Planning application

26/00004/FUL

5 Clarendon Place Kings Park Stirling FK8 2QW

Granted Stirling Full

Proposal

Works to roof including chimney works, replacement of slates, rainwater goods, installation of downpipe with adjustment to soil vent pipe and gutter, remove pipe penetration through roof and make good roof using reclaimed slate, replace chimney pots, repoint mortar, install replacement of rooflights and install EV charger port

As published by the council, reference 26/00004/FUL

Timeline

Dates from the published record

  1. 7 Jan 2026

    Received by Stirling

  2. 12 Jan 2026

    Validated

    Checked as complete and ready for consideration.

  3. 10 Mar 2026

    Decision issued: Approve with Conditions

  4. 28 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 26/00005/LBC Granted

    5 Clarendon Place Kings Park Stirling FK8 2QW

    Works to roof including chimney works, replacement of slates, rainwater goods, installation of downpipe with adjustment to soil vent pipe and gutter, remove pipe penetration through roof and make good roof using reclaimed slate, replace chimney pots, repoint mortar, install replacement of rooflights and install EV charger port

    7 Jan 2026 11m away Heritage and listed buildings
  • TREENQ-2025-105 Decided

    9 Albert Place Kings Park Stirling FK8 2QL

    Remove red maple tree and formative pruing of rowan and lilac trees

    27 Oct 2025 53m away Trees
  • 26/00182/LBC Granted

    9 Clarendon Place Kings Park Stirling FK8 2QW

    Formation of ground floor shower room including extract terminal through wall

    8 Apr 2026 80m away Heritage and listed buildings
  • 25/00530/LBC Granted

    11 Albert Place Kings Park Stirling FK8 2RE

    Proposed on-site facility for charging an electric vehicle

    29 Sep 2025 87m away Heritage and listed buildings
  • 25/00558/FUL Granted

    11 Albert Place Kings Park Stirling FK8 2RE

    Proposed on-site facility for charging an electric vehicle

    13 Oct 2025 89m away Full applications
  • TREENQ-2026-011 Decided

    1 Abercromby Place Kings Park Stirling FK8 2QP

    Crown reduce Copper Beech by 10% and shape crown accordingly; crown reduce Flowering Cherry by 15%

    4 Feb 2026 99m away Trees

In Stirling

  • 26/00367/FUL Awaiting decision

    5 Auchinlay Holdings Auchinlay Road Dunblane FK15 9NA

    Single storey rear extension

    22 Jul 2026 Full applications
  • 26/00249/FUL Granted

    16 The Glebe Gargunnock FK8 3AX

    Single storey extension to dwellinghouse

    15 May 2026 Full applications
  • 26/00242/FUL Granted

    Outer Limits 71 Barnton Street Stirling FK8 1HH

    Change of use from commercial premises to one bedroom flat

    13 May 2026 Full applications
  • 26/00363/FUL Awaiting decision

    7 Park Avenue Kings Park Stirling FK8 2QR

    New ventilation grills and new cast iron waste pipe

    21 Jul 2026 Full applications
  • 26/00116/FUL Granted

    Land North East Of Pirnhall And South West Of Bannockburn Bannockburn

    Construction of electricity substation to serve new primary school and future residential development (Retrospective)

    6 Mar 2026 Full applications