio and erection of wall with gate. Internal works including conversion of side window to door, removal of internal walls and blocking of existing doorway, conversion of dressing room to bathroom with installation of soil stack and conversion of bathroom to bedroom

    4 May 2026 Heritage and listed buildings